The present invention relates to a geodesic dome construction method including (a) erecting a liftable hydraulic tower on a ground surface so that a plurality of panels having a polygonal sectional shape can be assembled close to the ground; (b) assembling the plurality of panels at the upper end of the tower to construct a central ceiling portion of the geodesic dome; (c) raising the tower by a predetermined height so as to enable assembly work of the panel close to the ground; (d) constructing an outer wall of the geodesic dome by assembling the plurality of panels around the central ceiling portion of the geodesic dome raised to a predetermined height; (e) constructing the outer wall of the geodesic dome by repeating the (c) and (d) steps while raising the tower in stages to a maximum height at which the overall appearance of the geodesic dome is formed; (f) assembling the plurality of panels in the geodesic dome to construct a remaining outer wall of the geodesic dome when the top of the tower reaches the maximum height; (g) separating the central ceiling portion of the geodesic dome and the upper end of the tower; and (h) disassembling the tower.
본 발명은 지오데식 돔의 시공방법에 관한 것으로서, (a) 다각형의 단면형상을 갖는 복수의 패널을 지상 가까이서 조립 작업이 가능하도록, 승강가능한 유압식 타워를 지면에 기립 설치하는 단계; (b) 상기 타워의 상단부에 복수의 패널을 조립하여, 지오데식 돔의 중앙 천정부를 시공하는 단계; (c) 지상 가까이서 패널의 조립 작업이 가능하도록 상기 타워를 일정 높이만큼 상승시키는 단계; (d) 일정 높이로 상승한 지오데식 돔의 중앙 천정부의 주변에 복수의 패널로 조립하여, 지오데식 돔의 외벽을 시공하는 단계; (e) 상기 타워를 지오데식 돔의 전체적인 외관이 형성되는 최고 높이까지 단계적으로 상승시키며 상기 (c)단계 내지 상기 (d) 단계를 반복 실시하여, 지오데식 돔의 외벽을 시공하는 단계; (f) 상기 타워의 상단부가 상기 최고 높이에 도달하면, 지오데식 돔에 복수의 패널을 조립하여 지오데식 돔의 잔여 외벽을 시공하는 단계; (g) 지오데식 돔의 중앙 천정부와 상기 타워의 상단부를 분리하는 단계; 및 (h) 상기 타워를 해체하는 단계;를 포함하는 것을 특징으로 한다.
The present invention relates to a geodesic dome construction method including (a) erecting a liftable hydraulic tower on a ground surface so that a plurality of panels having a polygonal sectional shape can be assembled close to the ground; (b) assembling the plurality of panels at the upper end of the tower to construct a central ceiling portion of the geodesic dome; (c) raising the tower by a predetermined height so as to enable assembly work of the panel close to the ground; (d) constructing an outer wall of the geodesic dome by assembling the plurality of panels around the central ceiling portion of the geodesic dome raised to a predetermined height; (e) constructing the outer wall of the geodesic dome by repeating the (c) and (d) steps while raising the tower in stages to a maximum height at which the overall appearance of the geodesic dome is formed; (f) assembling the plurality of panels in the geodesic dome to construct a remaining outer wall of the geodesic dome when the top of the tower reaches the maximum height; (g) separating the central ceiling portion of the geodesic dome and the upper end of the tower; and (h) disassembling the tower.
본 발명은 지오데식 돔의 시공방법에 관한 것으로서, (a) 다각형의 단면형상을 갖는 복수의 패널을 지상 가까이서 조립 작업이 가능하도록, 승강가능한 유압식 타워를 지면에 기립 설치하는 단계; (b) 상기 타워의 상단부에 복수의 패널을 조립하여, 지오데식 돔의 중앙 천정부를 시공하는 단계; (c) 지상 가까이서 패널의 조립 작업이 가능하도록 상기 타워를 일정 높이만큼 상승시키는 단계; (d) 일정 높이로 상승한 지오데식 돔의 중앙 천정부의 주변에 복수의 패널로 조립하여, 지오데식 돔의 외벽을 시공하는 단계; (e) 상기 타워를 지오데식 돔의 전체적인 외관이 형성되는 최고 높이까지 단계적으로 상승시키며 상기 (c)단계 내지 상기 (d) 단계를 반복 실시하여, 지오데식 돔의 외벽을 시공하는 단계; (f) 상기 타워의 상단부가 상기 최고 높이에 도달하면, 지오데식 돔에 복수의 패널을 조립하여 지오데식 돔의 잔여 외벽을 시공하는 단계; (g) 지오데식 돔의 중앙 천정부와 상기 타워의 상단부를 분리하는 단계; 및 (h) 상기 타워를 해체하는 단계;를 포함하는 것을 특징으로 한다.
GEODESIC DOME CONSTRUCTION METHOD
지오데식 돔의 시공방법
KANG KYOUNG OH (author)
2019-03-04
Patent
Electronic Resource
Korean
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Hub connector of geodesic dome structure and geodesic dome structure
European Patent Office | 2018
Hub connector of geodesic dome structure and geodesic dome structure
European Patent Office | 2018
|Panel supporting device of geodesic dome structure and geodesic dome structure
European Patent Office | 2018
|