A platform for research: civil engineering, architecture and urbanism
Formwork for bridge piers and construction method of piers using the same
According to the present invention, a formwork system for bridge coping, for forming coping (10) formed on a bridge column (1), comprises: a form (100) into which concrete for forming the coping (10) is poured; a main truss (200) installed below the form (100), and having a diameter (b) larger than the diameter (a) of the form; and a lower truss (300) installed below the main truss (200), and having a smaller diameter (c) than the diameter (b) of the main truss (200), and further comprises a screw jack (400) installed between the lower truss (300) and the main truss (200). Therefore, the formwork system can easily install and dismantle the form for coping construction, and can secure a wide space for easy work to prevent workers from falling during installing and dismantling the form for the bridge coping.
본 발명에 따르면, 교량 기둥(1) 상부에 형성되는 코핑(10)의 형성을 위한 교량 코핑용 거푸집 시스템에 있어서, 상기 코핑(10)을 형성하기 위한 콘크리트가 타설되는 거푸집(100); 상기 거푸집(100) 하부에 설치되며 상기 거푸집의 직경(a)보다 더 큰 직경(b)을 갖는 메인트러스(200); 및 상기 메인트러스(200) 하부에 설치되며 상기 메인트러스(200)의 직경(b)보다 더 작은 직경(c)을 갖는 하부트러스(300);를 포함하되, 상기 하부트러스(300)와 상기 메인트러스(200) 사이에 설치되는 스크류잭(400);을 더 포함하는 것을 특징으로 하는 교량 코핑용 거푸집 시스템이 제공된다. 본 발명에 따르면 코핑 시공을 위한 거푸집의 설치 및 해체를 용이하게 수행할 수 있음과 아울러, 교량 코핑용 거푸집의 설치 및 해체에 있어 작업자들의 추락사고가 발생되지 않도록 작업이 용이한 넓은 공간을 확보한 효과가 있다.
Formwork for bridge piers and construction method of piers using the same
According to the present invention, a formwork system for bridge coping, for forming coping (10) formed on a bridge column (1), comprises: a form (100) into which concrete for forming the coping (10) is poured; a main truss (200) installed below the form (100), and having a diameter (b) larger than the diameter (a) of the form; and a lower truss (300) installed below the main truss (200), and having a smaller diameter (c) than the diameter (b) of the main truss (200), and further comprises a screw jack (400) installed between the lower truss (300) and the main truss (200). Therefore, the formwork system can easily install and dismantle the form for coping construction, and can secure a wide space for easy work to prevent workers from falling during installing and dismantling the form for the bridge coping.
본 발명에 따르면, 교량 기둥(1) 상부에 형성되는 코핑(10)의 형성을 위한 교량 코핑용 거푸집 시스템에 있어서, 상기 코핑(10)을 형성하기 위한 콘크리트가 타설되는 거푸집(100); 상기 거푸집(100) 하부에 설치되며 상기 거푸집의 직경(a)보다 더 큰 직경(b)을 갖는 메인트러스(200); 및 상기 메인트러스(200) 하부에 설치되며 상기 메인트러스(200)의 직경(b)보다 더 작은 직경(c)을 갖는 하부트러스(300);를 포함하되, 상기 하부트러스(300)와 상기 메인트러스(200) 사이에 설치되는 스크류잭(400);을 더 포함하는 것을 특징으로 하는 교량 코핑용 거푸집 시스템이 제공된다. 본 발명에 따르면 코핑 시공을 위한 거푸집의 설치 및 해체를 용이하게 수행할 수 있음과 아울러, 교량 코핑용 거푸집의 설치 및 해체에 있어 작업자들의 추락사고가 발생되지 않도록 작업이 용이한 넓은 공간을 확보한 효과가 있다.
Formwork for bridge piers and construction method of piers using the same
교량 코핑용 거푸집 시스템 및 이를 이용한 교량 코핑의 시공방법
KANG DAE BONG (author)
2022-04-01
Patent
Electronic Resource
Korean
PRECAST PIERS AND PRECAST CONSTRUCTION METHOD USING THE SAME PIERS
European Patent Office | 2016
|Engineering Index Backfile | 1893
|PRECAST PIERS AND PRECAST CONSTRUCTION METHOD USING THE SAME PIERS
European Patent Office | 2016
Construction of the Beaver bridge piers
Engineering Index Backfile | 1909