A platform for research: civil engineering, architecture and urbanism
INSULATION BARRIER WINDOW PROJECT WINDOW INSTALLATION METHOD
The present invention relates to an insulation water barrier window project window installation method, and more specifically, to an insulation water barrier window project window installation method, wherein a project frame is installed such that a glass panel may be opened and closed. To this end, the present invention is characterized by comprising: a first assembly step of installing a window insulation unit at the front side of a window frame, and installing a panel insulation unit and a project frame at the window frame; a moving step of moving a window frame at which the window insulation unit, the panel insulation unit and the project frame are installed, to a construction side; a construction step of installing a window frame at which the window insulation unit, the panel insulation unit and the project frame are installed; a second construction step of installing a separating type cover at the front side of the panel insulation unit; and a finishing step of installing a glass panel and finishing the same with silicone. Therefore, according to the present invention, construction can be finished by the construction step and the finishing step after being moved to the site. The window frame is installed at the construction step, and the same is finished with silicone in the finishing step, thereby reducing the time required for on-site construction.
본 발명은 단열물막이 창호 프로젝트창 설치 방법에 관한 것이다.더욱 상세하게는, 프로젝트프레임이 설치되어 유리패널의 여닫이가 가능하도록 구성되는 단열물막이 창호 프로젝트창 설치 방법에 있어서, 창호프레임의 전방에 창호단열부를 설치하고, 상기 창호프레임에 패널단열부 및 프로젝트프레임을 설치하는 제1조립단계; 상기 창호단열부, 패널단열부 및 프로젝트프레임이 설치된 창호프레임을 시공 현장으로 이동시키는 이동단계; 상기 창호단열부, 패널단열부 및 프로젝트프레임이 설치된 창호프레임을 설치하는 시공단계; 상기 패널단열부의 전방에 분리형커버를 설치하는 제2시공단계; 및 유리패널을 설치하고 실리콘으로 마감하는 마감단계가 포함되는 것을 특징으로 한다. 본 발명에 의하면, 현장으로 이동 후 시공단계 및 마감단계로 시공이 마무리되도록 구성되되, 시공단계에서 창호프레임을 설치하고 마감단계에서 실리콘으로 마감하도록 구성됨으로써, 현장에서 시공에 소요되는 시간을 절감할 수 있는 효과가 있다.
INSULATION BARRIER WINDOW PROJECT WINDOW INSTALLATION METHOD
The present invention relates to an insulation water barrier window project window installation method, and more specifically, to an insulation water barrier window project window installation method, wherein a project frame is installed such that a glass panel may be opened and closed. To this end, the present invention is characterized by comprising: a first assembly step of installing a window insulation unit at the front side of a window frame, and installing a panel insulation unit and a project frame at the window frame; a moving step of moving a window frame at which the window insulation unit, the panel insulation unit and the project frame are installed, to a construction side; a construction step of installing a window frame at which the window insulation unit, the panel insulation unit and the project frame are installed; a second construction step of installing a separating type cover at the front side of the panel insulation unit; and a finishing step of installing a glass panel and finishing the same with silicone. Therefore, according to the present invention, construction can be finished by the construction step and the finishing step after being moved to the site. The window frame is installed at the construction step, and the same is finished with silicone in the finishing step, thereby reducing the time required for on-site construction.
본 발명은 단열물막이 창호 프로젝트창 설치 방법에 관한 것이다.더욱 상세하게는, 프로젝트프레임이 설치되어 유리패널의 여닫이가 가능하도록 구성되는 단열물막이 창호 프로젝트창 설치 방법에 있어서, 창호프레임의 전방에 창호단열부를 설치하고, 상기 창호프레임에 패널단열부 및 프로젝트프레임을 설치하는 제1조립단계; 상기 창호단열부, 패널단열부 및 프로젝트프레임이 설치된 창호프레임을 시공 현장으로 이동시키는 이동단계; 상기 창호단열부, 패널단열부 및 프로젝트프레임이 설치된 창호프레임을 설치하는 시공단계; 상기 패널단열부의 전방에 분리형커버를 설치하는 제2시공단계; 및 유리패널을 설치하고 실리콘으로 마감하는 마감단계가 포함되는 것을 특징으로 한다. 본 발명에 의하면, 현장으로 이동 후 시공단계 및 마감단계로 시공이 마무리되도록 구성되되, 시공단계에서 창호프레임을 설치하고 마감단계에서 실리콘으로 마감하도록 구성됨으로써, 현장에서 시공에 소요되는 시간을 절감할 수 있는 효과가 있다.
INSULATION BARRIER WINDOW PROJECT WINDOW INSTALLATION METHOD
단열물막이 창호 프로젝트창 설치 방법
KIM BYUNG CHUL (author) / PARK BYEONG GYU (author)
2023-10-11
Patent
Electronic Resource
Korean
IPC:
E06B
Feste oder bewegliche Abschlüsse für Öffnungen in Bauwerken, Fahrzeugen, Zäunen oder ähnlichen Einfriedungen allgemein, z.B. Türen, Fenster, Läden, Tore
,
FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES, OR LIKE ENCLOSURES, IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
European Patent Office | 2020
|