A platform for research: civil engineering, architecture and urbanism
FCM FORM TRAVELER FOR FCM BRIDGE CONSTRUCTION AND CONSTRUCTION METHOD USING THE SAME
The present invention relates to a form traveler for FCM bridge construction and a construction method using the same. In more specifically, the present invention relates to the form traveler for FCM bridge construction and the construction method using the same, which can fix and support the rear of the foam traveler in a simple way even when the foam traveler is used to construct a bridge using an FCM method, and can easily repair a portion to which the rear of the foam traveler is fixed even after construction. The form traveler for FCM bridge construction in accordance with the present invention comprises: a main body; and a fixing portion for connecting the main body to a girder. The fixing portion is provided with a steel bar member connected to and supported by a slab to support a load concentrated in the front. The slab is provided with a connection portion to and by which the steel bar member is connected and supported.
본 발명은 FCM 공법으로 교량을 시공하기 위한 폼 트래블러 및 이를 이용한 시공 방법에 관한 것이다. 더욱 상세하게는 FCM 공법으로 교량을 시공하기 위해 폼 트래블러를 사용하는 경우에도 간단한 방식으로 폼 트래블러의 후방을 고정 지지할 수 있고, 시공 이후에도 이러한 폼 트래블러의 후방이 고정된 부분을 간단하게 보수할 수 있는 FCM 공법으로 교량을 시공하기 위한 폼 트래블러 및 이를 이용한 시공 방법에 관한 것이다. 이를 위한 본 발명에 따른 FCM 공법으로 교량을 시공하기 위한 폼 트래블러는 본체, 및 상기 본체를 거더에 연결하는 고정부를 포함하고, 상기 고정부에는 전방에 집중되는 하중을 지지하도록 슬라브에 연결 지지되는 강봉 부재가 구비되며, 상기 슬라브에는 상기 강봉 부재가 연결 지지되는 연결부가 구비된다.
FCM FORM TRAVELER FOR FCM BRIDGE CONSTRUCTION AND CONSTRUCTION METHOD USING THE SAME
The present invention relates to a form traveler for FCM bridge construction and a construction method using the same. In more specifically, the present invention relates to the form traveler for FCM bridge construction and the construction method using the same, which can fix and support the rear of the foam traveler in a simple way even when the foam traveler is used to construct a bridge using an FCM method, and can easily repair a portion to which the rear of the foam traveler is fixed even after construction. The form traveler for FCM bridge construction in accordance with the present invention comprises: a main body; and a fixing portion for connecting the main body to a girder. The fixing portion is provided with a steel bar member connected to and supported by a slab to support a load concentrated in the front. The slab is provided with a connection portion to and by which the steel bar member is connected and supported.
본 발명은 FCM 공법으로 교량을 시공하기 위한 폼 트래블러 및 이를 이용한 시공 방법에 관한 것이다. 더욱 상세하게는 FCM 공법으로 교량을 시공하기 위해 폼 트래블러를 사용하는 경우에도 간단한 방식으로 폼 트래블러의 후방을 고정 지지할 수 있고, 시공 이후에도 이러한 폼 트래블러의 후방이 고정된 부분을 간단하게 보수할 수 있는 FCM 공법으로 교량을 시공하기 위한 폼 트래블러 및 이를 이용한 시공 방법에 관한 것이다. 이를 위한 본 발명에 따른 FCM 공법으로 교량을 시공하기 위한 폼 트래블러는 본체, 및 상기 본체를 거더에 연결하는 고정부를 포함하고, 상기 고정부에는 전방에 집중되는 하중을 지지하도록 슬라브에 연결 지지되는 강봉 부재가 구비되며, 상기 슬라브에는 상기 강봉 부재가 연결 지지되는 연결부가 구비된다.
FCM FORM TRAVELER FOR FCM BRIDGE CONSTRUCTION AND CONSTRUCTION METHOD USING THE SAME
FCM 공법으로 교량을 시공하기 위한 폼 트래블러 및 이를 이용한 시공 방법
SON KYOUNG SIK (author) / LEE TAE HUN (author)
2021-10-14
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
FORM TRAVELER AND BRIDGE CONSTRUCTION METHOD FOR USING THE SAME
European Patent Office | 2016
FORM TRAVELER, AND BRIDGE CONSTRUCTION METHOD FOR USING THE SAME
European Patent Office | 2015
|FCM FORM TRAVELER FOR FCM BRIDGE CONSTRUCTION AND CONSTRUCTION METHOD USING THE SAME
European Patent Office | 2022
FCM FORM TRAVELER FOR FCM BRIDGE CONSTRUCTION AND CONSTRUCTION METHOD USING THE SAME
European Patent Office | 2022
|