Temporary Bridge
The present invention relates to a temporary bridge with easy installation and dismantlement and, more specifically, to a temporary bridge with an improved structure, capable of minimizing welding connection for onsite assembly and maximizing bolt connection, thereby shortening a construction period for the installation and dismantlement of a temporary bridge while increasing reusability of members, and easily accepting a construction error of a temporary vent pile. In accordance with the present invention, the temporary bridge includes a floor frame comprising a temporary vent including a pile embedded into the ground and a main girder and a cross beam installed in an upper part of the temporary vent and a deck plate installed in an upper part of the floor frame, wherein the temporary bridge includes: a coping beam installed between an upper part of the pile and a lower part of the floor frame to distribute a load transmitted through the main girder in a transverse direction of the bridge; a first welding plate welded to an upper part of an upper end member of the pile and having bolt holes formed at both longitudinal ends of the coping beam; a plurality of bolt holes formed at regular intervals in a longitudinal direction of the coping beam, in a part of the coping beam, which is adjacent to the first welding plate; and a bolt and a nut coupled to the bolt holes formed on the first welding plate and the coping beam, respectively. Therefore, since a coupling position of the bolt and the nut or a welding position of the upper end member of the pile with the first welding plate is changed on the site, the floor frame can be rapidly constructed in accordance with the design frame regardless of a construction error in a longitudinal or transverse direction of the bridge of the pile.
본 발명은 설치 및 해체가 용이한 가설교량에 관한 것으로서, 더욱 상세하게는 구성부재의 현장 조립에 용접이음을 최소화하고 볼트이음을 최대화하여 가설교량의 설치 및 해체 작업공기를 단축시키면서 부재의 재활용성도 높이고, 가설벤트 파일의 시공오차도 용이하게 수용할 수 있도록 구조가 개선된 가설교량에 관한 것이다. 본 발명은 지반에 근입되는 파일을 포함하는 가설벤트와 상기 가설벤트의 상부에 설치되는 주거더와 가로보로 구성되는 바닥틀 및 상기 바닥틀의 상부에 설치되는 복공판을 포함하는 가설교량에 있어서, 상기 파일의 상부와 상기 바닥틀의 하부 사이에 설치되어 상기 주거더를 통해 전달되는 하중을 교량의 횡방향으로 분배하는 코핑빔; 상기 파일상단부재의 상부에 용접되며 상기 코핑빔의 길이방향 양단부에 볼트공이 형성된 제1용접 플레이트; 상기 코핑빔 중 상기 제1용접 플레이트와 접하는 부분에 상기 코핑빔의 길이방향을 따라 일정 간격으로 여러 개 형성되는 볼트공; 및, 상기 제1용접 플레이트와 상기 코핑빔에 각각 형성된 볼트공에 체결되는 볼트와 너트;를 포함하여, 현장에서 상기 볼트와 너트의 체결위치나 상기 파일상단부재와 제1용접 플레이트의 용접 위치를 변경함으로써 상기 파일의 교량 종방향 또는 횡방향의 시공오차와 관계 없이 상기 바닥틀이 설계대로 급속시공될 수 있는 가설교량을 제공한다.
Temporary Bridge
The present invention relates to a temporary bridge with easy installation and dismantlement and, more specifically, to a temporary bridge with an improved structure, capable of minimizing welding connection for onsite assembly and maximizing bolt connection, thereby shortening a construction period for the installation and dismantlement of a temporary bridge while increasing reusability of members, and easily accepting a construction error of a temporary vent pile. In accordance with the present invention, the temporary bridge includes a floor frame comprising a temporary vent including a pile embedded into the ground and a main girder and a cross beam installed in an upper part of the temporary vent and a deck plate installed in an upper part of the floor frame, wherein the temporary bridge includes: a coping beam installed between an upper part of the pile and a lower part of the floor frame to distribute a load transmitted through the main girder in a transverse direction of the bridge; a first welding plate welded to an upper part of an upper end member of the pile and having bolt holes formed at both longitudinal ends of the coping beam; a plurality of bolt holes formed at regular intervals in a longitudinal direction of the coping beam, in a part of the coping beam, which is adjacent to the first welding plate; and a bolt and a nut coupled to the bolt holes formed on the first welding plate and the coping beam, respectively. Therefore, since a coupling position of the bolt and the nut or a welding position of the upper end member of the pile with the first welding plate is changed on the site, the floor frame can be rapidly constructed in accordance with the design frame regardless of a construction error in a longitudinal or transverse direction of the bridge of the pile.
본 발명은 설치 및 해체가 용이한 가설교량에 관한 것으로서, 더욱 상세하게는 구성부재의 현장 조립에 용접이음을 최소화하고 볼트이음을 최대화하여 가설교량의 설치 및 해체 작업공기를 단축시키면서 부재의 재활용성도 높이고, 가설벤트 파일의 시공오차도 용이하게 수용할 수 있도록 구조가 개선된 가설교량에 관한 것이다. 본 발명은 지반에 근입되는 파일을 포함하는 가설벤트와 상기 가설벤트의 상부에 설치되는 주거더와 가로보로 구성되는 바닥틀 및 상기 바닥틀의 상부에 설치되는 복공판을 포함하는 가설교량에 있어서, 상기 파일의 상부와 상기 바닥틀의 하부 사이에 설치되어 상기 주거더를 통해 전달되는 하중을 교량의 횡방향으로 분배하는 코핑빔; 상기 파일상단부재의 상부에 용접되며 상기 코핑빔의 길이방향 양단부에 볼트공이 형성된 제1용접 플레이트; 상기 코핑빔 중 상기 제1용접 플레이트와 접하는 부분에 상기 코핑빔의 길이방향을 따라 일정 간격으로 여러 개 형성되는 볼트공; 및, 상기 제1용접 플레이트와 상기 코핑빔에 각각 형성된 볼트공에 체결되는 볼트와 너트;를 포함하여, 현장에서 상기 볼트와 너트의 체결위치나 상기 파일상단부재와 제1용접 플레이트의 용접 위치를 변경함으로써 상기 파일의 교량 종방향 또는 횡방향의 시공오차와 관계 없이 상기 바닥틀이 설계대로 급속시공될 수 있는 가설교량을 제공한다.
Temporary Bridge
가설교량
KIM YEON JONG (author) / AHN JEONG SAENG (author)
2023-07-19
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
TEMPORARY BRIDGE AND CONSTRUCTION METHOD OF TEMPORARY BRIDGE
European Patent Office | 2023
|