CONSTRUCTING METHOD OF NON-BRIDGE SEAT BRIDGE
The present invention relates to a construction method of a bridge without bearings and joints, which does not require an additional bearing device. According to an embodiment of the present invention, the construction method of the bridge without bearings and joints comprises: a step (a) of manufacturing a girder having a shear key groove; a step (b) of excavating the ground where an abutment is to be installed; a step (c) of constructing a foundation abutment by forming a shear key for horizontal shear resistance and hinge movement in the top of the foundation abutment and embedding a dowel bar in the shear key for horizontal shear resistance and hinge movement; a step (d) of installing an elastic support on the top of the foundation abutment; a step (e) of placing the girder on the top of the foundation abutment; a step (f) of forming a block for hinge movement to embed the dowel bar in the gap between the girders on the top of the foundation abutment; a step (g) of installing reinforcing bars for a floor plate in the girder, the foundation abutment, and the top of the block for hinge movement; a step (h) of forming a wall abutment and a floor plate in the girder, the foundation abutment, the top and back surfaces of the block for hinge movement; a step (i) of forming a backfill part in the foundation abutment and the back surface of the wall abutment; and a step (j) of constructing a connection slab in the foundation abutment between the floor plate and a road and in the top of the backfill part in the back surface of the wall abutment.
본 발명은 기초 교대에 수평 전단저항 및 힌지거동용 쉬어키를 형성하고, 거더에 수평 전단저항 및 힌지거동용 쉬어키와 대응되는 쉬어키 홈을 형성하여 거더가 기초 교대에 거치될 때, 거더의 쉬어키 홈에 기초 교대의 수평 전단저항 및 힌지거동용 쉬어키가 맞물려 힌지거동을 하도록 거치되어 별도의 교좌 장치가 필요 없는 무교좌 및 무조인트 교량의 시공방법에 관한 것이다. 본 발명의 바람직한 일 실시예는 (a) 길이방향 일단부 또는 양단부 하부에, 폭방향의 전체 길이 또는 폭방향의 양측단부에서 내측으로 일정거리 이격된 지점까지 쉬어키 홈이 형성되는 거더를 제작하는 단계; (b) 교대를 설치할 지반 바닥부를 일정 깊이로 굴착하는 단계; (c) 폭방향의 전체 길이 또는 폭방향의 일정 간격으로 상부로 돌출하여 수평 전단저항 및 힌지거동용 쉬어키가 형성되고, 수평 전단저항 및 힌지거동용 쉬어키에는 수직상부로 돌출하도록 다우웰 바를 매입하여 기초 교대를 시공하는 단계; (d) 거더 단부의 폭방향 중앙부가 거치되는 기초 교대의 상부에 탄성 받침을 설치하는 단계; (e) 기초 교대의 상부에, 수평 전단저항 및 힌지거동용 쉬어키에 쉬어키 홈이 맞물리도록 거더를 거치하는 단계; (f) 기초 교대의 상부의 거더와 거더의 사이에 다우웰 바가 매입되도록 콘크리트를 타설하여 힌지거동 블럭을 형성하는 단계; (g) 거더, 기초 교대 및 힌지거동 블럭의 상부에 바닥판 철근을 설치하는 단계; (h) 거더, 기초 교대 및 힌지거동 블럭의 상부 및 배면에 콘크리트를 타설하여 벽체 교대와 바닥판을 형성하는 단계; (i) 기초 교대와 벽체 교대의 배면에 뒷채움을 실시하여 뒷채움부을 형성하는 단계; (j) 바닥판과 도로 사이의 기초 교대 및 벽체 교대 배면의 뒷채움부 상부에 접속슬래브를 시공하는 단계;를 포함하여 이루어진다.
CONSTRUCTING METHOD OF NON-BRIDGE SEAT BRIDGE
The present invention relates to a construction method of a bridge without bearings and joints, which does not require an additional bearing device. According to an embodiment of the present invention, the construction method of the bridge without bearings and joints comprises: a step (a) of manufacturing a girder having a shear key groove; a step (b) of excavating the ground where an abutment is to be installed; a step (c) of constructing a foundation abutment by forming a shear key for horizontal shear resistance and hinge movement in the top of the foundation abutment and embedding a dowel bar in the shear key for horizontal shear resistance and hinge movement; a step (d) of installing an elastic support on the top of the foundation abutment; a step (e) of placing the girder on the top of the foundation abutment; a step (f) of forming a block for hinge movement to embed the dowel bar in the gap between the girders on the top of the foundation abutment; a step (g) of installing reinforcing bars for a floor plate in the girder, the foundation abutment, and the top of the block for hinge movement; a step (h) of forming a wall abutment and a floor plate in the girder, the foundation abutment, the top and back surfaces of the block for hinge movement; a step (i) of forming a backfill part in the foundation abutment and the back surface of the wall abutment; and a step (j) of constructing a connection slab in the foundation abutment between the floor plate and a road and in the top of the backfill part in the back surface of the wall abutment.
본 발명은 기초 교대에 수평 전단저항 및 힌지거동용 쉬어키를 형성하고, 거더에 수평 전단저항 및 힌지거동용 쉬어키와 대응되는 쉬어키 홈을 형성하여 거더가 기초 교대에 거치될 때, 거더의 쉬어키 홈에 기초 교대의 수평 전단저항 및 힌지거동용 쉬어키가 맞물려 힌지거동을 하도록 거치되어 별도의 교좌 장치가 필요 없는 무교좌 및 무조인트 교량의 시공방법에 관한 것이다. 본 발명의 바람직한 일 실시예는 (a) 길이방향 일단부 또는 양단부 하부에, 폭방향의 전체 길이 또는 폭방향의 양측단부에서 내측으로 일정거리 이격된 지점까지 쉬어키 홈이 형성되는 거더를 제작하는 단계; (b) 교대를 설치할 지반 바닥부를 일정 깊이로 굴착하는 단계; (c) 폭방향의 전체 길이 또는 폭방향의 일정 간격으로 상부로 돌출하여 수평 전단저항 및 힌지거동용 쉬어키가 형성되고, 수평 전단저항 및 힌지거동용 쉬어키에는 수직상부로 돌출하도록 다우웰 바를 매입하여 기초 교대를 시공하는 단계; (d) 거더 단부의 폭방향 중앙부가 거치되는 기초 교대의 상부에 탄성 받침을 설치하는 단계; (e) 기초 교대의 상부에, 수평 전단저항 및 힌지거동용 쉬어키에 쉬어키 홈이 맞물리도록 거더를 거치하는 단계; (f) 기초 교대의 상부의 거더와 거더의 사이에 다우웰 바가 매입되도록 콘크리트를 타설하여 힌지거동 블럭을 형성하는 단계; (g) 거더, 기초 교대 및 힌지거동 블럭의 상부에 바닥판 철근을 설치하는 단계; (h) 거더, 기초 교대 및 힌지거동 블럭의 상부 및 배면에 콘크리트를 타설하여 벽체 교대와 바닥판을 형성하는 단계; (i) 기초 교대와 벽체 교대의 배면에 뒷채움을 실시하여 뒷채움부을 형성하는 단계; (j) 바닥판과 도로 사이의 기초 교대 및 벽체 교대 배면의 뒷채움부 상부에 접속슬래브를 시공하는 단계;를 포함하여 이루어진다.
CONSTRUCTING METHOD OF NON-BRIDGE SEAT BRIDGE
무교좌 및 무조인트 교량의 시공방법
PARK JONG MYEN (author) / KIM YOUNG HO (author)
2016-03-23
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
BRIDGE CONSTRUCTING MACHINE AND THE METHOD OF CONSTRUCTING BRIDGE