A platform for research: civil engineering, architecture and urbanism
METHOD FOR REPAIRING BRIDGE AS SEMIINTEGRAL ABUTMENT BRIDGE
The present invention relates to a semi-integration construction method for a bridge with a jammed abutment. According to the present invention, the method includes the following steps of: removing an existing expansion joint while removing an upper part of a longitudinal end of a slab jammed with an abutment, an upper part of a breast wall of the abutment, and a longitudinal end of a connection slab, from an existing slab bridge; securing a laying gap between a side of the breast wall of the abutment and a longitudinal end surface of the bridge slab by cutting the longitudinal end of the bridge slab jammed with a side of the breast wall of the abutment or having a narrower gap, by a set length; installing a sliding member on the floor of a removed space of the upper part of the breast wall of the abutment; connecting and placing a main rebar exposed to a removed space of the bridge slab and a main rebar exposed to a removed space of the connection slab with a connection rebar in order to place connection parts in the removed space of the slab, the removed space of the breast wall of the abutment, and the removed space of the connection slab; installing an expansion controller at the other longitudinal end of the connection slab; and forming a semi-integrated connection part by placing concrete in the removed space of the slab, the removed space of the breast wall of the abutment, and the removed space of the connection slab. According to the present invention, the semi-integration construction method is capable of securing an expansion gap between an abutment and a jammed upper structure of an existing bridge having a jammed abutment as well as removing and semi-integrating an existing expansion joint.
본 발명은 교대협착 교량 반일체화 시공방법에 관한 것으로, 본 발명은 기존 슬래브 교량에서, 교대와 협착된 슬래브의 길이방향 단부의 상부, 교대 흉벽의 상부, 접속슬래브의 길이 방향 단부를 각각 제거하면서 기존 신축이음장치를 제거하는 단계; 상기 교대 흉벽의 측면과 협착되거나 간격이 좁아진 교량 슬래브의 길이방향 단부를 설정된 길이로 절단하여 상기 교량 슬래브의 길이방향 끝면과 교대 흉벽의 측면 사이에 유간을 확보하는 단계; 상기 교대 흉벽 상부의 제거된 공간 바닥에 슬라이딩부재를 설치하는 단계; 상기 슬래브의 제거된 공간, 교대 흉벽의 제거된 공간, 그리고 접속슬래브의 제거된 공간에 연결부를 타설하기 위하여 상기 교량 슬래브의 제거된 공간으로 노출된 주철근과 상기 접속슬래브의 제거된 공간으로 노출된 주철근을 연결철근으로 연결하여 배근하는 단계; 상기 접속슬래브의 길이방향 다른 한쪽 끝단에 신축조절장치를 설치하는 단계; 상기 슬래브의 제거된 공간, 교대 흉벽의 제거된 공간, 그리고 접속슬래브의 제거된 공간에 콘크리트를 타설하여 반일체화 연결부를 형성하는 단계를 포함한다. 본 발명에 따르면, 교량 상부구조와 교대가 협착된 기존 교량에서 협착된 상부구조와 교대의 신축유간을 확보함과 아울러 기존 신축이음장치를 제거하고 반일체화한다.
METHOD FOR REPAIRING BRIDGE AS SEMIINTEGRAL ABUTMENT BRIDGE
The present invention relates to a semi-integration construction method for a bridge with a jammed abutment. According to the present invention, the method includes the following steps of: removing an existing expansion joint while removing an upper part of a longitudinal end of a slab jammed with an abutment, an upper part of a breast wall of the abutment, and a longitudinal end of a connection slab, from an existing slab bridge; securing a laying gap between a side of the breast wall of the abutment and a longitudinal end surface of the bridge slab by cutting the longitudinal end of the bridge slab jammed with a side of the breast wall of the abutment or having a narrower gap, by a set length; installing a sliding member on the floor of a removed space of the upper part of the breast wall of the abutment; connecting and placing a main rebar exposed to a removed space of the bridge slab and a main rebar exposed to a removed space of the connection slab with a connection rebar in order to place connection parts in the removed space of the slab, the removed space of the breast wall of the abutment, and the removed space of the connection slab; installing an expansion controller at the other longitudinal end of the connection slab; and forming a semi-integrated connection part by placing concrete in the removed space of the slab, the removed space of the breast wall of the abutment, and the removed space of the connection slab. According to the present invention, the semi-integration construction method is capable of securing an expansion gap between an abutment and a jammed upper structure of an existing bridge having a jammed abutment as well as removing and semi-integrating an existing expansion joint.
본 발명은 교대협착 교량 반일체화 시공방법에 관한 것으로, 본 발명은 기존 슬래브 교량에서, 교대와 협착된 슬래브의 길이방향 단부의 상부, 교대 흉벽의 상부, 접속슬래브의 길이 방향 단부를 각각 제거하면서 기존 신축이음장치를 제거하는 단계; 상기 교대 흉벽의 측면과 협착되거나 간격이 좁아진 교량 슬래브의 길이방향 단부를 설정된 길이로 절단하여 상기 교량 슬래브의 길이방향 끝면과 교대 흉벽의 측면 사이에 유간을 확보하는 단계; 상기 교대 흉벽 상부의 제거된 공간 바닥에 슬라이딩부재를 설치하는 단계; 상기 슬래브의 제거된 공간, 교대 흉벽의 제거된 공간, 그리고 접속슬래브의 제거된 공간에 연결부를 타설하기 위하여 상기 교량 슬래브의 제거된 공간으로 노출된 주철근과 상기 접속슬래브의 제거된 공간으로 노출된 주철근을 연결철근으로 연결하여 배근하는 단계; 상기 접속슬래브의 길이방향 다른 한쪽 끝단에 신축조절장치를 설치하는 단계; 상기 슬래브의 제거된 공간, 교대 흉벽의 제거된 공간, 그리고 접속슬래브의 제거된 공간에 콘크리트를 타설하여 반일체화 연결부를 형성하는 단계를 포함한다. 본 발명에 따르면, 교량 상부구조와 교대가 협착된 기존 교량에서 협착된 상부구조와 교대의 신축유간을 확보함과 아울러 기존 신축이음장치를 제거하고 반일체화한다.
METHOD FOR REPAIRING BRIDGE AS SEMIINTEGRAL ABUTMENT BRIDGE
교대협착 교량의 반일체화 시공방법
NAM MOON SEOK (author) / KIM KI HWAN (author) / CHOI HYUN HO (author) / CHOI JIN WOONG (author) / LEE BYEONG JU (author)
2021-06-30
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2021
|Bridge abutment and bridge abutment design and construction method
European Patent Office | 2021
|