A platform for research: civil engineering, architecture and urbanism
DOUBLE POST RAHMAN-BRIDGE AND CONSTRUCTION METHOD THEREOF
A double post Rahmen-bridge of the present invention comprises: one side wall (110) and the other side wall (120), respectively formed on one side and the other side; one inner post (211) and one outer post (212) coupled to an upper surface of the one side wall (110) and installed in a standing structure; the other inner post (221) and the other outer post (222) which are coupled to an upper surface of the other side wall (120) and installed in the standing structure; a steel girder (300) having one edge mounted on the upper surface of the one inner post (211) and the one outer post (212), and having the other edge mounted on the upper surface of the other inner post (221) and the other outer post (222); and a bottom plate (400) formed by pouring concrete (C) on the upper region of the one side wall (110) and the other side wall (120) and the upper side of the steel girder (300). In this case, the double post Rahmen-bridge according to the present invention is installed in the same structure as in figure 4. The one inner post (211) and the one outer post (212) are coupled to the upper surface of the one side wall (110) at a distance from each other in a lateral direction. Through the structure, the right leg portion moment generated in a right leg portion can be distributed. As shown in figure 17, in the general steel structure of the Rahmen-bridge, the moment of the right leg portion is large. However, if the double post is used, the moment of the right leg portion can be reduced by dispersing the moment of the right leg portion.
본 발명의 더블포스트 라멘교는 일측과 타측에 각각 형성되는 일측벽체(110) 및 타측벽체(120); 일측벽체(110)의 상면에 결합되어 기립구조로 설치되는 일측내측포스트(211) 및 일측외측포스트(212); 타측벽체(120)의 상면에 결합되어 기립구조로 설치되는 타측내측포스트(221) 및 타측외측포스트(222); 일측내측포스트(211) 및 일측외측포스트(212)의 상면에 일측 가장자리가 거치되고, 타측내측포스트(221) 및 타측외측포스트(222)의 상면에 타측 가장자리가 거치되는 강재거더(300); 일측벽체(110) 및 타측벽체(120)의 상측 영역과 강재거더(300)의 상측에 콘크리트(C)가 타설되어 형성되는 바닥판(400);을 포함한다. 이 경우, 본 발명에 따른 더블포스트 라멘교는 도 4와 같은 구조로 설치된다. 일측내측포스트(211)와 일측외측포스트(212)는 측방향을 따라 상호 간격을 두고 일측벽체(110)의 상면에 결합된다. 이와 같은 구조를 통해 우각부에 발생하는 우각부 모멘트를 분배할 수 있다. 도 17과 같이 일반적인 강절 구조의 라멘교는 우각부의 모멘트가 크게 발생된다. 그러나 더블포스트를 사용하게 되면 우각부의 모멘트를 분산시켜 우각부 모멘트를 줄일 수 있다.
DOUBLE POST RAHMAN-BRIDGE AND CONSTRUCTION METHOD THEREOF
A double post Rahmen-bridge of the present invention comprises: one side wall (110) and the other side wall (120), respectively formed on one side and the other side; one inner post (211) and one outer post (212) coupled to an upper surface of the one side wall (110) and installed in a standing structure; the other inner post (221) and the other outer post (222) which are coupled to an upper surface of the other side wall (120) and installed in the standing structure; a steel girder (300) having one edge mounted on the upper surface of the one inner post (211) and the one outer post (212), and having the other edge mounted on the upper surface of the other inner post (221) and the other outer post (222); and a bottom plate (400) formed by pouring concrete (C) on the upper region of the one side wall (110) and the other side wall (120) and the upper side of the steel girder (300). In this case, the double post Rahmen-bridge according to the present invention is installed in the same structure as in figure 4. The one inner post (211) and the one outer post (212) are coupled to the upper surface of the one side wall (110) at a distance from each other in a lateral direction. Through the structure, the right leg portion moment generated in a right leg portion can be distributed. As shown in figure 17, in the general steel structure of the Rahmen-bridge, the moment of the right leg portion is large. However, if the double post is used, the moment of the right leg portion can be reduced by dispersing the moment of the right leg portion.
본 발명의 더블포스트 라멘교는 일측과 타측에 각각 형성되는 일측벽체(110) 및 타측벽체(120); 일측벽체(110)의 상면에 결합되어 기립구조로 설치되는 일측내측포스트(211) 및 일측외측포스트(212); 타측벽체(120)의 상면에 결합되어 기립구조로 설치되는 타측내측포스트(221) 및 타측외측포스트(222); 일측내측포스트(211) 및 일측외측포스트(212)의 상면에 일측 가장자리가 거치되고, 타측내측포스트(221) 및 타측외측포스트(222)의 상면에 타측 가장자리가 거치되는 강재거더(300); 일측벽체(110) 및 타측벽체(120)의 상측 영역과 강재거더(300)의 상측에 콘크리트(C)가 타설되어 형성되는 바닥판(400);을 포함한다. 이 경우, 본 발명에 따른 더블포스트 라멘교는 도 4와 같은 구조로 설치된다. 일측내측포스트(211)와 일측외측포스트(212)는 측방향을 따라 상호 간격을 두고 일측벽체(110)의 상면에 결합된다. 이와 같은 구조를 통해 우각부에 발생하는 우각부 모멘트를 분배할 수 있다. 도 17과 같이 일반적인 강절 구조의 라멘교는 우각부의 모멘트가 크게 발생된다. 그러나 더블포스트를 사용하게 되면 우각부의 모멘트를 분산시켜 우각부 모멘트를 줄일 수 있다.
DOUBLE POST RAHMAN-BRIDGE AND CONSTRUCTION METHOD THEREOF
더블포스트 라멘교 및 그 시공방법
KIM EUI TAE (author)
2021-04-16
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
PRESTESSED RAHMAN BRIDGE AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2024
|Fazlur Rahman Khan... And Wholeness
British Library Conference Proceedings | 1986
|Elsevier | 1985
|