Preloading method for reinforcing pile by total lifting
The present invention relates to a preloading method for a reinforcing pile by total lifting, which lifts a foundation and an entire structure by using a plurality of reinforcing piles as reaction bars to effectively and stably reduce a load of existing piles to sufficiently secure spares of existing piles for an additional load caused by a vertical extension, resolve load imbalance between existing piles and newly installed reinforcing piles, and simply and clearly design foundations and piles. The preloading method for a reinforcing pile by total lifting is to reinforce a foundation when remodeling and vertically extending a structure, the method comprising: (a) a step of forming a plurality of pile installation holes on the foundation of the structure; (b) a step of embedding reinforcing piles in the ground through the pile installation holes; (c) a step of fixing and installing a lifting frame on an upper portion of the foundation at the positions of the pile installation holes, and simultaneously driving a plurality of pressing apparatuses by using a plurality of the reinforcing piles as reaction bars after installing the pressing apparatuses between the upper ends of the reinforcing piles and the lifting frame to simultaneously press the plurality of reinforcing piles to lift the entire structure upwards; and (d) a step of fixing the heads of the reinforcing piles on the foundation, and removing the pressing force of the reinforcing piles.
본 발명은 복수의 보강파일을 반력대로 이용하여 기초 및 구조물 전체를 동시에 리프팅함으로써, 기존 파일의 하중을 효과적이고 안정적으로 경감하여 수직 증축으로 인한 추가 하중에 대한 기존 파일의 여유분을 충분히 확보하고, 기존 파일과 신설되는 보강파일 간 하중 불균형을 해소하며, 기초 및 파일 설계가 단순하고 명확한 토탈리프팅에 의한 보강파일 선행하중 재하 방법에 대한 것이다. 본 발명은 구조물의 리모델링 수직 증축 시 기초를 보강하기 위한 것으로, (a) 구조물의 기초에 복수의 파일설치공을 형성하는 단계; (b) 각 파일설치공을 통해 지반에 보강파일을 근입하는 단계; (c) 상기 각 파일설치공 위치의 기초 상부에 리프팅 프레임을 고정 설치하는 한편, 상기 보강파일의 상단과 리프팅 프레임의 사이에 가압장비를 설치한 후 복수의 상기 보강파일을 반력대로 이용하여 복수의 가압장비를 동시에 구동하여 복수의 보강파일들을 동시에 가압함으로써 구조물 전체를 상향 리프팅하는 단계; 및 (d) 상기 보강파일의 두부를 기초에 고정하고, 보강파일의 가압력을 해제하는 단계; 로 구성되는 것을 특징으로 한다.
Preloading method for reinforcing pile by total lifting
The present invention relates to a preloading method for a reinforcing pile by total lifting, which lifts a foundation and an entire structure by using a plurality of reinforcing piles as reaction bars to effectively and stably reduce a load of existing piles to sufficiently secure spares of existing piles for an additional load caused by a vertical extension, resolve load imbalance between existing piles and newly installed reinforcing piles, and simply and clearly design foundations and piles. The preloading method for a reinforcing pile by total lifting is to reinforce a foundation when remodeling and vertically extending a structure, the method comprising: (a) a step of forming a plurality of pile installation holes on the foundation of the structure; (b) a step of embedding reinforcing piles in the ground through the pile installation holes; (c) a step of fixing and installing a lifting frame on an upper portion of the foundation at the positions of the pile installation holes, and simultaneously driving a plurality of pressing apparatuses by using a plurality of the reinforcing piles as reaction bars after installing the pressing apparatuses between the upper ends of the reinforcing piles and the lifting frame to simultaneously press the plurality of reinforcing piles to lift the entire structure upwards; and (d) a step of fixing the heads of the reinforcing piles on the foundation, and removing the pressing force of the reinforcing piles.
본 발명은 복수의 보강파일을 반력대로 이용하여 기초 및 구조물 전체를 동시에 리프팅함으로써, 기존 파일의 하중을 효과적이고 안정적으로 경감하여 수직 증축으로 인한 추가 하중에 대한 기존 파일의 여유분을 충분히 확보하고, 기존 파일과 신설되는 보강파일 간 하중 불균형을 해소하며, 기초 및 파일 설계가 단순하고 명확한 토탈리프팅에 의한 보강파일 선행하중 재하 방법에 대한 것이다. 본 발명은 구조물의 리모델링 수직 증축 시 기초를 보강하기 위한 것으로, (a) 구조물의 기초에 복수의 파일설치공을 형성하는 단계; (b) 각 파일설치공을 통해 지반에 보강파일을 근입하는 단계; (c) 상기 각 파일설치공 위치의 기초 상부에 리프팅 프레임을 고정 설치하는 한편, 상기 보강파일의 상단과 리프팅 프레임의 사이에 가압장비를 설치한 후 복수의 상기 보강파일을 반력대로 이용하여 복수의 가압장비를 동시에 구동하여 복수의 보강파일들을 동시에 가압함으로써 구조물 전체를 상향 리프팅하는 단계; 및 (d) 상기 보강파일의 두부를 기초에 고정하고, 보강파일의 가압력을 해제하는 단계; 로 구성되는 것을 특징으로 한다.
Preloading method for reinforcing pile by total lifting
토탈리프팅에 의한 보강파일 선행하중 재하 방법
KIM SUNGHO (author)
2022-04-01
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|Method for reinforcing vacuum preloading soft foundation by using high-pressure sand blasting pile
European Patent Office | 2024
|Staged vacuum preloading soft soil ground reinforcing technology
European Patent Office | 2015
|Method for reinforcing ultra-soft foundation through vacuum preloading
European Patent Office | 2024
|Preloading of structural piles and pile groups
British Library Conference Proceedings | 1999
|