A platform for research: civil engineering, architecture and urbanism
TEMPORARY STRUCTURE FOR ELEVATOR CONSTRUCTION
Provided is a temporary structure for elevator construction, which comprises: H-beams which are arranged to be spaced apart at a predetermined interval at the wall surface of a pit in a building where a plurality of pits are arranged so as to arrange an elevator, and a plurality of frames which are arranged in a state of being spaced apart in a vertical direction at the H-beams; a sound absorption panel, the both distal ends of which are fixedly installed at the frames so as to absorb noise generated on the inside and the outside; and a soundproof panel, the both distal ends of which are fixedly installed at the frames and which are arranged to be layered so as to be overlapped with the sound absorption panel, thereby being able to block noise generated on the inside and the outside. The frames include a bent pipe which is formed in a square pipe vertically bent, has an A surface or a B surface fixedly installed at the H-beams, and is arranged to be spaced apart in a vertical direction from the H-beams respectively. The sound absorption panel includes: a fastening surface which is arranged in a single layer at both side end portions of the sound absorption panel to be fixed to the bent pipe; and a sound absorption surface which is formed at the central portion of the sound absorption panel, and arranged in a multiple layer shape of a first surface and a second surface, so as to absorb noise generated on the inside and the outside. In particular, provided is the temporary structure for elevator construction, wherein the soundproof panel comprises: a plurality of main panels made of a material of high strength which can block noise; and a connecting unit which is arranged between up-and-down directions or left-and-right directions of the main panel in order to successively connect the plurality of main panels in up-and-down directions or left-and-right directions. Therefore, noise generated during the construction of the elevator can be reduced.
엘리베이터 공사용 가설 구조물이 제공된다. 엘리베이터가 배치되는 피트가 다수 개가 배치되는 건물에서, 상기 피트의 벽면에 일정 간격으로 이격되게 배치되는 H빔과, 상기 H빔에 수직 방향으로 이격된 상태로 배치되는 다수 개의 프레임;과 상기 프레임에 양 끝단이 고정 설치되어, 내외부에서 발생되는 소음을 흡수할 수 있는 흡음패널; 및 상기 프레임에 양 끝단이 고정 설치되고, 상기 흡음패널과 겹치도록 층상으로 배치되어, 내외부에서 발생되는 소음을 차단할 수 있는 차음패널;을 포함하고, 상기 프레임은, 수직으로 절곡된 각형관으로 형성되고, A면 또는 B면이 상기 H빔에 고정 설치되되, 상기 H빔과 수직 방향으로 각각 이격되게 배치되는 절곡관;을 포함하고, 상기 흡음패널은, 상기 흡음패널의 양측 단부에 단층으로 배치되어, 상기 절곡관과 고정될 수 있는 체결면; 및 상기 흡음패널의 중심부에 형성되되, 제1면 및 제2면의 다중의 층 형상으로 배치되어, 내외부에서 발생되는 소음을 흡수할 수 있는 흡음면;을 포함하고, 상기 차음패널은, 소리를 차단할 수 있는 고강도의 소재로 형성되는 메인패널; 및 상기 메인패널의 상하 방향 또는 좌우 방향의 사이에 배치되어, 상기 메인패널을 상하 방향 또는 좌우 방향으로 다수 개 연속적으로 연결시킬 수 있는 연결부;를 포함하는, 엘리베이터 공사용 가설 구조물이 제공될 수 있다.
TEMPORARY STRUCTURE FOR ELEVATOR CONSTRUCTION
Provided is a temporary structure for elevator construction, which comprises: H-beams which are arranged to be spaced apart at a predetermined interval at the wall surface of a pit in a building where a plurality of pits are arranged so as to arrange an elevator, and a plurality of frames which are arranged in a state of being spaced apart in a vertical direction at the H-beams; a sound absorption panel, the both distal ends of which are fixedly installed at the frames so as to absorb noise generated on the inside and the outside; and a soundproof panel, the both distal ends of which are fixedly installed at the frames and which are arranged to be layered so as to be overlapped with the sound absorption panel, thereby being able to block noise generated on the inside and the outside. The frames include a bent pipe which is formed in a square pipe vertically bent, has an A surface or a B surface fixedly installed at the H-beams, and is arranged to be spaced apart in a vertical direction from the H-beams respectively. The sound absorption panel includes: a fastening surface which is arranged in a single layer at both side end portions of the sound absorption panel to be fixed to the bent pipe; and a sound absorption surface which is formed at the central portion of the sound absorption panel, and arranged in a multiple layer shape of a first surface and a second surface, so as to absorb noise generated on the inside and the outside. In particular, provided is the temporary structure for elevator construction, wherein the soundproof panel comprises: a plurality of main panels made of a material of high strength which can block noise; and a connecting unit which is arranged between up-and-down directions or left-and-right directions of the main panel in order to successively connect the plurality of main panels in up-and-down directions or left-and-right directions. Therefore, noise generated during the construction of the elevator can be reduced.
엘리베이터 공사용 가설 구조물이 제공된다. 엘리베이터가 배치되는 피트가 다수 개가 배치되는 건물에서, 상기 피트의 벽면에 일정 간격으로 이격되게 배치되는 H빔과, 상기 H빔에 수직 방향으로 이격된 상태로 배치되는 다수 개의 프레임;과 상기 프레임에 양 끝단이 고정 설치되어, 내외부에서 발생되는 소음을 흡수할 수 있는 흡음패널; 및 상기 프레임에 양 끝단이 고정 설치되고, 상기 흡음패널과 겹치도록 층상으로 배치되어, 내외부에서 발생되는 소음을 차단할 수 있는 차음패널;을 포함하고, 상기 프레임은, 수직으로 절곡된 각형관으로 형성되고, A면 또는 B면이 상기 H빔에 고정 설치되되, 상기 H빔과 수직 방향으로 각각 이격되게 배치되는 절곡관;을 포함하고, 상기 흡음패널은, 상기 흡음패널의 양측 단부에 단층으로 배치되어, 상기 절곡관과 고정될 수 있는 체결면; 및 상기 흡음패널의 중심부에 형성되되, 제1면 및 제2면의 다중의 층 형상으로 배치되어, 내외부에서 발생되는 소음을 흡수할 수 있는 흡음면;을 포함하고, 상기 차음패널은, 소리를 차단할 수 있는 고강도의 소재로 형성되는 메인패널; 및 상기 메인패널의 상하 방향 또는 좌우 방향의 사이에 배치되어, 상기 메인패널을 상하 방향 또는 좌우 방향으로 다수 개 연속적으로 연결시킬 수 있는 연결부;를 포함하는, 엘리베이터 공사용 가설 구조물이 제공될 수 있다.
TEMPORARY STRUCTURE FOR ELEVATOR CONSTRUCTION
엘리베이터 공사용 가설 구조물
BAEK IN HYANG (author)
2021-10-18
Patent
Electronic Resource
Korean
TEMPORARY STRUCTURE FOR ELEVATOR CONSTRUCTION FOR EASY STORAGE BY FOLDING
European Patent Office | 2022
|Temporary adjustable protection device for building elevator construction
European Patent Office | 2021
|European Patent Office | 2024
|