Reinforcement device for building with improved workability and construction method thereof
The present invention relates to a reinforcement device for a building with improved workability and a construction method thereof. The method includes: a first step of allowing an outer surface of a pillar to be exposed by removing bricks constructed on the outer surface corresponding to a pillar part of the building, perforating a plurality of holes on the outer surface of the pillar in a longitudinal direction, and burying anchor bolt holders into each hole; a second step of allowing a plurality of anchor bolts to be horizontally exposed by coupling one end part of the plurality of anchor bolts to the anchor bolt holders of each hole formed on the outer surface of the pillar of the building for burying construction, and allowing the plurality of anchor bolts to be constructed along the outer surface of the pillar in the longitudinal direction; a third step of manufacturing a reinforcement structure by connecting a horizontal frame or vertical frame, and installing an outer structure on the outer surface of the pillar of the building by connecting a planar portion of the horizontal frame or vertical frame to end parts of the plurality of anchor bolts; a fourth step of connecting a middle vertical frame in a vertical direction to connect a middle part of the upper and lower horizontal frames of the outer structure; a fifth step of attaching a board to the outer surface of the vertical frame of the outer structure to block a part where the bricks are removed from the outer wall of the building in the first step, installing a mold to accommodate the plurality of anchor bolts of the second step, and depositing concrete mortar in the mold; and a sixth step of removing the mold after the concrete mortar is cured. The present invention has an effect that rigidity can be significantly enhanced.
본 발명은 시공성을 개선한 건축물의 보강장치 및 이의 시공 방법에 관한 것으로, 건물의 기둥부위에 해당되는 외면에 시공된 벽돌을 제거하여 기둥의 외면이 노출되도록 하고, 상기 기둥의 외면에 종방향으로 다수의 홀을 천공하고, 각 홀에 앙카볼트홀더를 매립하는 1단계; 상기 건물의 기둥의 외면에 형성된 각 홀의 앙카볼트홀더에 다수의 앙카볼트의 일단을 결합시켜 매립시공하여 다수의 앙카볼트가 수평하게 노출되도록 하고, 상기 다수의 앙카볼트는 기둥의 외면을 따라 종방향으로 시공되도록 하는 2단계; 수평골조 또는 수직골조를 연결하여 보강구조물을 제작하고, 상기 수평골조 또는 수직골조의 평판부에 상기 다수의 앙카볼트의 단부에 연결시켜 건물의 기둥의 외면에 외곽구조물을 설치하는 3단계; 상기 외곽구조물의 상,하부 수평골조의 중간부위를 연결하도록 수직방향으로 중간수직골조를 연결하는 4단계; 상기 외곽구조물의 수직골조의 외면에 부착되며 상기 1단계의 건물의 외벽 중 벽돌이 제거된 부분을 막도록 판재를 부착하여 상기 2단계의 다수의 앙카볼트를 수용하도록 거푸집을 설치한 후 거푸집 내에 콘크리트 몰탈을 타설하는 5단계; 상기 콘크리트 몰탈이 양생된 후 거푸집을 제거하는 6단계;를 포함한다.
Reinforcement device for building with improved workability and construction method thereof
The present invention relates to a reinforcement device for a building with improved workability and a construction method thereof. The method includes: a first step of allowing an outer surface of a pillar to be exposed by removing bricks constructed on the outer surface corresponding to a pillar part of the building, perforating a plurality of holes on the outer surface of the pillar in a longitudinal direction, and burying anchor bolt holders into each hole; a second step of allowing a plurality of anchor bolts to be horizontally exposed by coupling one end part of the plurality of anchor bolts to the anchor bolt holders of each hole formed on the outer surface of the pillar of the building for burying construction, and allowing the plurality of anchor bolts to be constructed along the outer surface of the pillar in the longitudinal direction; a third step of manufacturing a reinforcement structure by connecting a horizontal frame or vertical frame, and installing an outer structure on the outer surface of the pillar of the building by connecting a planar portion of the horizontal frame or vertical frame to end parts of the plurality of anchor bolts; a fourth step of connecting a middle vertical frame in a vertical direction to connect a middle part of the upper and lower horizontal frames of the outer structure; a fifth step of attaching a board to the outer surface of the vertical frame of the outer structure to block a part where the bricks are removed from the outer wall of the building in the first step, installing a mold to accommodate the plurality of anchor bolts of the second step, and depositing concrete mortar in the mold; and a sixth step of removing the mold after the concrete mortar is cured. The present invention has an effect that rigidity can be significantly enhanced.
본 발명은 시공성을 개선한 건축물의 보강장치 및 이의 시공 방법에 관한 것으로, 건물의 기둥부위에 해당되는 외면에 시공된 벽돌을 제거하여 기둥의 외면이 노출되도록 하고, 상기 기둥의 외면에 종방향으로 다수의 홀을 천공하고, 각 홀에 앙카볼트홀더를 매립하는 1단계; 상기 건물의 기둥의 외면에 형성된 각 홀의 앙카볼트홀더에 다수의 앙카볼트의 일단을 결합시켜 매립시공하여 다수의 앙카볼트가 수평하게 노출되도록 하고, 상기 다수의 앙카볼트는 기둥의 외면을 따라 종방향으로 시공되도록 하는 2단계; 수평골조 또는 수직골조를 연결하여 보강구조물을 제작하고, 상기 수평골조 또는 수직골조의 평판부에 상기 다수의 앙카볼트의 단부에 연결시켜 건물의 기둥의 외면에 외곽구조물을 설치하는 3단계; 상기 외곽구조물의 상,하부 수평골조의 중간부위를 연결하도록 수직방향으로 중간수직골조를 연결하는 4단계; 상기 외곽구조물의 수직골조의 외면에 부착되며 상기 1단계의 건물의 외벽 중 벽돌이 제거된 부분을 막도록 판재를 부착하여 상기 2단계의 다수의 앙카볼트를 수용하도록 거푸집을 설치한 후 거푸집 내에 콘크리트 몰탈을 타설하는 5단계; 상기 콘크리트 몰탈이 양생된 후 거푸집을 제거하는 6단계;를 포함한다.
Reinforcement device for building with improved workability and construction method thereof
시공성을 개선한 건축물의 보강장치 및 이의 시공 방법
JANG YEON WOO (author)
2022-07-08
Patent
Electronic Resource
Korean
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Firefighting equipment construction method in a building with improved workability
European Patent Office | 2024
|Seismic Reinforcement Construction Method And Structure Of Masonry Wall With Improved Workability
European Patent Office | 2023
|REINFORCEMENT PLATE OF GUARDRAIL WITH IMPROVED SUPPORT AND WORKABILITY
European Patent Office | 2022
|WORKABILITY IMPROVED SEAT AND CONSTRUCTION METHOD THEROF
European Patent Office | 2020
|Panel Fixing Structure with Improved Workability and Construction Method
European Patent Office | 2018
|