soffit length for fixing beam
The present invention relates to a soffit length for fixing a beam. A slab panel, a durable support, and a beam are installed in this order for concrete pouring and ceiling concrete curing. Then, beams are integrally dropped and disassembled with the durable support used as an axis. Accordingly, beam installation and disassembly are facilitated during formwork and work safety and construction efficiency are improved. In addition, noise, dust, and civil petitions during construction are minimized during durable support-based slab aluminum panel drop construction in which the soffit length is used. The present invention includes an SL main body (2100) installed in the upper portion of a wall body panel (10) installed on one side of a wall surface, supporting a beam (3000), and fixed to the upper portion of the wall body panel (10), the beam (3000) being in close contact with one end thereof; and a beam-fixing auxiliary SL (2300) fastened to the inside of the SL main body and supporting and fixing the beam (3000).
본 발명은 슬라브패널, 존치형서포트, 빔 순으로 설치하여 콘크리트를 타설하고 천장콘크리트를 양생시킨 후 존치형서포트를 축으로 빔과 빔을 일체로 드롭하여 해체함으로써 거푸집 시공시 빔의 설치 및 해체가 용이할 뿐만 아니라, 더욱 향상된 작업안전성 및 시공 효율성과 공사중 발생하는 소음, 분진, 민원을 최소화한 존치형 서포트를 활용한 슬래브 알루미늄판넬 드롭시공에 사용되는 빔 고정용 소피드 렝스구조에 관한 것으로, 벽면 일측에 설치되는 벽체패널(10) 상부에 설치되고, 빔(3000)을 지지하는 것으로, 벽체패널(10) 상부에 고정되며, 일단에 빔(3000)이 밀착되는 SL본체(2100)와; SL본체 내측에 체결되어 빔(3000)을 지지 및 고정하는 빔고정 보조SL(2300)을 포함하는 것을 특징으로 한다.
soffit length for fixing beam
The present invention relates to a soffit length for fixing a beam. A slab panel, a durable support, and a beam are installed in this order for concrete pouring and ceiling concrete curing. Then, beams are integrally dropped and disassembled with the durable support used as an axis. Accordingly, beam installation and disassembly are facilitated during formwork and work safety and construction efficiency are improved. In addition, noise, dust, and civil petitions during construction are minimized during durable support-based slab aluminum panel drop construction in which the soffit length is used. The present invention includes an SL main body (2100) installed in the upper portion of a wall body panel (10) installed on one side of a wall surface, supporting a beam (3000), and fixed to the upper portion of the wall body panel (10), the beam (3000) being in close contact with one end thereof; and a beam-fixing auxiliary SL (2300) fastened to the inside of the SL main body and supporting and fixing the beam (3000).
본 발명은 슬라브패널, 존치형서포트, 빔 순으로 설치하여 콘크리트를 타설하고 천장콘크리트를 양생시킨 후 존치형서포트를 축으로 빔과 빔을 일체로 드롭하여 해체함으로써 거푸집 시공시 빔의 설치 및 해체가 용이할 뿐만 아니라, 더욱 향상된 작업안전성 및 시공 효율성과 공사중 발생하는 소음, 분진, 민원을 최소화한 존치형 서포트를 활용한 슬래브 알루미늄판넬 드롭시공에 사용되는 빔 고정용 소피드 렝스구조에 관한 것으로, 벽면 일측에 설치되는 벽체패널(10) 상부에 설치되고, 빔(3000)을 지지하는 것으로, 벽체패널(10) 상부에 고정되며, 일단에 빔(3000)이 밀착되는 SL본체(2100)와; SL본체 내측에 체결되어 빔(3000)을 지지 및 고정하는 빔고정 보조SL(2300)을 포함하는 것을 특징으로 한다.
soffit length for fixing beam
빔 고정용 소피드 렝스구조
BAEK HUI JEONG (author) / LIM NAM GI (author) / KIM JIN WOO (author) / KIM KYE WHAN (author)
2018-10-02
Patent
Electronic Resource
Korean
IPC:
E04G
SCAFFOLDING
,
Baugerüste
EAVE SOFFIT PANEL, EAVE SOFFIT STRUCTURE, BUILDING AND EAVE SOFFIT PANEL INSTALLING METHOD
European Patent Office | 2017
|