A platform for research: civil engineering, architecture and urbanism
Displacement control device at fixed support and Key-segment closing method of partially earth-anchored cable-stayed bridge using the same
Disclosed is a key-segment girder closing method of a partially earth-anchored cable-stayed bridge using a fixed end displacement control device. The method comprises: a step of installing a main tower horizontal beam wherein a reaction bar is mounted on a main tower; a step of using a support fixing end to detachably fix a girder on the main tower horizontal beam, and installing a support on a lower surface of the girder; a step of installing a hydraulic jack between the reaction bar and the support to reach a maximum stroke; a step of removing the support fixing end while the hydraulic jack is installed; a step of releasing a hydraulic pressure of the hydraulic jack to reduce a stroke to move the girder towards an anchor block; a step of lifting a key-segment girder in a space between first and second cable-stayed bridges; a step of connecting one end of the lifted key-segment girder to a girder of the first cable-stayed bridge; and a step of operating the hydraulic jack to move the girder of the first cable-stayed bridge to an original position and connect the other end of the key-segment girder to a girder of the second cable-stayed bridge.
고정단 변위제어장치를 이용한 일부타정식 사장교 키세그먼트 거더 폐합방법이 개시되어 있다. 본 발명은, 주탑에 반력대가 장착된 주탑 가로보를 설치하는 단계; 받침고정단을 이용하여 상기 주탑가로보 위에 거더를 탈착가능하게 고정시키고, 상기 거더의 하면에 지지대를 설치하는 단계; 상기 반력대와 상기 지지대 사이에 유압잭을 최대 스트로크가 되도록 설치하는 단계; 유압잭이 설치된 상태에서 상기 받침고정단을 제거하는 단계; 상기 유압잭의 유압을 해제시켜 스트로크를 줄여주어 상기 거더를 상기 앵커블록 방향으로 이동시키는 단계; 제 1사장교와 제 2사장교 사이의 공간에 키세그먼트 거더를 인상하는 단계; 인상된 키세그먼트 거더의 일단을 제 1사장교의 거더에 연결하는 단계; 및 유압잭을 작동시켜 상기 제 1사장교의 거더를 원위치로 이동시키고 키세그먼트 거더의 타단을 제 2사장교의 거더에 연결하는 단계;를 포함하는 것을 특징으로 한다.
Displacement control device at fixed support and Key-segment closing method of partially earth-anchored cable-stayed bridge using the same
Disclosed is a key-segment girder closing method of a partially earth-anchored cable-stayed bridge using a fixed end displacement control device. The method comprises: a step of installing a main tower horizontal beam wherein a reaction bar is mounted on a main tower; a step of using a support fixing end to detachably fix a girder on the main tower horizontal beam, and installing a support on a lower surface of the girder; a step of installing a hydraulic jack between the reaction bar and the support to reach a maximum stroke; a step of removing the support fixing end while the hydraulic jack is installed; a step of releasing a hydraulic pressure of the hydraulic jack to reduce a stroke to move the girder towards an anchor block; a step of lifting a key-segment girder in a space between first and second cable-stayed bridges; a step of connecting one end of the lifted key-segment girder to a girder of the first cable-stayed bridge; and a step of operating the hydraulic jack to move the girder of the first cable-stayed bridge to an original position and connect the other end of the key-segment girder to a girder of the second cable-stayed bridge.
고정단 변위제어장치를 이용한 일부타정식 사장교 키세그먼트 거더 폐합방법이 개시되어 있다. 본 발명은, 주탑에 반력대가 장착된 주탑 가로보를 설치하는 단계; 받침고정단을 이용하여 상기 주탑가로보 위에 거더를 탈착가능하게 고정시키고, 상기 거더의 하면에 지지대를 설치하는 단계; 상기 반력대와 상기 지지대 사이에 유압잭을 최대 스트로크가 되도록 설치하는 단계; 유압잭이 설치된 상태에서 상기 받침고정단을 제거하는 단계; 상기 유압잭의 유압을 해제시켜 스트로크를 줄여주어 상기 거더를 상기 앵커블록 방향으로 이동시키는 단계; 제 1사장교와 제 2사장교 사이의 공간에 키세그먼트 거더를 인상하는 단계; 인상된 키세그먼트 거더의 일단을 제 1사장교의 거더에 연결하는 단계; 및 유압잭을 작동시켜 상기 제 1사장교의 거더를 원위치로 이동시키고 키세그먼트 거더의 타단을 제 2사장교의 거더에 연결하는 단계;를 포함하는 것을 특징으로 한다.
Displacement control device at fixed support and Key-segment closing method of partially earth-anchored cable-stayed bridge using the same
고정단 변위제어장치 및 그를 이용한 일부타정식 사장교 키세그먼트 거더 폐합방법
WON JEONG HUN (author)
2018-02-05
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Seismic Response of Partially Earth-anchored Cable-Stayed Bridge
British Library Conference Proceedings | 1999
|British Library Conference Proceedings | 2008
|Dynamic Response of Partially Earth-Anchored Cable Stayed Bridge Under Earthquake Motion
British Library Conference Proceedings | 1996
|