2 Trenchless construction method of underground structures using double rows steel pipe propulsion
The present invention provides a trenchless construction method of an underground structure using double-row steel pipe propulsion, wherein after a gallery pipe used as a main path for all works is propelled in two rows, the construction of an upper slab and a wall is performed individually at the same time, thereby improving constructability and shortening a construction period to save construction costs. The trenchless construction method of an underground structure using double-row steel pipe propulsion according to a first embodiment of the present invention comprises: (a) propelling and excavating a first gallery pipe on both sides above a position where a planned underground structure is to be installed; (b) propelling and excavating an upper slab pipe from the first gallery pipe on either side and installing the same between the first gallery pipes, which face each other, and at the same time, propelling and excavating a second gallery pipe outside the first gallery pipe to be in contact at the same height; (c) arranging reinforcing bars inside the upper slab pipe and excavating below the second gallery pipe while pouring concrete to form a wall trench, and installing a PC panel on the wall trench; (d) completing the excavation for the formation of the wall trench along with concrete pouring after arranging reinforcing bars in the first gallery pipe; (e) constructing an underground wall by pouring concrete after arranging reinforcing bars on the wall trench; (f) pouring concrete after arranging reinforcing bars on the second gallery pipe; (g) excavating an inner area surrounded by the first and second gallery pipes, the upper slab pipe and the underground wall to form an underground path; and (h) constructing a lower slab on the floor of the underground path.
본 발명은 모든 작업의 주통로로 사용되는 갤러리관이 2열로 추진된 후 상부슬래브와 벽체의 시공이 동시 개별적으로 이루어져 시공성 향상 및 공기 단축으로 인한 공사비의 절감 효과를 기대할 수 있는 2열 강관 추진식 비개착 지하구조물의 시공 방법을 제공한다. 본 발명의 제1 실시 형태에 따른 2열 강관 추진식 비개착 지하구조물의 시공 방법은, (a) 계획된 지하구조물이 설치될 위치에 상부 양쪽으로 제1 갤러리관의 추진 및 굴착을 진행하는 단계와; (b) 상부 슬래브관을 어느 한쪽의 제1 갤러리관에서 추진 및 굴착하여 서로 마주하는 제1 갤러리관의 사이에 설치하고, 이와 동시에 제2 갤러리관을 제1 갤러리관의 외측에 동일 높이에서 접하도록 하여 추진 및 굴착을 진행하는 단계와; (c) 상부 슬래브관의 내부에 철근을 배근한 후 콘크리트를 타설함과 함께 제2 갤러리관의 하부로 굴착하여 벽체트랜치를 형성하며, PC 패널을 벽체트랜치에 설치하는 단계와; (d) 제1 갤러리관에 철근 배근 후 콘크리트를 타설함과 함께 벽체트랜치의 형성을 위한 굴착을 완료하는 단계와; (e) 벽체트랜치에 철근 배근 후 콘크리트를 타설하여 지하벽체를 시공하는 단계와; (f) 제2 갤러리관에 철근 배근 후 콘크리트를 타설하는 단계와; (g) 제1,2 갤러리관, 상부 슬래브관 및 지하벽체로 에워싸진 내부 영역을 굴착하여 지하통로를 형성하는 단계와; (h) 지하통로의 바닥에 하부슬래브를 시공하는 단계;를 포함한 것을 특징으로 한다.
2 Trenchless construction method of underground structures using double rows steel pipe propulsion
The present invention provides a trenchless construction method of an underground structure using double-row steel pipe propulsion, wherein after a gallery pipe used as a main path for all works is propelled in two rows, the construction of an upper slab and a wall is performed individually at the same time, thereby improving constructability and shortening a construction period to save construction costs. The trenchless construction method of an underground structure using double-row steel pipe propulsion according to a first embodiment of the present invention comprises: (a) propelling and excavating a first gallery pipe on both sides above a position where a planned underground structure is to be installed; (b) propelling and excavating an upper slab pipe from the first gallery pipe on either side and installing the same between the first gallery pipes, which face each other, and at the same time, propelling and excavating a second gallery pipe outside the first gallery pipe to be in contact at the same height; (c) arranging reinforcing bars inside the upper slab pipe and excavating below the second gallery pipe while pouring concrete to form a wall trench, and installing a PC panel on the wall trench; (d) completing the excavation for the formation of the wall trench along with concrete pouring after arranging reinforcing bars in the first gallery pipe; (e) constructing an underground wall by pouring concrete after arranging reinforcing bars on the wall trench; (f) pouring concrete after arranging reinforcing bars on the second gallery pipe; (g) excavating an inner area surrounded by the first and second gallery pipes, the upper slab pipe and the underground wall to form an underground path; and (h) constructing a lower slab on the floor of the underground path.
본 발명은 모든 작업의 주통로로 사용되는 갤러리관이 2열로 추진된 후 상부슬래브와 벽체의 시공이 동시 개별적으로 이루어져 시공성 향상 및 공기 단축으로 인한 공사비의 절감 효과를 기대할 수 있는 2열 강관 추진식 비개착 지하구조물의 시공 방법을 제공한다. 본 발명의 제1 실시 형태에 따른 2열 강관 추진식 비개착 지하구조물의 시공 방법은, (a) 계획된 지하구조물이 설치될 위치에 상부 양쪽으로 제1 갤러리관의 추진 및 굴착을 진행하는 단계와; (b) 상부 슬래브관을 어느 한쪽의 제1 갤러리관에서 추진 및 굴착하여 서로 마주하는 제1 갤러리관의 사이에 설치하고, 이와 동시에 제2 갤러리관을 제1 갤러리관의 외측에 동일 높이에서 접하도록 하여 추진 및 굴착을 진행하는 단계와; (c) 상부 슬래브관의 내부에 철근을 배근한 후 콘크리트를 타설함과 함께 제2 갤러리관의 하부로 굴착하여 벽체트랜치를 형성하며, PC 패널을 벽체트랜치에 설치하는 단계와; (d) 제1 갤러리관에 철근 배근 후 콘크리트를 타설함과 함께 벽체트랜치의 형성을 위한 굴착을 완료하는 단계와; (e) 벽체트랜치에 철근 배근 후 콘크리트를 타설하여 지하벽체를 시공하는 단계와; (f) 제2 갤러리관에 철근 배근 후 콘크리트를 타설하는 단계와; (g) 제1,2 갤러리관, 상부 슬래브관 및 지하벽체로 에워싸진 내부 영역을 굴착하여 지하통로를 형성하는 단계와; (h) 지하통로의 바닥에 하부슬래브를 시공하는 단계;를 포함한 것을 특징으로 한다.
2 Trenchless construction method of underground structures using double rows steel pipe propulsion
2열 강관 추진식 비개착 지하구조물의 시공 방법
YOUN GI CHEOL (author)
2022-09-20
Patent
Electronic Resource
Korean
Trenchless construction method of underground structures
European Patent Office | 2016
|Trenchless Construction for Underground Services
NTIS | 1987
|Rehabilitation of Underground Infrastructure Utilizing Trenchless Pipe Replacement
British Library Online Contents | 2001
|Pipeline dredging method for trenchless large underground pipe network
European Patent Office | 2023
|ARTICLES - Rehabilitation of Underground Infrastructure Utilizing Trenchless Pipe Replacement
Online Contents | 2001
|