Separable grouting steel pipe manufacturing method and tunnel construction method using the grouting steel pipe manufactured thereby
The present invention relates to a separable grouting steel pipe manufacturing method capable of constant-pressure injection and a tunnel construction method using a grouting steel pipe manufactured thereby. An objective of the present invention is to additionally perform tack welding on a removal portion of the rear end when manufacturing a grouting steel pipe to prevent the steel pipe removal portion from being detached early in a tunnel excavation construction process. To achieve the objective, a V-shaped groove (11) is machined along the outer circumferential surface at a position separated from the rear end of a steel pipe body (10) having a prescribed length by a prescribed distance. Tack welding is performed on the V-shaped groove (11) at regular intervals to form a reinforced welding part (30). Check valves (40) are provided at a plurality of sites in the steel pipe body (10) to discharge grout injected into the steep pipe body (10). The check valves (40) are fastened to valve grooves (12) formed on the steel pipe body (10) by a screw fastening method.
본 발명은 정압 주입이 가능한 분리형 그라우팅 강관 제작방법 및 이에 의해 제작된 그라우팅 강관을 이용한 터널 시공방법에 관한 것으로서, 그라우팅 강관의 제작시 후단부 제거 부위에 가용접을 추가로 실시함으로써 터널 굴착 시공 과정에서 강관 제거 부위가 조기 탈락되는 현상을 방지하기 위한 것이다. 이를 실현하기 위한 본 발명의 기술 특징은, 일정 길이를 이루는 강관 본체(10)의 후단부로부터 일정 거리 이격된 위치의 외주면 둘레를 따라 V홈(11)을 가공하되, 상기 V홈(11)에는 일정 간격으로 가용접(Tack welding)을 실시하여 보강 용접부(30)를 형성시키며; 상기 강관 본체(10)에는 내부에 주입된 그라우트제의 배출이 가능하도록 체크밸브(40)가 다수의 개소에 구성되되, 상기 체크밸브(40)는 강관 본체(10)에 형성된 밸브홈(12)에 나사체결 방식에 의해 체결이 이루어지는 것을 특징으로 한다.
Separable grouting steel pipe manufacturing method and tunnel construction method using the grouting steel pipe manufactured thereby
The present invention relates to a separable grouting steel pipe manufacturing method capable of constant-pressure injection and a tunnel construction method using a grouting steel pipe manufactured thereby. An objective of the present invention is to additionally perform tack welding on a removal portion of the rear end when manufacturing a grouting steel pipe to prevent the steel pipe removal portion from being detached early in a tunnel excavation construction process. To achieve the objective, a V-shaped groove (11) is machined along the outer circumferential surface at a position separated from the rear end of a steel pipe body (10) having a prescribed length by a prescribed distance. Tack welding is performed on the V-shaped groove (11) at regular intervals to form a reinforced welding part (30). Check valves (40) are provided at a plurality of sites in the steel pipe body (10) to discharge grout injected into the steep pipe body (10). The check valves (40) are fastened to valve grooves (12) formed on the steel pipe body (10) by a screw fastening method.
본 발명은 정압 주입이 가능한 분리형 그라우팅 강관 제작방법 및 이에 의해 제작된 그라우팅 강관을 이용한 터널 시공방법에 관한 것으로서, 그라우팅 강관의 제작시 후단부 제거 부위에 가용접을 추가로 실시함으로써 터널 굴착 시공 과정에서 강관 제거 부위가 조기 탈락되는 현상을 방지하기 위한 것이다. 이를 실현하기 위한 본 발명의 기술 특징은, 일정 길이를 이루는 강관 본체(10)의 후단부로부터 일정 거리 이격된 위치의 외주면 둘레를 따라 V홈(11)을 가공하되, 상기 V홈(11)에는 일정 간격으로 가용접(Tack welding)을 실시하여 보강 용접부(30)를 형성시키며; 상기 강관 본체(10)에는 내부에 주입된 그라우트제의 배출이 가능하도록 체크밸브(40)가 다수의 개소에 구성되되, 상기 체크밸브(40)는 강관 본체(10)에 형성된 밸브홈(12)에 나사체결 방식에 의해 체결이 이루어지는 것을 특징으로 한다.
Separable grouting steel pipe manufacturing method and tunnel construction method using the grouting steel pipe manufactured thereby
정압 주입이 가능한 분리형 그라우팅 강관 제작방법 및 이에 의해 제작된 그라우팅 강관을 이용한 터널 시공방법
SONG HAN SEOB (author)
2023-04-12
Patent
Electronic Resource
Korean
MULTISTEP STEEL PIPE TUNNEL GROUTING REINFORCEMENT METHOD
European Patent Office | 2023
|Steel pipe simultaneous injection grouting method for tunnel construction
European Patent Office | 2023
|Construction method of front grouting micro grouting steel pipe pile
European Patent Office | 2023
|