A platform for research: civil engineering, architecture and urbanism
Thrust pile with prestress and self-supporting type pile construction using it
The present invention provides an H-pile applied with prestress and a construction method for a self-supporting type temporary retaining wall by using the same. A bracket is installed in an H-pile of a retaining wall, and a steel rod or a steel wire is installed in the bracket. A prestress beam self-supporting construction method is applied to the H-pile applied with the prestress and supports earth pressure by applying tension to the steel rod or the steel wire. A wide work space is obtained as the installing number of spread beams is remarkably reduced. So, the H-pile applied with the prestress can reduce a usage amount of steel materials and construction periods due to increase of efficiency of a machine work. Therefore, the H-pile can reduce construction costs and can improve workability. To achieve the purpose of the present invention, the H-pile applied with the prestress comprises: an H-pile formed as an H-beam with a predetermined length; a bracket bolted to a predetermined position of the H-pile to face each other; and a tension member vertically fixed between the brackets. Also, the construction method for a self-supporting type temporary retaining wall by using an H-pile applied with the prestress, to achieve the purpose, comprises: a step (S1) of manufacturing the H-pile (P) applied with the prestress; a step (S2) of forming a boring hole (H) by boring the ground (G) at a predetermined depth and in a predetermined diameter at fixed intervals; a step (S3) of driving and embedding the H-pile (P) applied with the prestress into the boring hole (H); a step (S4) of filling the H-pile (100) bored and embedded with sand; a step (S5) of tensioning the tension member installed in the H-pile; and a step (S6) of installing an earth-retaining plate and excavating the front surface of the H-pile (100) at same time.
본 발명은 흙막이 엄지말뚝에 브라켓을 설치하고, 상기 브라켓에 강봉 또는 강선을 설치하여, 상기 강봉 또는 강선에 긴장력을 가하여 토압을 지지하는 프리스트레스 빔 자립공법을 도입함으로써, 버팀보 설치 개수를 대폭 줄임으로써 넓은 작업공간을 확보하여 장비작업의 효율성 증가로 인한 공사기간의 단축 및 강재의 사용량이 감소되어 공사비 절감 및 시공성 향상을 도모하도록 한 프리스트레스가 도입된 엄지말뚝과 이를 이용한 자립식 가설 흙막이 시공방법을 제공하는데 그 목적이 있다. 상기한 목적을 달성하기 위한 프리스트레스가 도입된 엄지말뚝은 일정한 길이를 갖는 H빔으로 이루어진 엄지말뚝과; 상기 엄지말뚝의 소정의 위치에 상호 대향되게 볼팅 결합되는 브라켓과; 상기 브라켓 간에 수직으로 고정 설치되는 인장재로 구성됨을 특징으로 한다. 또한, 상기한 목적을 달성하기 위한 프리스트레스가 도입된 엄지말뚝을 이용한 자립식 가설 흙막이 시공방법은 프리스트레스가 도입된 엄지말뚝(P)을 제작하는 단계(S 1); 지반(G)에 일정한 간격을 두고, 소정의 직경 및 깊이로 천공하여 천공홀(H)을 형성하는 단계(S 2); 상기 천공홀(H)에 프리스트레스가 도입된 엄지말뚝(P)을 항타 근입하는 단계(S 3); 상기 항타 근입된 엄지말뚝(100)에 모래를 충전하는 단계(S 4); 상기 엄지말뚝에 설치된 인장재를 인장하는 단계(S 5); 상기 엄지말뚝(100)의 전면부를 굴착 진행함과 동시에 토류판을 설치하는 단계(S 6)로 이루어짐을 특징으로 한다.
Thrust pile with prestress and self-supporting type pile construction using it
The present invention provides an H-pile applied with prestress and a construction method for a self-supporting type temporary retaining wall by using the same. A bracket is installed in an H-pile of a retaining wall, and a steel rod or a steel wire is installed in the bracket. A prestress beam self-supporting construction method is applied to the H-pile applied with the prestress and supports earth pressure by applying tension to the steel rod or the steel wire. A wide work space is obtained as the installing number of spread beams is remarkably reduced. So, the H-pile applied with the prestress can reduce a usage amount of steel materials and construction periods due to increase of efficiency of a machine work. Therefore, the H-pile can reduce construction costs and can improve workability. To achieve the purpose of the present invention, the H-pile applied with the prestress comprises: an H-pile formed as an H-beam with a predetermined length; a bracket bolted to a predetermined position of the H-pile to face each other; and a tension member vertically fixed between the brackets. Also, the construction method for a self-supporting type temporary retaining wall by using an H-pile applied with the prestress, to achieve the purpose, comprises: a step (S1) of manufacturing the H-pile (P) applied with the prestress; a step (S2) of forming a boring hole (H) by boring the ground (G) at a predetermined depth and in a predetermined diameter at fixed intervals; a step (S3) of driving and embedding the H-pile (P) applied with the prestress into the boring hole (H); a step (S4) of filling the H-pile (100) bored and embedded with sand; a step (S5) of tensioning the tension member installed in the H-pile; and a step (S6) of installing an earth-retaining plate and excavating the front surface of the H-pile (100) at same time.
본 발명은 흙막이 엄지말뚝에 브라켓을 설치하고, 상기 브라켓에 강봉 또는 강선을 설치하여, 상기 강봉 또는 강선에 긴장력을 가하여 토압을 지지하는 프리스트레스 빔 자립공법을 도입함으로써, 버팀보 설치 개수를 대폭 줄임으로써 넓은 작업공간을 확보하여 장비작업의 효율성 증가로 인한 공사기간의 단축 및 강재의 사용량이 감소되어 공사비 절감 및 시공성 향상을 도모하도록 한 프리스트레스가 도입된 엄지말뚝과 이를 이용한 자립식 가설 흙막이 시공방법을 제공하는데 그 목적이 있다. 상기한 목적을 달성하기 위한 프리스트레스가 도입된 엄지말뚝은 일정한 길이를 갖는 H빔으로 이루어진 엄지말뚝과; 상기 엄지말뚝의 소정의 위치에 상호 대향되게 볼팅 결합되는 브라켓과; 상기 브라켓 간에 수직으로 고정 설치되는 인장재로 구성됨을 특징으로 한다. 또한, 상기한 목적을 달성하기 위한 프리스트레스가 도입된 엄지말뚝을 이용한 자립식 가설 흙막이 시공방법은 프리스트레스가 도입된 엄지말뚝(P)을 제작하는 단계(S 1); 지반(G)에 일정한 간격을 두고, 소정의 직경 및 깊이로 천공하여 천공홀(H)을 형성하는 단계(S 2); 상기 천공홀(H)에 프리스트레스가 도입된 엄지말뚝(P)을 항타 근입하는 단계(S 3); 상기 항타 근입된 엄지말뚝(100)에 모래를 충전하는 단계(S 4); 상기 엄지말뚝에 설치된 인장재를 인장하는 단계(S 5); 상기 엄지말뚝(100)의 전면부를 굴착 진행함과 동시에 토류판을 설치하는 단계(S 6)로 이루어짐을 특징으로 한다.
Thrust pile with prestress and self-supporting type pile construction using it
프리스트레스가 도입된 엄지말뚝과 이를 이용한 자립식 가설 흙막이 시공방법
OH YONG HWAN (author)
2019-04-05
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Thrust pile with prestress and self-supporting type pile construction using it
European Patent Office | 2020
|Thrust pile with prestress and self-supporting type pile construction using it
European Patent Office | 2022
Thrust pile with prestress and self-supporting type pile construction using it
European Patent Office | 2021
|Thrust pile with prestress and self-supporting type pile construction using it
European Patent Office | 2022
|Thrust pile with prestress and self-supporting type pile construction using it
European Patent Office | 2022