A platform for research: civil engineering, architecture and urbanism
I I CONSTRUCTION METHOD OF PRESTRESSED I-GIRDER BRIDGE USING GIRDER ISTRALLATION PROCESS AND I-GIRDER BRIDGE CONSTRUCTED THEREBY
The present invention relates to a construction method of an I-beam girder bridge to which prestress is introduced, which comprises the steps of: a) installing a first support and a second support on the upper surface of each lower substructure on which both ends of an I-beam girder will be positioned; b) installing the I-beam girder on the first and second supports, wherein one end of the I-beam girder is pin-connected to the second support to pivot vertically, and the other end of the I-beam girder is mounted on the first support to allow only sliding in the back-and-forth direction and vertical rotation; c) lifting an inner portion of the I-beam girder installed on the first and second supports with lifting equipment, and sliding the end of the I-beam girder mounted on the first support towards the second support; d) fixing the end of the I-beam girder moved by step c) to the first support to introduce prestress into the I-beam girder. Thus, the method does not require additional space for the introduction of prestress.
본 발명의 프리스트레스가 도입된 I형강거더 교량의 시공방법에 관한 것으로서, a) I형강거더의 양 단부가 위치할 각 하부구조체의 상면에 제1지지체와 제2지지체를 설치하는 단계; b) 제1지지체와 제2지지체에 I형강거더를 설치하되, 상기 I형강거더의 일단부는 제2지지체에 상하로 회동 가능하도록 핀결합시키고, 상기 I형강거더의 타단부는 전후방으로의 슬라이딩과 상하로의 회동만이 가능하도록 제1지지체에 거치시키는 단계; c) 제1,2지지체에 설치된 상기 I형강거더의 내측부분을 양중장비로 들어 올려 제1지지체에 거치된 I형강거더의 단부를 제2지지체방향으로 슬라이딩 이동시키는 단계; d) 상기 c)단계에 의해 이동된 I형강거더의 단부를 제1지지체에 고정시켜 상기 I형강거더에 프리스트레스를 도입시키는 단계;가 순차 진행되는 것을 특징으로 한다.
I I CONSTRUCTION METHOD OF PRESTRESSED I-GIRDER BRIDGE USING GIRDER ISTRALLATION PROCESS AND I-GIRDER BRIDGE CONSTRUCTED THEREBY
The present invention relates to a construction method of an I-beam girder bridge to which prestress is introduced, which comprises the steps of: a) installing a first support and a second support on the upper surface of each lower substructure on which both ends of an I-beam girder will be positioned; b) installing the I-beam girder on the first and second supports, wherein one end of the I-beam girder is pin-connected to the second support to pivot vertically, and the other end of the I-beam girder is mounted on the first support to allow only sliding in the back-and-forth direction and vertical rotation; c) lifting an inner portion of the I-beam girder installed on the first and second supports with lifting equipment, and sliding the end of the I-beam girder mounted on the first support towards the second support; d) fixing the end of the I-beam girder moved by step c) to the first support to introduce prestress into the I-beam girder. Thus, the method does not require additional space for the introduction of prestress.
본 발명의 프리스트레스가 도입된 I형강거더 교량의 시공방법에 관한 것으로서, a) I형강거더의 양 단부가 위치할 각 하부구조체의 상면에 제1지지체와 제2지지체를 설치하는 단계; b) 제1지지체와 제2지지체에 I형강거더를 설치하되, 상기 I형강거더의 일단부는 제2지지체에 상하로 회동 가능하도록 핀결합시키고, 상기 I형강거더의 타단부는 전후방으로의 슬라이딩과 상하로의 회동만이 가능하도록 제1지지체에 거치시키는 단계; c) 제1,2지지체에 설치된 상기 I형강거더의 내측부분을 양중장비로 들어 올려 제1지지체에 거치된 I형강거더의 단부를 제2지지체방향으로 슬라이딩 이동시키는 단계; d) 상기 c)단계에 의해 이동된 I형강거더의 단부를 제1지지체에 고정시켜 상기 I형강거더에 프리스트레스를 도입시키는 단계;가 순차 진행되는 것을 특징으로 한다.
I I CONSTRUCTION METHOD OF PRESTRESSED I-GIRDER BRIDGE USING GIRDER ISTRALLATION PROCESS AND I-GIRDER BRIDGE CONSTRUCTED THEREBY
가설공법을 이용한 프리스트레스트 I형강거더 교량의 시공방법 및 이에 의해 시공되는 I형강거더 교량
LEE JONG SEUNG (author)
2023-11-02
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
CONSTRUCTION METHOD OF PRESTRESSED COMPOSITE GIRDER BRIDGE
European Patent Office | 2015
European Patent Office | 2015
|