The present invention relates to a geothermal heat exchange system and a geothermal heat exchange system construction method. A bore hole where the vertically closed geothermal heat exchange system is installed for geothermal heat is divided into a mixed geothermal source region and a shallow geothermal source region. The bore hole of the shallow geothermal source region rarely affected by atmospheric and ground surface temperatures is filled with an existing heat-transfer grouting material with high thermal conductivity. The bore hole of the mixed geothermal source region seasonally and significantly affected by the atmospheric and ground surface temperatures is built with an insulating cartridge or filled with an insulating grouting material. While a heat transfer medium holding the geothermal energy obtained in the shallow geothermal source passes through the mixed geothermal source region, heat loss in winter or temperature rise in summer is prevented, and thus the acquisition rate of geothermal energy by the geothermal heat exchange system can be further raised.
본 발명은 지중열교환 시스템 및 지중열교환 시스템의 시공방법에 관한 것으로서, 보다 상세하게는, 지열을 취득하기 위하여 수직 밀폐형 지중열교환 시스템이 설치되는 천공(bore hole)을 혼합(混合)지열원 구역과 천부(淺部)지열원 구역으로 구분하고, 대기 및 지표온도의 영향을 거의 받지 않는 천부지열원 구역의 천공에는 열전도도가 높은 기존의 전열(傳熱)그라우팅재를 충전하고, 계절에 따라 대기 및 지표온도에 영향을 많이 받는 혼합지열원 구역의 천공에는 단열(斷熱)그라우팅재를 충전하거나 단열성 카트리지를 시공함으로써, 천부지열원에서 취득한 지열 에너지를 보유하고 있는 열전달 매체가 혼합지열원 구역을 통과하는 과정에서, 동계에 발생하는 열손실 혹은 하계에 발생하는 온도 상승을 방지하여 지중열교환 시스템에 의한 지열 에너지의 취득률을 보다 높일 수 있도록 하는 지중열교환 시스템 및 지중열교환 시스템의 시공방법에 관한 것이다.
The present invention relates to a geothermal heat exchange system and a geothermal heat exchange system construction method. A bore hole where the vertically closed geothermal heat exchange system is installed for geothermal heat is divided into a mixed geothermal source region and a shallow geothermal source region. The bore hole of the shallow geothermal source region rarely affected by atmospheric and ground surface temperatures is filled with an existing heat-transfer grouting material with high thermal conductivity. The bore hole of the mixed geothermal source region seasonally and significantly affected by the atmospheric and ground surface temperatures is built with an insulating cartridge or filled with an insulating grouting material. While a heat transfer medium holding the geothermal energy obtained in the shallow geothermal source passes through the mixed geothermal source region, heat loss in winter or temperature rise in summer is prevented, and thus the acquisition rate of geothermal energy by the geothermal heat exchange system can be further raised.
본 발명은 지중열교환 시스템 및 지중열교환 시스템의 시공방법에 관한 것으로서, 보다 상세하게는, 지열을 취득하기 위하여 수직 밀폐형 지중열교환 시스템이 설치되는 천공(bore hole)을 혼합(混合)지열원 구역과 천부(淺部)지열원 구역으로 구분하고, 대기 및 지표온도의 영향을 거의 받지 않는 천부지열원 구역의 천공에는 열전도도가 높은 기존의 전열(傳熱)그라우팅재를 충전하고, 계절에 따라 대기 및 지표온도에 영향을 많이 받는 혼합지열원 구역의 천공에는 단열(斷熱)그라우팅재를 충전하거나 단열성 카트리지를 시공함으로써, 천부지열원에서 취득한 지열 에너지를 보유하고 있는 열전달 매체가 혼합지열원 구역을 통과하는 과정에서, 동계에 발생하는 열손실 혹은 하계에 발생하는 온도 상승을 방지하여 지중열교환 시스템에 의한 지열 에너지의 취득률을 보다 높일 수 있도록 하는 지중열교환 시스템 및 지중열교환 시스템의 시공방법에 관한 것이다.
Geothermal Heat Exchanging System and Construction Method thereof
지중열교환 시스템 및 지중열교환 시스템의 시공방법
BAI MIN (author)
2018-12-26
Patent
Electronic Resource
Korean
Geothermal Heat Exchanging System and Construction Method thereof