The present invention relates to a method for constructing a vertical structure using a top-down method, which is able to be constructed by lowering a vertical wall from on the ground toward a lower side of a vertical hole at the same time as excavating the vertical hole. In accordance with the present invention, the method for constructing the vertical structure using the top-down method comprises: a first step to install a temporary structure (100) on the ground; a second step to bury support structures at regular intervals along an inner edge of the temporary structure a third step to install a lowering inducing member (300) on an upper side of the temporary structure; a fourth step to placing the vertical wall (B) on the lowering inducing member at the same time as excavating the vertical hole to a certain depth in the temporary structure; a fifth step to remove an upper end of the support structures exposed to an upper side as much as a certain depth; a sixth step in which the lowering inducing member lowers the vertical wall into the vertical hole for a certain depth; and a seventh step to repeat the fourth to the sixth steps until the vertical wall reaches the target depth.
본 발명은 수직구의 굴착과 동시에 수직구 벽체를 지상에서 수직구 하부로 하강시키면서 시공이 이루어지는 하향식 공법을 이용한 수직구 구조물의 시공방법에 관한 것이다. 본 발명에 따른 하향식 공법을 이용한 수직구 구조물의 시공방법은 지상에 가설구조물(100)이 설치되는 제1단계와, 상기 가설구조물의 내측 가장자리를 따라 일정간격으로 지지구조물을 매설하는 제2단계와, 상기 가설구조물의 상부에 하강유도부재(300)가 설치되는 제3단계와, 상기 가설구조물의 내부에서 수직구가 일정 깊이로 굴착됨과 동시에 상기 하강유도부재에 수직구 벽체(B)가 거치되는 제4단계와, 일정 깊이만큼 상부로 노출된 지지구조물의 상단이 제거되는 제5단계와, 상기 하강유도부재가 상기 수직구 벽체를 수직구 내부로 일정 깊이 하강시키는 제6단계와 상기 수직구 벽체가 목표 깊이에 도달할 때까지 상기 제4단계 내지 제6단계가 반복되는 제7단계를 포함한다.
The present invention relates to a method for constructing a vertical structure using a top-down method, which is able to be constructed by lowering a vertical wall from on the ground toward a lower side of a vertical hole at the same time as excavating the vertical hole. In accordance with the present invention, the method for constructing the vertical structure using the top-down method comprises: a first step to install a temporary structure (100) on the ground; a second step to bury support structures at regular intervals along an inner edge of the temporary structure a third step to install a lowering inducing member (300) on an upper side of the temporary structure; a fourth step to placing the vertical wall (B) on the lowering inducing member at the same time as excavating the vertical hole to a certain depth in the temporary structure; a fifth step to remove an upper end of the support structures exposed to an upper side as much as a certain depth; a sixth step in which the lowering inducing member lowers the vertical wall into the vertical hole for a certain depth; and a seventh step to repeat the fourth to the sixth steps until the vertical wall reaches the target depth.
본 발명은 수직구의 굴착과 동시에 수직구 벽체를 지상에서 수직구 하부로 하강시키면서 시공이 이루어지는 하향식 공법을 이용한 수직구 구조물의 시공방법에 관한 것이다. 본 발명에 따른 하향식 공법을 이용한 수직구 구조물의 시공방법은 지상에 가설구조물(100)이 설치되는 제1단계와, 상기 가설구조물의 내측 가장자리를 따라 일정간격으로 지지구조물을 매설하는 제2단계와, 상기 가설구조물의 상부에 하강유도부재(300)가 설치되는 제3단계와, 상기 가설구조물의 내부에서 수직구가 일정 깊이로 굴착됨과 동시에 상기 하강유도부재에 수직구 벽체(B)가 거치되는 제4단계와, 일정 깊이만큼 상부로 노출된 지지구조물의 상단이 제거되는 제5단계와, 상기 하강유도부재가 상기 수직구 벽체를 수직구 내부로 일정 깊이 하강시키는 제6단계와 상기 수직구 벽체가 목표 깊이에 도달할 때까지 상기 제4단계 내지 제6단계가 반복되는 제7단계를 포함한다.
Method for constructing vertical structure in vertical tunnel using top down method
하향식 공법을 이용한 수직구 구조물의 시공방법
KO EOMSIK (author)
2021-05-03
Patent
Electronic Resource
Korean
Method for constructing vertical structure in vertical tunnel using top down method
European Patent Office | 2022
|Method for constructing vertical structure in vertical tunnel using top down method
European Patent Office | 2022
|Method for constructing vertical structure in vertical tunnel using top down method
European Patent Office | 2022
Method for constructing vertical structure in vertical tunnel using top down method
European Patent Office | 2018
|Method for constructing vertical structure in vertical tunnel using top down method
European Patent Office | 2022