A platform for research: civil engineering, architecture and urbanism
Construction apparatus of stepped pile and Construction method of stepped pile
The present invention relates to a stepped pile construction apparatus and a stepped pile construction method. The stepped pile construction apparatus comprises: a rod having a rod shape, a hollow space formed therein to move a solidifying agent, and a first spray hole being arranged on a lower portion thereof and communicating with the hollow space; an excavation unit which is coupled to a lower portion of the rod, and can excavate the ground by rotation; an auger screw helically coupled to a side of the rod above the excavation unit; and a wing unit including an agitation shaft protruding from a side of the rod, and an agitation wing arranged on an end of the agitation shaft. A continuous unit having one or more of the wing units with the same length of the agitation shaft is formed. A plurality of the continuous units are formed along the rod from an upper portion of the rod to a lower portion of the rod. The length of the agitation shaft arranged on a plurality of the continuous units becomes smaller from an upper portion of the rod toward a lower portion of the rod. The stepped pile construction method comprises a drilling step, a solidifying agent injection step, an excavation soil-solidifying agent agitation step, and a pile forming step.
본 발명은 계단형 말뚝 시공장치 및 계단형 말뚝 시공방법에 관한 것으로, 계단형 말뚝 시공장치는, 봉형상으로 이루어지며, 내부에 고화제가 이동할 수 있는 중공부가 형성되어 있고, 하부에 상기 중공부와 연통되어 있는 제1분사공이 마련되어 있는 로드; 상기 로드의 하부에 결합되며, 회전에 의해 지반을 굴착할 수 있는 굴착부; 및 상기 굴착부 상부에서 상기 로드 측면에 나선 형태로 결합되는 오거 스크류; 상기 로드 측면에서부터 돌출되는 교반축과, 상기 교반축 끝단에 마련되는 교반 날개를 포함하여 이루어진 날개부;를 포함하며, 상기 교반축의 길이가 동일한 1개 이상의 상기 날개부가 구비된 연속부가 형성되되, 상기 연속부는 상기 로드의 상부에서 하부로 가면서 상기 로드를 따라 복수 개가 형성되며, 복수 개의 상기 연속부에 구비된 상기 교반축의 길이는 상기 로드의 상부에서부터 하부로 갈수록 작아지는 것을 특징으로 하며, 계단형 말뚝 시공방법은 천공 단계, 고화제 주입 단계, 굴착토사-고화제 교반 단계, 말뚝 형성 단계를 포함하는 것을 특징으로 하는 것이다.
Construction apparatus of stepped pile and Construction method of stepped pile
The present invention relates to a stepped pile construction apparatus and a stepped pile construction method. The stepped pile construction apparatus comprises: a rod having a rod shape, a hollow space formed therein to move a solidifying agent, and a first spray hole being arranged on a lower portion thereof and communicating with the hollow space; an excavation unit which is coupled to a lower portion of the rod, and can excavate the ground by rotation; an auger screw helically coupled to a side of the rod above the excavation unit; and a wing unit including an agitation shaft protruding from a side of the rod, and an agitation wing arranged on an end of the agitation shaft. A continuous unit having one or more of the wing units with the same length of the agitation shaft is formed. A plurality of the continuous units are formed along the rod from an upper portion of the rod to a lower portion of the rod. The length of the agitation shaft arranged on a plurality of the continuous units becomes smaller from an upper portion of the rod toward a lower portion of the rod. The stepped pile construction method comprises a drilling step, a solidifying agent injection step, an excavation soil-solidifying agent agitation step, and a pile forming step.
본 발명은 계단형 말뚝 시공장치 및 계단형 말뚝 시공방법에 관한 것으로, 계단형 말뚝 시공장치는, 봉형상으로 이루어지며, 내부에 고화제가 이동할 수 있는 중공부가 형성되어 있고, 하부에 상기 중공부와 연통되어 있는 제1분사공이 마련되어 있는 로드; 상기 로드의 하부에 결합되며, 회전에 의해 지반을 굴착할 수 있는 굴착부; 및 상기 굴착부 상부에서 상기 로드 측면에 나선 형태로 결합되는 오거 스크류; 상기 로드 측면에서부터 돌출되는 교반축과, 상기 교반축 끝단에 마련되는 교반 날개를 포함하여 이루어진 날개부;를 포함하며, 상기 교반축의 길이가 동일한 1개 이상의 상기 날개부가 구비된 연속부가 형성되되, 상기 연속부는 상기 로드의 상부에서 하부로 가면서 상기 로드를 따라 복수 개가 형성되며, 복수 개의 상기 연속부에 구비된 상기 교반축의 길이는 상기 로드의 상부에서부터 하부로 갈수록 작아지는 것을 특징으로 하며, 계단형 말뚝 시공방법은 천공 단계, 고화제 주입 단계, 굴착토사-고화제 교반 단계, 말뚝 형성 단계를 포함하는 것을 특징으로 하는 것이다.
Construction apparatus of stepped pile and Construction method of stepped pile
계단형 말뚝 시공장치 및 계단형 말뚝 시공방법
PAIK YE JI (author) / PAIK KI WON (author)
2020-08-10
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction apparatus of stepped pile and Construction method of stepped pile
European Patent Office | 2021
Stepped cast-in-place pile and construction method thereof
European Patent Office | 2023
|European Patent Office | 2023
|Construction method for stepped plate of stepped auditorium
European Patent Office | 2024
|Estimation of Settlement of Stepped Pile in Granular Soil
Springer Verlag | 2021
|