A conventional underground structure demolition method requires a long construction period and excessive costs to make demolition very difficult. The present invention complements the conventional demolition method and provides a method for safely tearing down a wall without a structural problem in a wall demolition method of a decrepit building. A conventional method uses a wale and a strut in a wall to descend while tearing down the interior (miscellaneous materials and others). The method removes a foundation or drills the position of a PRD, a corner pile, and a middle pile in advance by surveying. The method removes the wale and the strut and backfills while ascending. The present invention generally uses structural calculation, a verified earth retaining method, and a beam and a steel pipe strut (1,000m/m) to tear down a wall in steps of 2-3m from the ground and then install a wale and a strut and descend. The method simultaneously tears down the wall and the interior. The ground of a retaining wall is transferred when inserting a retaining plate into a newly installed retaining wall to mount an existing wall to be torn down (advantage) and install the wale and the strut on the wall. The strut is installed on each floor and then on a lower floor. The foundation is removed by using a wheel saw, a core, and a buster. A middle pile and a corner pile are installed up to the bottom by using 300×200 beams. A penetration depth (diameter of 5m) is driven downwards (a core and a small drill) by a micropile (diameter of 21.5cm) underneath the foundation.
기존의 지하구조물 철거방법은 공사기간이 길고 투입비가 과다 발생하여 철거에 어려움이 많았다. 본 발명은 이를 보완하여 노후 건축물의 벽체 철거 공법에서 구조적으로 문제없이 안전하게 철거 할 수 있는 방법이다. 기존방식은 벽체 내부에 띠장과 스트러트를 이용해서 슬래브. 내부철거 (잡자재 및 기타) 를 하면서 내려가는 공법이다. 측량하여 미리 중앙파일, 코너파일, PRD 위치를 뚫어 놓거나 기초를 제거하는 공법으로 올라가면서 띠장 및 스트러트를 제거하고 되메우기하는 공법이다. 본 발명은 일반적으로 구조계산 및 증명된 흙막이 공법과 빔, 강관스트러트 (1,000m/m)를 활용하여 지상에서부터 2~3M을 단계적으로 벽체 철거 후 띠장 및 스트러트를 설치하고 내려가는 공법이며, 벽체 및 내부 철거를 동시에 해체하는 공법이다. 신설된 토류벽에 토류판을 낄 때 토류벽체 지반이 이관되어, 기존 철거할 벽체는 안착되고(장점) 벽면 벽체에 띠장 및 스트러트를 설치한다. 각 층마다 스트러트를 설치하면서 내려가고 기초는 휠쏘, 코어, 버스타를 이용하여 제거한다. 중앙파일, 코너파일을 바닥까지 300×200 빔을 이용하여 설치하고, 기초 밑에는 마이크로파일(지름 21.5CM)로 근 입장(지름 5M)을 이어내린다.(코어 및 소형드릴)
A conventional underground structure demolition method requires a long construction period and excessive costs to make demolition very difficult. The present invention complements the conventional demolition method and provides a method for safely tearing down a wall without a structural problem in a wall demolition method of a decrepit building. A conventional method uses a wale and a strut in a wall to descend while tearing down the interior (miscellaneous materials and others). The method removes a foundation or drills the position of a PRD, a corner pile, and a middle pile in advance by surveying. The method removes the wale and the strut and backfills while ascending. The present invention generally uses structural calculation, a verified earth retaining method, and a beam and a steel pipe strut (1,000m/m) to tear down a wall in steps of 2-3m from the ground and then install a wale and a strut and descend. The method simultaneously tears down the wall and the interior. The ground of a retaining wall is transferred when inserting a retaining plate into a newly installed retaining wall to mount an existing wall to be torn down (advantage) and install the wale and the strut on the wall. The strut is installed on each floor and then on a lower floor. The foundation is removed by using a wheel saw, a core, and a buster. A middle pile and a corner pile are installed up to the bottom by using 300×200 beams. A penetration depth (diameter of 5m) is driven downwards (a core and a small drill) by a micropile (diameter of 21.5cm) underneath the foundation.
기존의 지하구조물 철거방법은 공사기간이 길고 투입비가 과다 발생하여 철거에 어려움이 많았다. 본 발명은 이를 보완하여 노후 건축물의 벽체 철거 공법에서 구조적으로 문제없이 안전하게 철거 할 수 있는 방법이다. 기존방식은 벽체 내부에 띠장과 스트러트를 이용해서 슬래브. 내부철거 (잡자재 및 기타) 를 하면서 내려가는 공법이다. 측량하여 미리 중앙파일, 코너파일, PRD 위치를 뚫어 놓거나 기초를 제거하는 공법으로 올라가면서 띠장 및 스트러트를 제거하고 되메우기하는 공법이다. 본 발명은 일반적으로 구조계산 및 증명된 흙막이 공법과 빔, 강관스트러트 (1,000m/m)를 활용하여 지상에서부터 2~3M을 단계적으로 벽체 철거 후 띠장 및 스트러트를 설치하고 내려가는 공법이며, 벽체 및 내부 철거를 동시에 해체하는 공법이다. 신설된 토류벽에 토류판을 낄 때 토류벽체 지반이 이관되어, 기존 철거할 벽체는 안착되고(장점) 벽면 벽체에 띠장 및 스트러트를 설치한다. 각 층마다 스트러트를 설치하면서 내려가고 기초는 휠쏘, 코어, 버스타를 이용하여 제거한다. 중앙파일, 코너파일을 바닥까지 300×200 빔을 이용하여 설치하고, 기초 밑에는 마이크로파일(지름 21.5CM)로 근 입장(지름 5M)을 이어내린다.(코어 및 소형드릴)
BATCH DOWN WALL DEMOLITION METHOD
일괄 내림식 벽체철거공법
PARK CHA SUN (author)
2021-05-10
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Supporting beam wall demolition device and supporting beam wall demolition construction method
European Patent Office | 2015
|