A platform for research: civil engineering, architecture and urbanism
PBD COMPLEX EQUIPMENT INSTALLED BEFOREHAND BORING STRUCTURE WITH VIBRATORY-HAMMER/BREAKER AND SYSTEM/METHOD THEREOF
The present invention relates to a PBD combined device with a preliminary boring structure at one side of a leader of an ordinary PBD device including a PBD structure. After a preliminary borehole is preliminarily formed in an underground composite stratum, where a rock stratum and a hard sand stratum are mixed, by utilizing the PBD combined device, a PBD draining member is tamped into the preliminary borehole. In this regard, the preliminary borehole is bored by the preliminary boring structure, and the PBD draining member is tamped by an ordinary PBD structure. Also, the preliminary boring structure is formed by a hitting rod, a hitting means, and a shock control drawing wire, the intrusion of the hitting rod is conducted by the hitting means, and the drawing of the hitting rod is conducted by the upward force of the shock control drawing wire. In addition, the preliminary borehole is formed with the drawing of the hitting rod, and the hitting rod and a mandrel of the PBD structure are formed to have almost the same diameter so that a spaced distance is minimized and verticality is improved. Furthermore, since the preliminary borehole is formed in the way of pushing rock of a rock stratum, which is a discontinuum, to a movement space on left and right sides by a sharp front end of the hitting rod, rock is not fallen to a lower weak stratum so that the draining member is not cut by fallen rock when the PBD draining member is tamped, and skin friction force is minimized by a vibratory hammer, thereby facilitating drawing at a depth. Also, the PBD draining member may be efficiently tamped in an underground composite stratum by a single PBD combined device.
본 발명은 PBD 구조가 구비된 통상의 PBD 장비의 리더 일측에 선 천공구조가 장착된 PBD 복합장비이고, 이에 의하여 사석층이나 단단한 모래층이 혼재된 지중 복합층에 선 천공을 먼저 형성한 다음, 선 천공에 PBD 배수재를 타입하되 선 천공은 선 천공구조에 의하여, 그리고 PBD 배수재 타입은 통상의 PBD 구조에 의하여 이루어지는 한편, 선 천공구조는 타격로드와 타격수단과 충격억제인발와이어로 형성되고, 타격로드의 관입은 타격수단에 의하여, 그리고 타격로드의 인발은 충격억제인발와이어의 상향력에 의하여 이루어지며, 선 천공은 관입된 타격로드의 인발과 함께 형성되고, 타격로드의 직경과 PBD 구조의 맨드렐 직경을 거의 같게 형성함으로써 이격공간을 최소화될 뿐 아니라 연직도가 향상되고, 선 천공의 형성은 타격로드의 뾰족한 선단에 의해 불연속체인 사석층의 사석을 좌우측 이동공간으로 밀어내는 방식으로 형성되므로 사석이 아래 연약층으로 빠지지 않아 PBD 배수재의 타입 시 빠진 사석으로 인해 배수재가 절단되지 않게 될 뿐만 아니라 바이브로 햄머에 의해 주면마찰력을 최소화할 수 있어 장심도의 인발이 가능하고, 또한 하나의 PBD 복합장비에 의하여 지중 복합층에 PBD 배수재의 타입이 가능하면서 효율적으로 이루어지는 유용한 발명이다.
PBD COMPLEX EQUIPMENT INSTALLED BEFOREHAND BORING STRUCTURE WITH VIBRATORY-HAMMER/BREAKER AND SYSTEM/METHOD THEREOF
The present invention relates to a PBD combined device with a preliminary boring structure at one side of a leader of an ordinary PBD device including a PBD structure. After a preliminary borehole is preliminarily formed in an underground composite stratum, where a rock stratum and a hard sand stratum are mixed, by utilizing the PBD combined device, a PBD draining member is tamped into the preliminary borehole. In this regard, the preliminary borehole is bored by the preliminary boring structure, and the PBD draining member is tamped by an ordinary PBD structure. Also, the preliminary boring structure is formed by a hitting rod, a hitting means, and a shock control drawing wire, the intrusion of the hitting rod is conducted by the hitting means, and the drawing of the hitting rod is conducted by the upward force of the shock control drawing wire. In addition, the preliminary borehole is formed with the drawing of the hitting rod, and the hitting rod and a mandrel of the PBD structure are formed to have almost the same diameter so that a spaced distance is minimized and verticality is improved. Furthermore, since the preliminary borehole is formed in the way of pushing rock of a rock stratum, which is a discontinuum, to a movement space on left and right sides by a sharp front end of the hitting rod, rock is not fallen to a lower weak stratum so that the draining member is not cut by fallen rock when the PBD draining member is tamped, and skin friction force is minimized by a vibratory hammer, thereby facilitating drawing at a depth. Also, the PBD draining member may be efficiently tamped in an underground composite stratum by a single PBD combined device.
본 발명은 PBD 구조가 구비된 통상의 PBD 장비의 리더 일측에 선 천공구조가 장착된 PBD 복합장비이고, 이에 의하여 사석층이나 단단한 모래층이 혼재된 지중 복합층에 선 천공을 먼저 형성한 다음, 선 천공에 PBD 배수재를 타입하되 선 천공은 선 천공구조에 의하여, 그리고 PBD 배수재 타입은 통상의 PBD 구조에 의하여 이루어지는 한편, 선 천공구조는 타격로드와 타격수단과 충격억제인발와이어로 형성되고, 타격로드의 관입은 타격수단에 의하여, 그리고 타격로드의 인발은 충격억제인발와이어의 상향력에 의하여 이루어지며, 선 천공은 관입된 타격로드의 인발과 함께 형성되고, 타격로드의 직경과 PBD 구조의 맨드렐 직경을 거의 같게 형성함으로써 이격공간을 최소화될 뿐 아니라 연직도가 향상되고, 선 천공의 형성은 타격로드의 뾰족한 선단에 의해 불연속체인 사석층의 사석을 좌우측 이동공간으로 밀어내는 방식으로 형성되므로 사석이 아래 연약층으로 빠지지 않아 PBD 배수재의 타입 시 빠진 사석으로 인해 배수재가 절단되지 않게 될 뿐만 아니라 바이브로 햄머에 의해 주면마찰력을 최소화할 수 있어 장심도의 인발이 가능하고, 또한 하나의 PBD 복합장비에 의하여 지중 복합층에 PBD 배수재의 타입이 가능하면서 효율적으로 이루어지는 유용한 발명이다.
PBD COMPLEX EQUIPMENT INSTALLED BEFOREHAND BORING STRUCTURE WITH VIBRATORY-HAMMER/BREAKER AND SYSTEM/METHOD THEREOF
선 천공구조가 장착된 PBD 복합장비와 이를 이용하여 지중 복합층에 PBD 타입 시스템 및 이를 이용하여 지중 복합층에 PBD 타입시공방법
CHOI GWI BONG (author) / CHOI JAE HO (author)
2016-01-13
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2016
European Patent Office | 2017
|European Patent Office | 2017
|