A platform for research: civil engineering, architecture and urbanism
Template structure for beforehand pile penetration and method for installation of marine substructure using it
The present invention provides a template structure for a beforehand pile penetration method and a method for installing a marine substructure using the same, capable of saving installation costs and reducing construction periods of a marine substructure in various kinds of offshore plants or a marine wind power generator. The template structure for a beforehand pile penetration method comprises: multiple base mud pads (110) including a hollow at the center, and supporting a templet structure by being mounted on the sea bottom; multiple outer pile guides (120) having a tubular shape, and vertically fixed onto the multiple base mud pads (110); multiple inner pile guides (130) located in the multiple outer pile guides (120), and guiding a steel pile (2) embedded into the sea bottom (1); multiple lower horizontal members (140) horizontally arranged and connected to a side of the outer pile guide (120) of which both ends are adjacent by a hinge; and multiple upper horizontal members (150) horizontally arranged and connected to the side of the inner pile guide (130) of which both ends are adjacent by the hinge.
본 발명은 선 파일관입공법을 위한 템플릿 구조물은, 중앙에 중공을 구비하고, 해저 지반에 안착되어 템플릿 구조물을 지지하는 복수의 베이스 머드 패드(110), 복수의 베이스 머드 패드(110) 위에 수직으로 고정되는 관 형상의 복수의 외부 파일 가이드(120), 복수의 외부 파일 가이드(120) 내에 위치하여, 해저 지반(1)에 관입되는 강관 파일(2)을 안내하는 관 형상의 복수의 내부 파일 가이드(130), 수평 배치되어 양단이 이웃하는 외부 파일 가이드(120)의 측면에 힌지 결합되는 복수의 하부 수평부재(140), 및 수평 배치되어 양단이 이웃하는 내부 파일 가이드(130)의 측면에 힌지 결합되는 복수의 상부 수평부재(150)로 구성된다.
Template structure for beforehand pile penetration and method for installation of marine substructure using it
The present invention provides a template structure for a beforehand pile penetration method and a method for installing a marine substructure using the same, capable of saving installation costs and reducing construction periods of a marine substructure in various kinds of offshore plants or a marine wind power generator. The template structure for a beforehand pile penetration method comprises: multiple base mud pads (110) including a hollow at the center, and supporting a templet structure by being mounted on the sea bottom; multiple outer pile guides (120) having a tubular shape, and vertically fixed onto the multiple base mud pads (110); multiple inner pile guides (130) located in the multiple outer pile guides (120), and guiding a steel pile (2) embedded into the sea bottom (1); multiple lower horizontal members (140) horizontally arranged and connected to a side of the outer pile guide (120) of which both ends are adjacent by a hinge; and multiple upper horizontal members (150) horizontally arranged and connected to the side of the inner pile guide (130) of which both ends are adjacent by the hinge.
본 발명은 선 파일관입공법을 위한 템플릿 구조물은, 중앙에 중공을 구비하고, 해저 지반에 안착되어 템플릿 구조물을 지지하는 복수의 베이스 머드 패드(110), 복수의 베이스 머드 패드(110) 위에 수직으로 고정되는 관 형상의 복수의 외부 파일 가이드(120), 복수의 외부 파일 가이드(120) 내에 위치하여, 해저 지반(1)에 관입되는 강관 파일(2)을 안내하는 관 형상의 복수의 내부 파일 가이드(130), 수평 배치되어 양단이 이웃하는 외부 파일 가이드(120)의 측면에 힌지 결합되는 복수의 하부 수평부재(140), 및 수평 배치되어 양단이 이웃하는 내부 파일 가이드(130)의 측면에 힌지 결합되는 복수의 상부 수평부재(150)로 구성된다.
Template structure for beforehand pile penetration and method for installation of marine substructure using it
선 파일관입공법을 위한 템플릿 구조물과 이를 이용한 해양 하부 구조물 설치방법
CHOI BYEONG RYEOL (author)
2022-10-21
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
ASSEMBLING AND DISMANTLING-BEFOREHAND STRUCTURAL TEMPLATE SYSTEM AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2016
|European Patent Office | 2023
|PILE-SUBSTRUCTURE COLUMN SYSTEM AND CONSTRUCTION METHOD OF THE PILE-SUBSTRUCTURE COLUMN SYSTEM
European Patent Office | 2023
|