A platform for research: civil engineering, architecture and urbanism
The pile construction method that can reinforce friction pile according to stratum change
The present invention relates to a pile construction method to reinforce a friction pile in accordance with changes in a strata, comprising: (a) a step of measuring a position on which a pile will be constructed by a design; (b) a step of excavating the position measured by step (a); and (c) a step of inserting a friction pile and a non-friction pile to correspond to a section requiring a friction pile and another section requiring a non-friction pile in accordance with changes in the strata of the excavated ground and a structural calculation. The present invention is able to reflect changes in strata of the ground on which a pile will be constructed, and assemble a pile with a high friction factor and a pile with a low friction factor to fit a section with an increased friction force and another section without an increase in friction force; thereby efficiently constructing the piles. That is, piles are able to be constructed to fit a structural calculation and the strata of the ground, and the ground is able to economically be more reinforced.
본원발명은 지층 변화에 따라 마찰파일이 보강되는 파일 시공공법에 관한 것으로 일실시예로 지반을 보강하기 위하여 파일을 근입하는 시공방법에 있어서, (a) 설계에 의해서 파일이 시공될 위치를 측량하는 단계와, (b) 상기 (a)단계에서 측량된 곳을 굴착하는 단계 및, (c) 굴착된 지반의 지층 변화와 구조계산에 맞게 마찰파일이 필요한 구간과 비마찰파일이 필요한 구간에 대응되도록 마찰파일과 비마찰파일이 결합된 파일이 근입되어 안착되는 단계로 구성되는 것을 특징으로 한다. 본 발명은 파일이 시공되는 지반의 지층변화 상태를 반영하여 마찰력이 증대되는 구간과 그렇지 못한 구간에 맞게 마찰계수가 높은 파일과 마찰계수가 적은 파일이 조립되어 시공됨으로 인해 효율적인 파일 시공이 가능하다. 즉, 구조계산과 지반의 지층에 맞게 파일이 시공될 수 있어 지반 보강이 좀 더 경제적으로 시공될 수 있다.
The pile construction method that can reinforce friction pile according to stratum change
The present invention relates to a pile construction method to reinforce a friction pile in accordance with changes in a strata, comprising: (a) a step of measuring a position on which a pile will be constructed by a design; (b) a step of excavating the position measured by step (a); and (c) a step of inserting a friction pile and a non-friction pile to correspond to a section requiring a friction pile and another section requiring a non-friction pile in accordance with changes in the strata of the excavated ground and a structural calculation. The present invention is able to reflect changes in strata of the ground on which a pile will be constructed, and assemble a pile with a high friction factor and a pile with a low friction factor to fit a section with an increased friction force and another section without an increase in friction force; thereby efficiently constructing the piles. That is, piles are able to be constructed to fit a structural calculation and the strata of the ground, and the ground is able to economically be more reinforced.
본원발명은 지층 변화에 따라 마찰파일이 보강되는 파일 시공공법에 관한 것으로 일실시예로 지반을 보강하기 위하여 파일을 근입하는 시공방법에 있어서, (a) 설계에 의해서 파일이 시공될 위치를 측량하는 단계와, (b) 상기 (a)단계에서 측량된 곳을 굴착하는 단계 및, (c) 굴착된 지반의 지층 변화와 구조계산에 맞게 마찰파일이 필요한 구간과 비마찰파일이 필요한 구간에 대응되도록 마찰파일과 비마찰파일이 결합된 파일이 근입되어 안착되는 단계로 구성되는 것을 특징으로 한다. 본 발명은 파일이 시공되는 지반의 지층변화 상태를 반영하여 마찰력이 증대되는 구간과 그렇지 못한 구간에 맞게 마찰계수가 높은 파일과 마찰계수가 적은 파일이 조립되어 시공됨으로 인해 효율적인 파일 시공이 가능하다. 즉, 구조계산과 지반의 지층에 맞게 파일이 시공될 수 있어 지반 보강이 좀 더 경제적으로 시공될 수 있다.
The pile construction method that can reinforce friction pile according to stratum change
지층 변화에 따라 마찰파일이 보강되는 파일 시공공법
SONG KI YONG (author)
2017-08-11
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|