A platform for research: civil engineering, architecture and urbanism
GROUND IMPROVEMENT PARALLEL CONCRETE BOX CONSTRUCTION METHOD FOR TUNNEL CONSTRUCTING
The present invention relates to a method for constructing a tunnel by excavating the ground in the direction of the tunnel and pushing or pulling pre-fabricated enclosures. The method comprises the steps of: a) installing lining plates on a road surface on a tunnel section to be constructed; b) forming through holes in the lining plates, and inserting grout injection pipes into the through holes to grout lower soil; c) performing underground excavation in the direction of the tunnel up to a portion in which the grouting is performed, and making the enclosures enter the excavated portion; and d) completing the entry of the enclosures into the entire work section by repeating the grouting in step b) and the excavation and the entry of the enclosures in step c); and removing the lining plates installed in step a). Therefore, the method enables the smooth progress of tunnel construction.
본 발명은 지중을 터널방향으로 굴토하면서 미리 제작된 함체를 추진 내지 견인하는 방식으로 터널을 시공하는 방법에 관한 것으로서, a) 구축될 터널구간 상부의 도로 노면에 복공판을 설치하는 단계; b) 상기 복공판에 관통구멍을 형성시키고, 상기 관통구멍으로 그라우트 주입관을 삽입시켜 하부 토사를 그라우팅 시키는 단계; c) 상기의 그라우팅이 이루어진 부분까지 터널의 진행방향으로 지중 굴착을 실시하고, 굴착이 이루어진 부분에 함체의 진입을 실시하는 단계; d) 상기 b)단계의 그라우팅 작업과 c)단계의 굴착 및 함체의 진입 작업을 반복하여 작업구간 전체에 대한 함체의 진입을 완료시킨 후, a)단계에서 설치하였던 복공판을 제거하는 단계;가 포함되어 구성되는 것을 특징으로 한다.
GROUND IMPROVEMENT PARALLEL CONCRETE BOX CONSTRUCTION METHOD FOR TUNNEL CONSTRUCTING
The present invention relates to a method for constructing a tunnel by excavating the ground in the direction of the tunnel and pushing or pulling pre-fabricated enclosures. The method comprises the steps of: a) installing lining plates on a road surface on a tunnel section to be constructed; b) forming through holes in the lining plates, and inserting grout injection pipes into the through holes to grout lower soil; c) performing underground excavation in the direction of the tunnel up to a portion in which the grouting is performed, and making the enclosures enter the excavated portion; and d) completing the entry of the enclosures into the entire work section by repeating the grouting in step b) and the excavation and the entry of the enclosures in step c); and removing the lining plates installed in step a). Therefore, the method enables the smooth progress of tunnel construction.
본 발명은 지중을 터널방향으로 굴토하면서 미리 제작된 함체를 추진 내지 견인하는 방식으로 터널을 시공하는 방법에 관한 것으로서, a) 구축될 터널구간 상부의 도로 노면에 복공판을 설치하는 단계; b) 상기 복공판에 관통구멍을 형성시키고, 상기 관통구멍으로 그라우트 주입관을 삽입시켜 하부 토사를 그라우팅 시키는 단계; c) 상기의 그라우팅이 이루어진 부분까지 터널의 진행방향으로 지중 굴착을 실시하고, 굴착이 이루어진 부분에 함체의 진입을 실시하는 단계; d) 상기 b)단계의 그라우팅 작업과 c)단계의 굴착 및 함체의 진입 작업을 반복하여 작업구간 전체에 대한 함체의 진입을 완료시킨 후, a)단계에서 설치하였던 복공판을 제거하는 단계;가 포함되어 구성되는 것을 특징으로 한다.
GROUND IMPROVEMENT PARALLEL CONCRETE BOX CONSTRUCTION METHOD FOR TUNNEL CONSTRUCTING
터널 구축을 위한 지반개량 병행 함체 공법
KIM DONG SE (author) / KIM KYU DONG (author)
2023-08-31
Patent
Electronic Resource
Korean
METHOD FOR CONSTRUCTING CONCRETE STRUCTURE AND METHOD FOR CONSTRUCTING TUNNEL
European Patent Office | 2024
|GROUND IMPROVEMENT METHOD BY CONSTRUCTING COMPACTION PILE
European Patent Office | 2017
|Constructing soft-ground tunnel under Boston Harbor
Engineering Index Backfile | 1961
|Constructing a railway tunnel in clayey ground
Engineering Index Backfile | 1929