Pavement block reinforcement method using asphalt pavement
The present invention relates to a side walk and road block reinforcement method using asphalt pavement, which removes a portion of asphalt pavement, sequentially laminates sand and blocks on a place where the portion is removed, and enables a reinforcement plate to be installed on an asphalt surface to restrain sagging due to ductility of asphalt, thereby restraining sagging of the block and reducing a construction period and construction costs since there is no need to remove entire of the asphalt and repeat construction of a base layer. To this end, the present invention removes the portion of an asphalt pavement unit as much as the block and a sand layer are going to be laminated, enables non-woven fabric on a remaining surface of the asphalt pavement unit, enables the multiple reinforcement plates on the surface of the non-woven fabric at a constant interval, and spreads the sand at predetermined height to cover the reinforcement plate and the non-woven fabric to form the sand layer and enable the block to be installed on the surface of the sand layer.
본 발명은 아스팔트 포장의 일부를 걷어내고 그 자리에 모래와 블록을 순차적으로 적층하되 아스팔트의 연성으로 인한 처짐을 억제하기 위하여 아스팔트 표면에 보강판을 설치함으로써, 블록의 처짐이 억제되고 또한 아스팔트를 전부 걷어내고 기초층 공사를 다시할 필요가 없으므로 공사기간 및 비용이 절감되는 아스팔트 포장을 이용한 보차도블록 보강공법에 관한 것이다. 이를 위하여 본 발명은 블록 및 모래층이 적층 될 높이만큼 아스팔트 포장부의 일부를 걷어내고; 상기 남겨진 아스팔트 포장부의 표면에 부직포를 설치하며; 상기 부직포 표면에 등 간격으로 다수의 보강판을 설치하고; 상기 보강판 및 부직포가 덮이도록 모래를 일정 높이 깔아서 모래층을 형성한 뒤 상기 모래층의 표면에 상기 블록을 설치하는 특징이 있다.
Pavement block reinforcement method using asphalt pavement
The present invention relates to a side walk and road block reinforcement method using asphalt pavement, which removes a portion of asphalt pavement, sequentially laminates sand and blocks on a place where the portion is removed, and enables a reinforcement plate to be installed on an asphalt surface to restrain sagging due to ductility of asphalt, thereby restraining sagging of the block and reducing a construction period and construction costs since there is no need to remove entire of the asphalt and repeat construction of a base layer. To this end, the present invention removes the portion of an asphalt pavement unit as much as the block and a sand layer are going to be laminated, enables non-woven fabric on a remaining surface of the asphalt pavement unit, enables the multiple reinforcement plates on the surface of the non-woven fabric at a constant interval, and spreads the sand at predetermined height to cover the reinforcement plate and the non-woven fabric to form the sand layer and enable the block to be installed on the surface of the sand layer.
본 발명은 아스팔트 포장의 일부를 걷어내고 그 자리에 모래와 블록을 순차적으로 적층하되 아스팔트의 연성으로 인한 처짐을 억제하기 위하여 아스팔트 표면에 보강판을 설치함으로써, 블록의 처짐이 억제되고 또한 아스팔트를 전부 걷어내고 기초층 공사를 다시할 필요가 없으므로 공사기간 및 비용이 절감되는 아스팔트 포장을 이용한 보차도블록 보강공법에 관한 것이다. 이를 위하여 본 발명은 블록 및 모래층이 적층 될 높이만큼 아스팔트 포장부의 일부를 걷어내고; 상기 남겨진 아스팔트 포장부의 표면에 부직포를 설치하며; 상기 부직포 표면에 등 간격으로 다수의 보강판을 설치하고; 상기 보강판 및 부직포가 덮이도록 모래를 일정 높이 깔아서 모래층을 형성한 뒤 상기 모래층의 표면에 상기 블록을 설치하는 특징이 있다.
Pavement block reinforcement method using asphalt pavement
아스팔트 포장을 이용한 보차도블록 보강공법
BACK WON OK (author)
2021-05-03
Patent
Electronic Resource
Korean
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
BLOCK PAVEMENT METHOD, BLOCK PAVEMENT STRUCTURE, AND BLOCK PAVEMENT REINFORCEMENT PLATE