Construction method of expansion joint using induction drainage pipe
An objective of the present invention is to provide a construction method of an expansion joint using a guide drainage pipe, which guides rainwater entering from an asphalt layer on an upper portion of a bridge to drain the rainwater through the inside of an expansion joint along the grade of the bridge to resolve a phenomenon caused by leakage or pooling of rainwater or inflow water. The construction method of an expansion joint using a guide drainage pipe comprises: a first step of providing expansion joints in which guide drainage units including a perforated drain pipe and a guide drainage pipe capable of guiding rainwater to drain the rainwater along the grade of a bridge are installed at regular intervals; a second step of setting the expansion joints provided in the first step on the bridge to install the expansion joints at regular intervals between decks of the bridge; a third step of installing a rainwater guide bracket on a sidewall of a concrete layer of the bridge to couple ends of perforated drain pipes provided on the expansion joints set in the second step to couple the rainwater guide bracket and the perforated drain pipes; and a fourth step of fixing the expansion joints by depositing post-deposition concrete consisting of a permeable layer into which rainwater can flow to bury the perforated drain pipes between the decks of the bridge and the expansion joints while the perforated drain pipes and the rainwater guide bracket are coupled by the third step.
본 발명의 목적은 교량 상부의 아스팔트층으로부터 유입되는 빗물을 교량 구배를 따라 신축이음장치의 내부를 통해 배수시킬 수 있도록 유도하여, 빗물이나 유입되는 물의 고임이나 누수로 발생하는 현상을 해결할 수 있는 유도배수관을 이용한 신축이음장치의 시공방법을 제공한다. 이러한 본 발명은, 교량의 구배를 따라 빗물이 배수되도록 유도할 수 있는 유도배수관과 유공관을 포함하는 유도배수부가 일정 간격으로 설치된 신축이음장치를 제공하는 제1단계; 상기 제1단계에서 제공하는 신축이음장치를 교량의 상판과 상판 사이에서 일정한 간격을 두고 설치하도록 교량에 셋팅하는 제2단계; 상기 제2단계에서 셋팅되는 신축이음장치에 구비된 유공관의 단부를 결합할 수 있도록 빗물유도브라켓을 교량의 콘크리트층 측벽면에 설치하여, 상기 빗물유도브라켓과 유공관을 결합하는 제3단계; 및 상기 제3단계에 의해 유공관과 빗물유도브라켓을 결합한 상태에서 상기 신축이음장치와 교량의 상판 사이에 유공관이 매립되도록 빗물이 유입될 수 있는 투수층으로 이루어지는 후타콘크리트를 타설하여 신축이음장치를 고정하는 제4단계;를 포함한다.
Construction method of expansion joint using induction drainage pipe
An objective of the present invention is to provide a construction method of an expansion joint using a guide drainage pipe, which guides rainwater entering from an asphalt layer on an upper portion of a bridge to drain the rainwater through the inside of an expansion joint along the grade of the bridge to resolve a phenomenon caused by leakage or pooling of rainwater or inflow water. The construction method of an expansion joint using a guide drainage pipe comprises: a first step of providing expansion joints in which guide drainage units including a perforated drain pipe and a guide drainage pipe capable of guiding rainwater to drain the rainwater along the grade of a bridge are installed at regular intervals; a second step of setting the expansion joints provided in the first step on the bridge to install the expansion joints at regular intervals between decks of the bridge; a third step of installing a rainwater guide bracket on a sidewall of a concrete layer of the bridge to couple ends of perforated drain pipes provided on the expansion joints set in the second step to couple the rainwater guide bracket and the perforated drain pipes; and a fourth step of fixing the expansion joints by depositing post-deposition concrete consisting of a permeable layer into which rainwater can flow to bury the perforated drain pipes between the decks of the bridge and the expansion joints while the perforated drain pipes and the rainwater guide bracket are coupled by the third step.
본 발명의 목적은 교량 상부의 아스팔트층으로부터 유입되는 빗물을 교량 구배를 따라 신축이음장치의 내부를 통해 배수시킬 수 있도록 유도하여, 빗물이나 유입되는 물의 고임이나 누수로 발생하는 현상을 해결할 수 있는 유도배수관을 이용한 신축이음장치의 시공방법을 제공한다. 이러한 본 발명은, 교량의 구배를 따라 빗물이 배수되도록 유도할 수 있는 유도배수관과 유공관을 포함하는 유도배수부가 일정 간격으로 설치된 신축이음장치를 제공하는 제1단계; 상기 제1단계에서 제공하는 신축이음장치를 교량의 상판과 상판 사이에서 일정한 간격을 두고 설치하도록 교량에 셋팅하는 제2단계; 상기 제2단계에서 셋팅되는 신축이음장치에 구비된 유공관의 단부를 결합할 수 있도록 빗물유도브라켓을 교량의 콘크리트층 측벽면에 설치하여, 상기 빗물유도브라켓과 유공관을 결합하는 제3단계; 및 상기 제3단계에 의해 유공관과 빗물유도브라켓을 결합한 상태에서 상기 신축이음장치와 교량의 상판 사이에 유공관이 매립되도록 빗물이 유입될 수 있는 투수층으로 이루어지는 후타콘크리트를 타설하여 신축이음장치를 고정하는 제4단계;를 포함한다.
Construction method of expansion joint using induction drainage pipe
유도배수관을 이용한 신축이음장치의 시공방법
KIM TAE HO (author)
2021-09-14
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Construction method of expansion joint using induction drainage pipe
European Patent Office | 2021
Drainage pipe construction method and assembled drainage pipe joint thereof
European Patent Office | 2023
|Construction method for reconstruction and expansion of expansion pipe of drainage pipe network
European Patent Office | 2023
|Expansion joint drainage device and construction method thereof
European Patent Office | 2023
|