PC Concrete smart marine lighthouse with PC modularity and its construction method
Provided in the present invention are a concrete smart marine lighthouse with PC modularity and a construction method thereof, which may maintain a stable posture even at a horizontal load when an earthquake occurs. The present invention provides a light weight compared to a volume, such that a light pole may be easily installed. Various facilities installed at a lighthouse may be prevented from being stolen. The inspector may easily approach the lighthouse. One adequate embodiment of the present invention comprises: a plurality of helical monopiles which are arranged in a grid shape at a predetermined area by being inserted into a bedrock layer; a pair of one-stage foundation concretes which are made of precast concrete, and are horizontally mounted on each upper end of helical monopiles which are arranged in a grid shape to select the helical monopiles by plural to connect the same; a two-stage foundation concrete which is stacked by being mounted on the upper surface of the one-stage foundation concretes; a light pole which is mounted on the upper surface of the two-stage foundation concrete to be fixed by an anchor bolt which is fixedly installed at the one-stage foundation concretes to be upwardly erected, and in which a light pole ladder is installed; a lighthouse which has a beacon mount, a battery storage box, and a solar cell mount to be installed at the uppermost end of the light pole; and an antitheft door which is provided between one-stage foundation concretes and the two-stage foundation concrete to open and close a lighthouse inspection hole in a sliding manner.
본 발명은 지진 도래시 수평 하중에도 안정된 자세 유지가 가능하고, 체적 대비 경량으로 등주의 설치가 용이하며, 등탑에 설치된 각종 설비의 도난 방지가 가능하고, 점검자가 쉽게 등탑으로 접근할 수 있도록 한 PC 모듈화를 적용한 콘크리트 스마트 해상용 등대 및 이의 시공 방법을 제공한다. 본 발명의 적절한 실시 형태에 따르면, 암반층에 관입시켜 일정 영역에 격자 배열되어 있는 다수개의 헬리컬 모노파일과; 프리캐스트 콘크리트로 제작되며, 격자 배열된 헬리컬 모노파일 각 상단에 수평적으로 거치되어 복수개씩 헬리컬 모노파일을 선택하여 연결시키는 한 쌍의 1단 기반콘크리트와; 상기 1단 기반콘크리트의 상면에 안착시켜 적층된 2단 기반콘크리트와; 상기 2단 기반콘크리트의 상면에 안착된 후 1단 기반콘크리트에 고정 설치된 앵커볼트에 의해 고정되어 상향으로 입설되며 내부에 등주 사다리가 설치되어 있는 등주와; 등명기 거치대, 배터리 보관함, 태양전지 거치대를 갖고 상기 등주의 최상단에 설치된 등탑과; 1단 기반콘크리트와와 2단 기반콘크리트의 사이에는 슬라이딩식으로 등대점검홀을 개폐하는 도난방지용 도어가 설치되어 있는 것을 특징으로 한다.
PC Concrete smart marine lighthouse with PC modularity and its construction method
Provided in the present invention are a concrete smart marine lighthouse with PC modularity and a construction method thereof, which may maintain a stable posture even at a horizontal load when an earthquake occurs. The present invention provides a light weight compared to a volume, such that a light pole may be easily installed. Various facilities installed at a lighthouse may be prevented from being stolen. The inspector may easily approach the lighthouse. One adequate embodiment of the present invention comprises: a plurality of helical monopiles which are arranged in a grid shape at a predetermined area by being inserted into a bedrock layer; a pair of one-stage foundation concretes which are made of precast concrete, and are horizontally mounted on each upper end of helical monopiles which are arranged in a grid shape to select the helical monopiles by plural to connect the same; a two-stage foundation concrete which is stacked by being mounted on the upper surface of the one-stage foundation concretes; a light pole which is mounted on the upper surface of the two-stage foundation concrete to be fixed by an anchor bolt which is fixedly installed at the one-stage foundation concretes to be upwardly erected, and in which a light pole ladder is installed; a lighthouse which has a beacon mount, a battery storage box, and a solar cell mount to be installed at the uppermost end of the light pole; and an antitheft door which is provided between one-stage foundation concretes and the two-stage foundation concrete to open and close a lighthouse inspection hole in a sliding manner.
본 발명은 지진 도래시 수평 하중에도 안정된 자세 유지가 가능하고, 체적 대비 경량으로 등주의 설치가 용이하며, 등탑에 설치된 각종 설비의 도난 방지가 가능하고, 점검자가 쉽게 등탑으로 접근할 수 있도록 한 PC 모듈화를 적용한 콘크리트 스마트 해상용 등대 및 이의 시공 방법을 제공한다. 본 발명의 적절한 실시 형태에 따르면, 암반층에 관입시켜 일정 영역에 격자 배열되어 있는 다수개의 헬리컬 모노파일과; 프리캐스트 콘크리트로 제작되며, 격자 배열된 헬리컬 모노파일 각 상단에 수평적으로 거치되어 복수개씩 헬리컬 모노파일을 선택하여 연결시키는 한 쌍의 1단 기반콘크리트와; 상기 1단 기반콘크리트의 상면에 안착시켜 적층된 2단 기반콘크리트와; 상기 2단 기반콘크리트의 상면에 안착된 후 1단 기반콘크리트에 고정 설치된 앵커볼트에 의해 고정되어 상향으로 입설되며 내부에 등주 사다리가 설치되어 있는 등주와; 등명기 거치대, 배터리 보관함, 태양전지 거치대를 갖고 상기 등주의 최상단에 설치된 등탑과; 1단 기반콘크리트와와 2단 기반콘크리트의 사이에는 슬라이딩식으로 등대점검홀을 개폐하는 도난방지용 도어가 설치되어 있는 것을 특징으로 한다.
PC Concrete smart marine lighthouse with PC modularity and its construction method
PC 모듈화를 적용한 콘크리트 스마트 해상용 등대 및 이의 시공 방법
KIM JUNG WAN (author) / KIM SANG SEUP (author) / JO BYEONG HYEON (author) / KIM YONG BOG (author) / LEE SE JUN (author) / JUNG EUI SU (author) / JIN SEONG HYEON (author) / KIM YOUNG HWAN (author) / BACK JONG JIN (author) / KIM KEUN JAE (author)
2023-12-04
Patent
Electronic Resource
Korean
IPC:
B63B
Schiffe oder sonstige Wasserfahrzeuge
,
SHIPS OR OTHER WATERBORNE VESSELS
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
/
F21S
Ortsfeste Leuchten
,
NON-PORTABLE LIGHTING DEVICES
/
F21W
Index-Schema in Verbindung mit den Unterklassen F21K, F21L, F21S und F21V, betreffend den Gebrauch oder Einsatz von Leuchten oder Beleuchtungssystem
,
INDEXING SCHEME ASSOCIATED WITH SUBCLASSES F21K, F21L, F21S and F21V, RELATING TO USES OR APPLICATIONS OF LIGHTING DEVICES OR SYSTEMS
PC Concrete smart land lighthouse with PC modularity and its construction method
European Patent Office | 2024
|Closure on Lighthouse Construction
ASCE | 2021
|Construction of Tripoli lighthouse
Engineering Index Backfile | 1930
|Discussion on Lighthouse Construction
ASCE | 2021
|