A platform for research: civil engineering, architecture and urbanism
The present invention provides a construction method of a concrete drain pipe which can reduce construction costs. The construction method of a concrete drain pipe comprises: a first step of manufacturing side plates, an upper plate, and a bottom plate divided into both wing plates and a fixing plate for forming a drain pipe mounted on a conduit by concrete deposition; a second step of installing a leading body on one side of the conduit, wherein both surfaces of the leading body are opened, and the leading body has hydraulic cylinders on an upper, a lower, a left, and a right side thereof and is made of a steel plate; a third step of installing both side plates manufactured by the first step on one end of the leading body; a fourth step of installing the upper plate on the upper side of both side plates; a fifth step of installing both wing plates on both sides of the lower end of both side plates; a sixth step of installing the fixing plate between both wing plates, and forming a tetrahedron of which both sides are opened; a seventh step of sealing connections of each of the plates; and an eighth step of pushing the concrete drain pipe with a finished tetrahedron by the hydraulic cylinders to separate the concrete drain pipe from the leading body.
본 발명은, 콘크리트 배수관의 시공방법 본 발명은, 관로에 장착되는 배수관을 형성하기 위한 측판, 상판 및 양 날개판과 고정판으로 분리 구성된 바닥판을 콘크리트 타설에 의해 제조하는 제1 단계; 관로의 한쪽에 설치되며 양면이 개방되고 상하, 좌우측에 유압 실린더를 갖춘 철판으로 제작된 선도체를 설치하는 제2 단계; 상기 선도체의 한쪽 끝에 상기 제1 단계에 의해 제작된 양 측판을 설치하는 제3 단계; 상기 양 측판의 상측에 상판을 설치하는 제4 단계; 상기 양 측판의 하단부 양측에 양 날개판을 설치하는 제5 단계; 상기 양 날개판의 사이에 고정판을 설치하며 양측이 개방된 사면체를 형성하는 제6 단계; 각각의 상기 판체들의 연결부를 실링하는 제7 단계; 및 사면체가 완성된 상기 콘크리트 배수관을 유압실린더로 밀어 상기 선도체로부터 분리하는 제8 단계로 이루어지는 것을 특징으로 한다.
The present invention provides a construction method of a concrete drain pipe which can reduce construction costs. The construction method of a concrete drain pipe comprises: a first step of manufacturing side plates, an upper plate, and a bottom plate divided into both wing plates and a fixing plate for forming a drain pipe mounted on a conduit by concrete deposition; a second step of installing a leading body on one side of the conduit, wherein both surfaces of the leading body are opened, and the leading body has hydraulic cylinders on an upper, a lower, a left, and a right side thereof and is made of a steel plate; a third step of installing both side plates manufactured by the first step on one end of the leading body; a fourth step of installing the upper plate on the upper side of both side plates; a fifth step of installing both wing plates on both sides of the lower end of both side plates; a sixth step of installing the fixing plate between both wing plates, and forming a tetrahedron of which both sides are opened; a seventh step of sealing connections of each of the plates; and an eighth step of pushing the concrete drain pipe with a finished tetrahedron by the hydraulic cylinders to separate the concrete drain pipe from the leading body.
본 발명은, 콘크리트 배수관의 시공방법 본 발명은, 관로에 장착되는 배수관을 형성하기 위한 측판, 상판 및 양 날개판과 고정판으로 분리 구성된 바닥판을 콘크리트 타설에 의해 제조하는 제1 단계; 관로의 한쪽에 설치되며 양면이 개방되고 상하, 좌우측에 유압 실린더를 갖춘 철판으로 제작된 선도체를 설치하는 제2 단계; 상기 선도체의 한쪽 끝에 상기 제1 단계에 의해 제작된 양 측판을 설치하는 제3 단계; 상기 양 측판의 상측에 상판을 설치하는 제4 단계; 상기 양 측판의 하단부 양측에 양 날개판을 설치하는 제5 단계; 상기 양 날개판의 사이에 고정판을 설치하며 양측이 개방된 사면체를 형성하는 제6 단계; 각각의 상기 판체들의 연결부를 실링하는 제7 단계; 및 사면체가 완성된 상기 콘크리트 배수관을 유압실린더로 밀어 상기 선도체로부터 분리하는 제8 단계로 이루어지는 것을 특징으로 한다.
construction plan of a concrete conduit
콘크리트 배수관의 시공방법
KIM JEONG PIL (author)
2021-02-03
Patent
Electronic Resource
Korean
IPC:
E03F
SEWERS
,
Abwasserkanäle
Engineering Index Backfile | 1897
|Underground conduit construction
Engineering Index Backfile | 1945
|Underground conduit construction
Engineering Index Backfile | 1911
|Underground conduit construction
Engineering Index Backfile | 1914
|