A platform for research: civil engineering, architecture and urbanism
PRESTRESSED CONCRETE GIRDER AND METHOD CONSTRUCTING THE GIRDER BRIDGE USING THE SAME
The present invention relates to a method for constructing a pre-stressed concrete continuous girder applied with compression stress using the tension of a pre-stressed (PS) strand including: a first PS strand having one end fixated at a position of an neutral axis of the girder inside the concrete girder by a movable mounting piece according to the bending moment of a continuous bridge and the other end fixated on the top of the neutral axis of the girder by a movable mounting piece; and a second PS strand having one end fixated by a movable mounting piece and the other end fixated by a fixed mounting piece at a position spaced away from the end at a predetermined interval to avoid the excessive induction of the compression stress to the lower part of the concrete girder in a section near to an inner spot unit. The present invention is characterized by placing the pre-stressed continuous girder manufactured by the method on an abutment and a pier, moving the end of the girder upward at a position which is not connected to the abutment in case of a short-span girder bridge, and inducing compression stress to a slab concrete where tensile strength is generated by moving the girder downward at an inner position in case of multi-span continuous girder bridge. The present invention is capable of simplifying five steps of a process of constructing a two-span continuous bridge and eight step of a process of constructing a three-span continuous bridge based on an existing cited invention into three-steps of processes, thereby reducing construction costs by reducing a construction period. In addition, the present invention is capable of not only reducing about 10% of a girder height in comparison with the existing method, but also constructing the continuous girder bridge more safe by removing the risk of the generation of a construction joint which might occur when constructing by placing slab concrete at once.
PS 강연선의 긴장을 이용해 압축응력을 도입하는 프리스트레스트 콘크리트 연속 거더로서, 연속교의 휨모멘트 형상에 따라 콘크리트 거더 내 일측 단부에는 거더의 중립축 위치에 가동정착구로 고정되고, 타측 단부에서는 거더의 중립축 상부에 가동정착구로 고정되는 제1 PS 강연선과, 일측 단부에는 가동정착구로 고정되고, 내측지점부 부근 구간에서 콘크리트 거더 하단부에 과도한 압축응력 도입을 피하기 위해 타측 단부에는 단부로부터 소정 거리가 이격되는 위치에 고정정착구로 고정되는 제2 PS 강연선을 포함하여 구성된 것을 특징으로 하는 프리스트레스트 콘크리트 연속 거더의 제작 방법과 이에 제작된 프리스트레스트 콘크리트 연속 거더를 교대 및 교각 상에 거치하고 단경간 거더교에서는 교대와 연결되지 않은 지점에서 거더의 단부를 상승시키거나 다경간 연속 거더교에서는 내측지점에서 거더를 하강시켜 인장응력이 발생하는 슬래브 콘크리트에 압축응력을 도입시키는 것을 특징으로 하며, 이의 효과로는 기존 인용발명의 2경간 연속교에서의 5단계에 걸친 시공 공정과 3경간 연속교에서의 8단계에 걸친 시공 공정을 각각 3단계의 시공 공정으로 간략화시킬 수 있어 빠른 시공 공기를 확보하여 전체 공사비를 절감할 수 있을 뿐만 아니라 종래 기술 대비 10% 정도의 형고 감소 효과는 물론 슬래브 콘크리트를 한꺼번에 타설하여 시공시 발생할 수 있는 시공조인트의 발생 우려도 종식시킬 수 있어 보다 안전한 연속 거더교의 시공을 꾀할 수 있다.
PRESTRESSED CONCRETE GIRDER AND METHOD CONSTRUCTING THE GIRDER BRIDGE USING THE SAME
The present invention relates to a method for constructing a pre-stressed concrete continuous girder applied with compression stress using the tension of a pre-stressed (PS) strand including: a first PS strand having one end fixated at a position of an neutral axis of the girder inside the concrete girder by a movable mounting piece according to the bending moment of a continuous bridge and the other end fixated on the top of the neutral axis of the girder by a movable mounting piece; and a second PS strand having one end fixated by a movable mounting piece and the other end fixated by a fixed mounting piece at a position spaced away from the end at a predetermined interval to avoid the excessive induction of the compression stress to the lower part of the concrete girder in a section near to an inner spot unit. The present invention is characterized by placing the pre-stressed continuous girder manufactured by the method on an abutment and a pier, moving the end of the girder upward at a position which is not connected to the abutment in case of a short-span girder bridge, and inducing compression stress to a slab concrete where tensile strength is generated by moving the girder downward at an inner position in case of multi-span continuous girder bridge. The present invention is capable of simplifying five steps of a process of constructing a two-span continuous bridge and eight step of a process of constructing a three-span continuous bridge based on an existing cited invention into three-steps of processes, thereby reducing construction costs by reducing a construction period. In addition, the present invention is capable of not only reducing about 10% of a girder height in comparison with the existing method, but also constructing the continuous girder bridge more safe by removing the risk of the generation of a construction joint which might occur when constructing by placing slab concrete at once.
PS 강연선의 긴장을 이용해 압축응력을 도입하는 프리스트레스트 콘크리트 연속 거더로서, 연속교의 휨모멘트 형상에 따라 콘크리트 거더 내 일측 단부에는 거더의 중립축 위치에 가동정착구로 고정되고, 타측 단부에서는 거더의 중립축 상부에 가동정착구로 고정되는 제1 PS 강연선과, 일측 단부에는 가동정착구로 고정되고, 내측지점부 부근 구간에서 콘크리트 거더 하단부에 과도한 압축응력 도입을 피하기 위해 타측 단부에는 단부로부터 소정 거리가 이격되는 위치에 고정정착구로 고정되는 제2 PS 강연선을 포함하여 구성된 것을 특징으로 하는 프리스트레스트 콘크리트 연속 거더의 제작 방법과 이에 제작된 프리스트레스트 콘크리트 연속 거더를 교대 및 교각 상에 거치하고 단경간 거더교에서는 교대와 연결되지 않은 지점에서 거더의 단부를 상승시키거나 다경간 연속 거더교에서는 내측지점에서 거더를 하강시켜 인장응력이 발생하는 슬래브 콘크리트에 압축응력을 도입시키는 것을 특징으로 하며, 이의 효과로는 기존 인용발명의 2경간 연속교에서의 5단계에 걸친 시공 공정과 3경간 연속교에서의 8단계에 걸친 시공 공정을 각각 3단계의 시공 공정으로 간략화시킬 수 있어 빠른 시공 공기를 확보하여 전체 공사비를 절감할 수 있을 뿐만 아니라 종래 기술 대비 10% 정도의 형고 감소 효과는 물론 슬래브 콘크리트를 한꺼번에 타설하여 시공시 발생할 수 있는 시공조인트의 발생 우려도 종식시킬 수 있어 보다 안전한 연속 거더교의 시공을 꾀할 수 있다.
PRESTRESSED CONCRETE GIRDER AND METHOD CONSTRUCTING THE GIRDER BRIDGE USING THE SAME
프리스트레스트 콘크리트 거더 및 이를 이용한 연속 거더교 및 단경간 거더교의 시공방법
KOO HO WON (author) / KOO MIN SE (author)
2015-06-30
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2021
|SEGMENTAL PRESTRESSED CONCRETE GIRDER AND METHOD FOR CONSTRUCTING SAME
European Patent Office | 2015
|