A platform for research: civil engineering, architecture and urbanism
Order wall installation device and order wall installation method for constructing ground drilling and order wall using ground excavator at the same time
The present invention provides a cut-off wall installation device for simultaneously constructing ground drilling and a cut-off wall using a ground excavator. According to the present invention, the cut-off wall installation device comprises: an excavation unit (100) of the ground excavator which drills from the ground surface to a bedrock layer to form an excavation hole (10); and a sheet pile insertion means (200) attached to the excavation unit (100) to insert a sheet pile (20) into the excavation hole (10).
본 발명은 지표면에서 암반층까지 천공하여 굴착공(10)을 형성하는 지반 굴착기의 굴착유닛(100)과, 상기 굴착유닛(100)에 부착되어 쉬트파일(sheet pile; 20)을 상기 굴착공(10)에 삽입할 수 있는 쉬트파일 삽입수단(200)을 구비된 것을 특징으로 하는 지반 굴착기를 이용한 지반 천공과 차수벽을 동시에 시공하는 차수벽설치장치를 제공한다.
Order wall installation device and order wall installation method for constructing ground drilling and order wall using ground excavator at the same time
The present invention provides a cut-off wall installation device for simultaneously constructing ground drilling and a cut-off wall using a ground excavator. According to the present invention, the cut-off wall installation device comprises: an excavation unit (100) of the ground excavator which drills from the ground surface to a bedrock layer to form an excavation hole (10); and a sheet pile insertion means (200) attached to the excavation unit (100) to insert a sheet pile (20) into the excavation hole (10).
본 발명은 지표면에서 암반층까지 천공하여 굴착공(10)을 형성하는 지반 굴착기의 굴착유닛(100)과, 상기 굴착유닛(100)에 부착되어 쉬트파일(sheet pile; 20)을 상기 굴착공(10)에 삽입할 수 있는 쉬트파일 삽입수단(200)을 구비된 것을 특징으로 하는 지반 굴착기를 이용한 지반 천공과 차수벽을 동시에 시공하는 차수벽설치장치를 제공한다.
Order wall installation device and order wall installation method for constructing ground drilling and order wall using ground excavator at the same time
지반 굴착기를 이용한 지반 천공과 차수벽 동시에 시공하는 차수벽설치장치 및 차수벽설치방법
PAPK GI JU (author)
2021-09-29
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Order wall installation device and order wall installation method for constructing ground drilling
European Patent Office | 2020
|Installation method of decorative wall or ground covering
European Patent Office | 2020
|EXCAVATOR, INSTALLATION METHOD OF EXCAVATOR, AND GROUND EXCAVATION METHOD
European Patent Office | 2020
|European Patent Office | 2021
|INNER WALL INSTALLATION METHOD AND INNER WALL INSTALLATION STRUCTURE
European Patent Office | 2022
|