A platform for research: civil engineering, architecture and urbanism
Self reliance earth retaining construction method having prestress introduced of Double I Beam
The present invention relates to a self-reliance earth retaining construction method, and more particular, to a self-reliance earth retaining construction method for applying compression stress to a double I-beam, which applies compression stress to an H-pile formed as a double I-beam, thereby effectively suppressing the displacement of the ground behind earth retaining by the increased rigidity thereof and reducing the construction period and improving economic efficiency with no need for a support material. A self-reliance earth retaining construction method for applying compression stress to a double I-beam, according to an appropriate embodiment of the present invention, comprises the steps of: boring holes to a required depth at intervals to embed, at predetermined intervals, H-piles in the ground for which earth retaining is required; respectively embedding the H-piles, each having a tendon for fixing a lower end thereof, in the holes bored in a row; filling the holes, in which the H-piles are embedded, with soil or sand; primarily excavating the ground on a front side of the H-piles to install a wale and tension the tendon; installing the wale on an upper end of the H-pile on an excavation side, passing an upper end of the tendon through the wale, and tensioning the tendon to be seated on the wale, applying compression stress to the H-pile; and excavating the ground to a required excavation depth while installing earth plates between the H-piles installed in the row.
본 발명은 자립식 흙막이 공법에 관한 것으로, 특히 더블 아이 빔으로 구성된 엄지말뚝에 압축응력이 도입되도록 하여 증가된 강성에 의해 흙막이 배면지반의 변위를 효과적으로 억제시킬 수 있고, 지보재의 불필요로 공기의 단축과 경제성이 우수한 더블 아이 빔에 압축응력이 도입된 자립식 흙막이 공법에 관한 것이다. 본 발명의 적절한 일 실시 형태에 의한 더블 아이 빔에 압축응력이 도입된 자립식 흙막이 공법은, 흙막이가 필요한 지반에 엄지말뚝을 일정 간격마다 근입하기 위해 해당 간격마다 필요 깊이까지 천공하는 단계와; 하단을 고정시킨 긴장재가 배치된 엄지말뚝을 지반에 1열로 천공된 천공홀에 각기 근입하는 단계와; 엄지말뚝이 근입된 천공홀에 토사 또는 모래를 채움하는 단계와; 띠장의 설치와 긴장재의 인장을 위해 엄지말뚝의 전면측 지반에 1단계 굴착을 실시하는 단계와; 엄지말뚝의 상단에 굴착측에서 띠장을 지지되게 설치하고, 긴장재의 상단을 띠장에 통과시킨 후 긴장재를 인장하여 띠장에 정착시켜서 엄지말뚝에 압축응력을 도입시켜 놓는 단계와; 토류판을 1열로 설치된 엄지말뚝의 사이에 설치해가면서 지반에 소요 굴착심도까지 굴착하는 단계;를 포함하여 시공되는 것을 특징으로 한다.
Self reliance earth retaining construction method having prestress introduced of Double I Beam
The present invention relates to a self-reliance earth retaining construction method, and more particular, to a self-reliance earth retaining construction method for applying compression stress to a double I-beam, which applies compression stress to an H-pile formed as a double I-beam, thereby effectively suppressing the displacement of the ground behind earth retaining by the increased rigidity thereof and reducing the construction period and improving economic efficiency with no need for a support material. A self-reliance earth retaining construction method for applying compression stress to a double I-beam, according to an appropriate embodiment of the present invention, comprises the steps of: boring holes to a required depth at intervals to embed, at predetermined intervals, H-piles in the ground for which earth retaining is required; respectively embedding the H-piles, each having a tendon for fixing a lower end thereof, in the holes bored in a row; filling the holes, in which the H-piles are embedded, with soil or sand; primarily excavating the ground on a front side of the H-piles to install a wale and tension the tendon; installing the wale on an upper end of the H-pile on an excavation side, passing an upper end of the tendon through the wale, and tensioning the tendon to be seated on the wale, applying compression stress to the H-pile; and excavating the ground to a required excavation depth while installing earth plates between the H-piles installed in the row.
본 발명은 자립식 흙막이 공법에 관한 것으로, 특히 더블 아이 빔으로 구성된 엄지말뚝에 압축응력이 도입되도록 하여 증가된 강성에 의해 흙막이 배면지반의 변위를 효과적으로 억제시킬 수 있고, 지보재의 불필요로 공기의 단축과 경제성이 우수한 더블 아이 빔에 압축응력이 도입된 자립식 흙막이 공법에 관한 것이다. 본 발명의 적절한 일 실시 형태에 의한 더블 아이 빔에 압축응력이 도입된 자립식 흙막이 공법은, 흙막이가 필요한 지반에 엄지말뚝을 일정 간격마다 근입하기 위해 해당 간격마다 필요 깊이까지 천공하는 단계와; 하단을 고정시킨 긴장재가 배치된 엄지말뚝을 지반에 1열로 천공된 천공홀에 각기 근입하는 단계와; 엄지말뚝이 근입된 천공홀에 토사 또는 모래를 채움하는 단계와; 띠장의 설치와 긴장재의 인장을 위해 엄지말뚝의 전면측 지반에 1단계 굴착을 실시하는 단계와; 엄지말뚝의 상단에 굴착측에서 띠장을 지지되게 설치하고, 긴장재의 상단을 띠장에 통과시킨 후 긴장재를 인장하여 띠장에 정착시켜서 엄지말뚝에 압축응력을 도입시켜 놓는 단계와; 토류판을 1열로 설치된 엄지말뚝의 사이에 설치해가면서 지반에 소요 굴착심도까지 굴착하는 단계;를 포함하여 시공되는 것을 특징으로 한다.
Self reliance earth retaining construction method having prestress introduced of Double I Beam
더블 아이 빔에 압축응력이 도입된 자립식 흙막이 공법
BAEK JIN MYUNG (author) / LEE JONG BEOM (author)
2019-05-16
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Self reliance earth retaining construction method having prestress introduced of Double I Beam
European Patent Office | 2020
EARTH RETAINING SELF-RELIANCE STRUCTURE AND EARTH RETAINING CONSTRUCTION METHOD USING IT
European Patent Office | 2017
|DOUBLE PILE SELF-RELIANCE RETAINING WALL CONSTRUCTION METHOD
European Patent Office | 2022
DOUBLE PILE SELF-RELIANCE RETAINING WALL CONSTRUCTION METHOD
European Patent Office | 2022
|Integral prestress reinforced earth retaining wall construction method
European Patent Office | 2015
|