According to the present invention, provided is a construction method of a bridge pile with improved lateral bearing force, comprising: a first step of calculating the design diameter of a pile that can resist vertical force according to ground conditions; a second step of calculating the length of a head corresponding to the ground surface or partial length of the pile based on the design diameter of the pile; a third step of constructing the part corresponding to the head of the pile in a size increased by 1.1 to 1.5 times the design diameter of the pile, and constructing the part corresponding to the middle or anchorage portion from below the head of the pile in the size of the design diameter of the pile; and a fourth step of constructing a tension system on the head of the pile and completing the construction of the pile.
본 발명에 의하면, 지반조건에 따라 연직력에 저항할 수 있는 말뚝의 설계직경이 계산되는 제1단계와; 말뚝의 설계직경을 토대로 말뚝의 지표 또는 부분 길이에 해당되는 두부의 길이가 계산되는 제2단계와; 말뚝의 두부에 해당되는 부분이 말뚝의 설계직경에 대하여 1.1배 내지 1.5배 증가된 크기로 시공되고 말뚝의 두부 아래로부터 중간부 내지 정착부에 해당되는 부분이 말뚝의 설계직경 크기로 시공되는 제3단계와; 말뚝의 두부에 긴장시스템이 시공되고 말뚝의 시공이 완료되는 제4단계를 포함하는 횡방향 지지력이 증가된 교량용 말뚝 시공방법이 제공된다.
According to the present invention, provided is a construction method of a bridge pile with improved lateral bearing force, comprising: a first step of calculating the design diameter of a pile that can resist vertical force according to ground conditions; a second step of calculating the length of a head corresponding to the ground surface or partial length of the pile based on the design diameter of the pile; a third step of constructing the part corresponding to the head of the pile in a size increased by 1.1 to 1.5 times the design diameter of the pile, and constructing the part corresponding to the middle or anchorage portion from below the head of the pile in the size of the design diameter of the pile; and a fourth step of constructing a tension system on the head of the pile and completing the construction of the pile.
본 발명에 의하면, 지반조건에 따라 연직력에 저항할 수 있는 말뚝의 설계직경이 계산되는 제1단계와; 말뚝의 설계직경을 토대로 말뚝의 지표 또는 부분 길이에 해당되는 두부의 길이가 계산되는 제2단계와; 말뚝의 두부에 해당되는 부분이 말뚝의 설계직경에 대하여 1.1배 내지 1.5배 증가된 크기로 시공되고 말뚝의 두부 아래로부터 중간부 내지 정착부에 해당되는 부분이 말뚝의 설계직경 크기로 시공되는 제3단계와; 말뚝의 두부에 긴장시스템이 시공되고 말뚝의 시공이 완료되는 제4단계를 포함하는 횡방향 지지력이 증가된 교량용 말뚝 시공방법이 제공된다.
Pile and pile construction method
횡방향 지지력이 증가된 교량용 말뚝 및 그 시공방법
HAM JEONG A (author)
2023-06-20
Patent
Electronic Resource
Korean
PILE CONSTRUCTION DEVICE, PILE CONSTRUCTION METHOD AND PILE