CONSTRUCTION METHOD FOR GEOTHERMAL EXCHANGER
The present invention provides a method of constructing an underground heat exchanger. One aspect of the construction method of an underground heat exchanger according to an embodiment of the present invention comprises: a heat exchanger burial step in which an underground heat exchanger is buried inside a bore hole excavated to a set depth from the ground; a first liquid injection step in which a first liquid is injected into the underground heat exchanger; a soil reclamation step in which soil is buried inside the bore hole where the underground heat exchanger is buried; a removal step in which the first liquid is removed to the outside of the underground heat exchanger so that a water level thereof is located at a height below a preset base level; a second liquid injection step in which a second liquid, which is a phase change material that solidifies at the temperature of the ground where the bore hole is formed with a specific gravity less than the first liquid, is injected into the interior of the underground heat exchanger so that a water level thereof is located at a height below the base surface; a digging step in which a part of the ground including the bore hole is dug out to a depth set below the depth of the bore hole to form a foundation surface, and at the same time, a part of the underground heat exchanger located at a height below the foundation surface is removed. Thus, the present invention can provide the construction method for an underground heat exchanger that can prevent the inflow of foreign substances into the interior of the underground heat exchanger with a simpler configuration.
본 발명은 지중 열교환기의 시공 방법을 제공한다. 본 발명의 실시예에 의한 지중 열교환기의 시공 방법의 일 양태는, 지중 열교환기가, 지면으로부터 설정된 깊이만큼 굴착된 보어 홀의 내부에 매설되는 열교환기 매설 단계; 제1액체가, 상기 지중 열교환기의 내부에 주입되는 제1액체 주입 단계; 토사가, 상기 지중 열교환기가 매설된 상기 보어 홀의 내부에 매립되는 토사 매립 단계; 상기 제1액체가, 그 수위가 기설정된 기초면 미만의 높이에 위치되도록 상기 지중 열교환기의 외부로 제거되는 단계; 상기 제1액체 미만의 비중으로 상기 보어 홀이 형성되는 지중의 온도에서 고화되는 상변화물질인 제2액체가, 그 수위가 상기 기초면 미만의 높이에 위치되도록 상기 지중 열교환기의 내부로 주입되는 제2액체 주입 단계; 및 상기 보어 홀을 포함하는 상기 지면의 일부가, 상기 보어 홀의 깊이 미만으로 설정된 깊이만큼 파내어져서 기초면이 형성됨과 동시에 상기 기초면 미만의 높이에 위치되는 상기 지중 열교환기의 일부가 제거되는 터파기 단계; 를 포함한다.
CONSTRUCTION METHOD FOR GEOTHERMAL EXCHANGER
The present invention provides a method of constructing an underground heat exchanger. One aspect of the construction method of an underground heat exchanger according to an embodiment of the present invention comprises: a heat exchanger burial step in which an underground heat exchanger is buried inside a bore hole excavated to a set depth from the ground; a first liquid injection step in which a first liquid is injected into the underground heat exchanger; a soil reclamation step in which soil is buried inside the bore hole where the underground heat exchanger is buried; a removal step in which the first liquid is removed to the outside of the underground heat exchanger so that a water level thereof is located at a height below a preset base level; a second liquid injection step in which a second liquid, which is a phase change material that solidifies at the temperature of the ground where the bore hole is formed with a specific gravity less than the first liquid, is injected into the interior of the underground heat exchanger so that a water level thereof is located at a height below the base surface; a digging step in which a part of the ground including the bore hole is dug out to a depth set below the depth of the bore hole to form a foundation surface, and at the same time, a part of the underground heat exchanger located at a height below the foundation surface is removed. Thus, the present invention can provide the construction method for an underground heat exchanger that can prevent the inflow of foreign substances into the interior of the underground heat exchanger with a simpler configuration.
본 발명은 지중 열교환기의 시공 방법을 제공한다. 본 발명의 실시예에 의한 지중 열교환기의 시공 방법의 일 양태는, 지중 열교환기가, 지면으로부터 설정된 깊이만큼 굴착된 보어 홀의 내부에 매설되는 열교환기 매설 단계; 제1액체가, 상기 지중 열교환기의 내부에 주입되는 제1액체 주입 단계; 토사가, 상기 지중 열교환기가 매설된 상기 보어 홀의 내부에 매립되는 토사 매립 단계; 상기 제1액체가, 그 수위가 기설정된 기초면 미만의 높이에 위치되도록 상기 지중 열교환기의 외부로 제거되는 단계; 상기 제1액체 미만의 비중으로 상기 보어 홀이 형성되는 지중의 온도에서 고화되는 상변화물질인 제2액체가, 그 수위가 상기 기초면 미만의 높이에 위치되도록 상기 지중 열교환기의 내부로 주입되는 제2액체 주입 단계; 및 상기 보어 홀을 포함하는 상기 지면의 일부가, 상기 보어 홀의 깊이 미만으로 설정된 깊이만큼 파내어져서 기초면이 형성됨과 동시에 상기 기초면 미만의 높이에 위치되는 상기 지중 열교환기의 일부가 제거되는 터파기 단계; 를 포함한다.
CONSTRUCTION METHOD FOR GEOTHERMAL EXCHANGER
지중 열교환기의 시공 방법
LEE BUMGEUN (author)
2023-11-13
Patent
Electronic Resource
Korean
European Patent Office | 2015
|CONSTRUCTION METHOD OF GROUT TUBE OF GEOTHERMAL EXCHANGER
European Patent Office | 2020
|Geothermal heat exchanger construction method using carbon powder
European Patent Office | 2019
|European Patent Office | 2020
|Construction Method Of Heat Exchanger Pipe For Geothermal Cooling And Heating
European Patent Office | 2023
|