A platform for research: civil engineering, architecture and urbanism
METHOD FOR CONSTRUCTING THE BASEMENT PILE
Provided is a construction method for a base pile. According to the present invention, the construction method for a base pile includes: a preparative step of constructing a ground improvement layer by filling a bored hole with a predetermined depth formed under the ground, with a filler; a pile arranging step of embedding and fixing a part of a lower end of a first base pile with a predetermined length into the bottom surface of the bored hole and inserting the first base pile into the ground improvement layer of the bored hole in order for a part of an upper end of the first base pile to be exposed; a pile connecting step of integrally connecting a lower end of a second base pile with the predetermined length to the upper end of the first base pile exposed to the upper part of the ground improvement layer; a pile embedding step of embedding a part of a body of the second base pile and the first base pile into a support layer under the bored hole and embedding the base pile comprising the first base pile and the second base pile into the support layer through the ground improvement layer in order for a part of the upper end of the second base pile to be exposed to the outside; and a finishing step of constructing the base pile comprising the first base pile embedded and fixed to the support layer by being integrally connected to the second base pile fixed to the ground improvement layer hardened by curing of the filler, under the ground at the predetermined depth. The construction method for a base pile can guarantee stability after construction by obtaining a sufficient support force on an upper structure using the base pile.
기초말뚝 시공방법을 제공한다. 본 발명은, 지반 아래에 형성된 일정깊이의 천공홀 내에 주입재를 충전하여 지반개량층을 형성하는 예비단계 ; 일정길이를 갖는 제1기초말뚝의 하부단 일부가 상기 천공홀의 바닥면에 근입되어 고정되고, 상기 제1기초말뚝의 상부단 일부가 외부노출되도록 상기 제1기초말뚝을 상기 천공홀의 지반개량층에 삽입배치하는 말뚝배치단계 ; 상기 지반개량층의 상부로 노출되는 제1기초말뚝의 상단에 일정길이를 갖는 제2기초말뚝의 하단을 일체로 연결하는 말뚝연결단계 ; 상기 제1기초말뚝과 더불어 상기 제2기초말뚝의 몸체 일부가 상기 천공홀 아래의 지지층에 근입되고, 상기 제2기초말뚝의 상단일부가 외부노출되도록 상기 제1기초말뚝과 제2기초말뚝으로 이루어진 기초말뚝을 상기 지반개량층을 통해 지지층에 근입하는 말뚝근입단계 ; 상기 주입재의 양생에 의해서 경화된 지반개량층에 의해 고정되는 제2기초말뚝과 일체로 연결되어 상기 지지층에 근입고정된 제1기초말뚝으로 이루어진 기초파일을 지반 아래에 일정깊이 시공하여 마무리단계 ; 를 포함한다.
METHOD FOR CONSTRUCTING THE BASEMENT PILE
Provided is a construction method for a base pile. According to the present invention, the construction method for a base pile includes: a preparative step of constructing a ground improvement layer by filling a bored hole with a predetermined depth formed under the ground, with a filler; a pile arranging step of embedding and fixing a part of a lower end of a first base pile with a predetermined length into the bottom surface of the bored hole and inserting the first base pile into the ground improvement layer of the bored hole in order for a part of an upper end of the first base pile to be exposed; a pile connecting step of integrally connecting a lower end of a second base pile with the predetermined length to the upper end of the first base pile exposed to the upper part of the ground improvement layer; a pile embedding step of embedding a part of a body of the second base pile and the first base pile into a support layer under the bored hole and embedding the base pile comprising the first base pile and the second base pile into the support layer through the ground improvement layer in order for a part of the upper end of the second base pile to be exposed to the outside; and a finishing step of constructing the base pile comprising the first base pile embedded and fixed to the support layer by being integrally connected to the second base pile fixed to the ground improvement layer hardened by curing of the filler, under the ground at the predetermined depth. The construction method for a base pile can guarantee stability after construction by obtaining a sufficient support force on an upper structure using the base pile.
기초말뚝 시공방법을 제공한다. 본 발명은, 지반 아래에 형성된 일정깊이의 천공홀 내에 주입재를 충전하여 지반개량층을 형성하는 예비단계 ; 일정길이를 갖는 제1기초말뚝의 하부단 일부가 상기 천공홀의 바닥면에 근입되어 고정되고, 상기 제1기초말뚝의 상부단 일부가 외부노출되도록 상기 제1기초말뚝을 상기 천공홀의 지반개량층에 삽입배치하는 말뚝배치단계 ; 상기 지반개량층의 상부로 노출되는 제1기초말뚝의 상단에 일정길이를 갖는 제2기초말뚝의 하단을 일체로 연결하는 말뚝연결단계 ; 상기 제1기초말뚝과 더불어 상기 제2기초말뚝의 몸체 일부가 상기 천공홀 아래의 지지층에 근입되고, 상기 제2기초말뚝의 상단일부가 외부노출되도록 상기 제1기초말뚝과 제2기초말뚝으로 이루어진 기초말뚝을 상기 지반개량층을 통해 지지층에 근입하는 말뚝근입단계 ; 상기 주입재의 양생에 의해서 경화된 지반개량층에 의해 고정되는 제2기초말뚝과 일체로 연결되어 상기 지지층에 근입고정된 제1기초말뚝으로 이루어진 기초파일을 지반 아래에 일정깊이 시공하여 마무리단계 ; 를 포함한다.
METHOD FOR CONSTRUCTING THE BASEMENT PILE
기초파일 시공방법
KANG SANG WOOK (author)
2016-08-25
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen