Construction Method of Underground Continuous Wall with Side Plate Opening
The present invention relates to a method for constructing a slurry wall, such as an underground tunnel, an underground parking lot, a detention tank, and the like. In an existing method, a slurry wall is formed by continuously inserting a double wall into an underground space made with precast concrete by trench excavation and pouring concrete into an interior space of the double wall, wherein soil and turbid water is prevented from entering an empty space inside the double wall to create uncontaminated sealed concrete and improve waterproofing functionality. The construction method for a slurry wall using the double wall is quick and simple, but since inserting and connecting work must be done in an underground underwater space, there is a problem of turbid water and soil flowing into the empty space. According to the present invention, a bottom side of the conventional double wall is first blocked and then both sides are blocked with side plates. In other words, a rectangular box shape with only a top side open on the whole is made. Concrete is poured through the open top side. Double wall units are produced in a rectangle with an open top side on the ground, and after multiple double wall units are continuously connected in the underground and underwater space, concrete is poured inside the double walls on site. Then, by pulling out and removing the side plates installed on both sides, the concrete poured inside is connected as a unified whole to form a slurry wall. In addition, an injection pipe is attached to the side plate so that concrete with high water-tightness can be additionally injected when the side plate is pulled out.
본 발명은 지하차도,지하주차장,저류조 등 지하연속벽을 시공함에 있어, 트렌치 굴착으로 확보된 지하 공간에 프리캐스트 콘크리트로 더블월을 연속적으로 삽입하고, 더블월 내부 공간에 콘크리트를 타설하여 일체화함으로서 연속된 벽체를 형성하되, 더블월 내부 빈 공간에 토사 및 혼탁수 유입을 방지하여 오염되지 않은 밀실한 콘크리트를 형성하고 방수기능을 향상시킬수 있는 시공방법에 관한 것이다. 상기 더블월을 사용한 지하연속벽 시공은 신속하고 간단하지만 지하 수중공간에서 삽입 및 연결해야 하므로 혼탁수 및 토사가 빈 공간으로 유입되는 문제가 발생한다. 본 발명은 먼저 종래 더블월의 하면을 막고 이어 양측면을 측판으로 막도록 한다. 즉 전체적으로 상면만 개방된 직사각 박스 모양을 만든다. 개방된 상면으로 콘크리트를 투입하고 타설하게 된다. 지상에서 상면이 개방된 직사각 형태로 단위의 더블월을 제작하고 지하 수중공간에서 다수개를 연속적으로 연결한 후 더블월 내부에 콘크리트를 현장타설한다. 이어 양측면에 설치된 측판을 인발하여 제거함으로서 내부에 타설한 콘크리트를 전체적으로 연결 및 일체화하여 연속된 벽체를 형성하도록 한다. 아울러 측판에는 주입관을 부착하여 측판을 인발할 때 수밀성 높은 콘크리트를 추가 주입할수 있도록 한다.
Construction Method of Underground Continuous Wall with Side Plate Opening
The present invention relates to a method for constructing a slurry wall, such as an underground tunnel, an underground parking lot, a detention tank, and the like. In an existing method, a slurry wall is formed by continuously inserting a double wall into an underground space made with precast concrete by trench excavation and pouring concrete into an interior space of the double wall, wherein soil and turbid water is prevented from entering an empty space inside the double wall to create uncontaminated sealed concrete and improve waterproofing functionality. The construction method for a slurry wall using the double wall is quick and simple, but since inserting and connecting work must be done in an underground underwater space, there is a problem of turbid water and soil flowing into the empty space. According to the present invention, a bottom side of the conventional double wall is first blocked and then both sides are blocked with side plates. In other words, a rectangular box shape with only a top side open on the whole is made. Concrete is poured through the open top side. Double wall units are produced in a rectangle with an open top side on the ground, and after multiple double wall units are continuously connected in the underground and underwater space, concrete is poured inside the double walls on site. Then, by pulling out and removing the side plates installed on both sides, the concrete poured inside is connected as a unified whole to form a slurry wall. In addition, an injection pipe is attached to the side plate so that concrete with high water-tightness can be additionally injected when the side plate is pulled out.
본 발명은 지하차도,지하주차장,저류조 등 지하연속벽을 시공함에 있어, 트렌치 굴착으로 확보된 지하 공간에 프리캐스트 콘크리트로 더블월을 연속적으로 삽입하고, 더블월 내부 공간에 콘크리트를 타설하여 일체화함으로서 연속된 벽체를 형성하되, 더블월 내부 빈 공간에 토사 및 혼탁수 유입을 방지하여 오염되지 않은 밀실한 콘크리트를 형성하고 방수기능을 향상시킬수 있는 시공방법에 관한 것이다. 상기 더블월을 사용한 지하연속벽 시공은 신속하고 간단하지만 지하 수중공간에서 삽입 및 연결해야 하므로 혼탁수 및 토사가 빈 공간으로 유입되는 문제가 발생한다. 본 발명은 먼저 종래 더블월의 하면을 막고 이어 양측면을 측판으로 막도록 한다. 즉 전체적으로 상면만 개방된 직사각 박스 모양을 만든다. 개방된 상면으로 콘크리트를 투입하고 타설하게 된다. 지상에서 상면이 개방된 직사각 형태로 단위의 더블월을 제작하고 지하 수중공간에서 다수개를 연속적으로 연결한 후 더블월 내부에 콘크리트를 현장타설한다. 이어 양측면에 설치된 측판을 인발하여 제거함으로서 내부에 타설한 콘크리트를 전체적으로 연결 및 일체화하여 연속된 벽체를 형성하도록 한다. 아울러 측판에는 주입관을 부착하여 측판을 인발할 때 수밀성 높은 콘크리트를 추가 주입할수 있도록 한다.
Construction Method of Underground Continuous Wall with Side Plate Opening
측판 개방식 지하연속벽 시공방법
JUNG HA DONG (author)
2022-07-21
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2020
|UNDERGROUND CONTINUOUS WALL AND CONSTRUCTION METHOD FOR UNDERGROUND CONTINUOUS WALL
European Patent Office | 2020
|CONSTRUCTION METHOD OF UNDERGROUND CONTINUOUS WALL AND UNDERGROUND CONTINUOUS WALL
European Patent Office | 2018
|CONSTRUCTION METHOD OF UNDERGROUND CONTINUOUS WALL AND UNDERGROUND CONTINUOUS WALL
European Patent Office | 2017
|CONSTRUCTION METHOD OF UNDERGROUND CONTINUOUS WALL, AND UNDERGROUND CONTINUOUS WALL
European Patent Office | 2017
|