A platform for research: civil engineering, architecture and urbanism
CONNECTION STRUCTURE OF PRECAST CONCRETE PIER
The present invention relates to a connection structure of a precast concrete pier, which is installed side by side on a straight line and is interconnected in a longitudinal direction to connect a first and a second pier made of precast concrete to each other, comprising: a first connection structure including a H-beam installed on an end of the first pier and a second connection structure including a pair of ㄷ-shaped steels installed on an end of the second pier to face a web. The H-beam has one side embedded in the end of the first pier and has the other side exposed. The ㄷ-shaped steels have one side embedded in the end of the second pier and have the other side exposed only on an outer side surface. A concave coupling space is included outside an exposed flange of the pair of ㄷ-shaped steels. The exposed web of the H-beam is inserted between a pair of exposed web surfaces of the ㄷ-shaped steels. A pair of exposed flanges of the H-beam is installed to be in contact with the exposed flange surface of the pair of ㄷ-shaped steels. The purpose of the present invention is to provide a connection structure of a precast concrete pier, wherein the connection structure is improved to facilitate the connection work of piers and to enable strong connection.
본 발명은 직선상에 나란히 설치되어 길이 방향으로 서로 연결되는 것으로 프리캐스트 콘크리트로된 제1, 2말뚝 상호간을 연결하기 위한 것으로, 상기 제1말뚝의 단부에 설치된 H형강을 포함하는 제1연결구조; 상기 제2말뚝의 단부에 웨브가 마주보도록 설치된 한 쌍의 ㄷ형강을 포함하는 제2연결구조;를 포함하고, 상기 H형강은 일측은 상기 제1말뚝의 단부에 매설되고, 타측은 노출되며, 상기 ㄷ형강은 일측은 상기 제2말뚝의 단부에 매설되고, 타측은 외측면만 노출되며, 상기 한 쌍의 ㄷ형강의 노출된 플렌지 외측에는 오목한 체결공간을 포함하고, 상기 H형강의 노출된 웨브는 상기 ㄷ형강의 한 쌍의 노출 웨브면 사이에 끼워지게 삽입되고, 상기 H형강의 노출된 한 쌍의 플렌지는 상기 한 쌍의 ㄷ형강의 노출 플렌지면에 접하도록 설치되는 것을 특징으로 하는 프리캐스트 콘크리트말뚝 연결구조이다. 본 발명은 연결구조를 개선함으로써, 말뚝의 연결 작업이 용이하고 신속하며, 견고한 연결이 가능한 프리캐스트 콘크리트말뚝 연결구조를 제공함을 그 목적으로 한다.
CONNECTION STRUCTURE OF PRECAST CONCRETE PIER
The present invention relates to a connection structure of a precast concrete pier, which is installed side by side on a straight line and is interconnected in a longitudinal direction to connect a first and a second pier made of precast concrete to each other, comprising: a first connection structure including a H-beam installed on an end of the first pier and a second connection structure including a pair of ㄷ-shaped steels installed on an end of the second pier to face a web. The H-beam has one side embedded in the end of the first pier and has the other side exposed. The ㄷ-shaped steels have one side embedded in the end of the second pier and have the other side exposed only on an outer side surface. A concave coupling space is included outside an exposed flange of the pair of ㄷ-shaped steels. The exposed web of the H-beam is inserted between a pair of exposed web surfaces of the ㄷ-shaped steels. A pair of exposed flanges of the H-beam is installed to be in contact with the exposed flange surface of the pair of ㄷ-shaped steels. The purpose of the present invention is to provide a connection structure of a precast concrete pier, wherein the connection structure is improved to facilitate the connection work of piers and to enable strong connection.
본 발명은 직선상에 나란히 설치되어 길이 방향으로 서로 연결되는 것으로 프리캐스트 콘크리트로된 제1, 2말뚝 상호간을 연결하기 위한 것으로, 상기 제1말뚝의 단부에 설치된 H형강을 포함하는 제1연결구조; 상기 제2말뚝의 단부에 웨브가 마주보도록 설치된 한 쌍의 ㄷ형강을 포함하는 제2연결구조;를 포함하고, 상기 H형강은 일측은 상기 제1말뚝의 단부에 매설되고, 타측은 노출되며, 상기 ㄷ형강은 일측은 상기 제2말뚝의 단부에 매설되고, 타측은 외측면만 노출되며, 상기 한 쌍의 ㄷ형강의 노출된 플렌지 외측에는 오목한 체결공간을 포함하고, 상기 H형강의 노출된 웨브는 상기 ㄷ형강의 한 쌍의 노출 웨브면 사이에 끼워지게 삽입되고, 상기 H형강의 노출된 한 쌍의 플렌지는 상기 한 쌍의 ㄷ형강의 노출 플렌지면에 접하도록 설치되는 것을 특징으로 하는 프리캐스트 콘크리트말뚝 연결구조이다. 본 발명은 연결구조를 개선함으로써, 말뚝의 연결 작업이 용이하고 신속하며, 견고한 연결이 가능한 프리캐스트 콘크리트말뚝 연결구조를 제공함을 그 목적으로 한다.
CONNECTION STRUCTURE OF PRECAST CONCRETE PIER
프리캐스트 콘크리트말뚝 연결구조
LEE SEUNG WON (author)
2022-09-06
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
PRECAST PIER AND PRECAST PIER CONSTRUCTION METHOD USING SAME
European Patent Office | 2016
|Rapid Pier Delivery Using Precast Concrete Components
British Library Conference Proceedings | 2010
|Precast concrete cofferdam and pier construction process
European Patent Office | 2020
|