Construction and maintenance method for the crossing section of the rail buried track
Disclosed is a method for constructing and maintaining a crossing section of a rail-embedded track. In accordance with an embodiment, the method for constructing and maintaining a crossing section of a rail-embedded track, includes: a first step of performing a survey, and removing an existing track, and then, removing ballast, and cutting and compacting a roadbed; a second step of transporting a precast panel, in which roadbed grooves dented to allow a track to be embedded therein are formed on both sides of an upper surface respectively, and then, installing the precast panel on the roadbed; a third step of installing a side mold, placing concrete, and then, curing the concrete to form a roadbed stabilization layer; a fourth step of dismantling the mold after the completion of the curing in the third step; a fifth step of inserting a rail into the roadbed grooves, and then, performing welding, and removing foreign substances from the surface of the rail; a sixth step of cleaning the upper surface of the precast panel and the roadbed grooves through air spraying or air suction; a seventh step of applying an adhesive to the bottom surface of the roadbed grooves, and then, bonding an elastic rail pad, and then, applying a surface treatment primer to the surface of the rail and the inside of the grooves; an eighth step of installing a shim plate for height adjustment and a shim plate for rail inclination adjustment, installing a pipe with a spacer inserted therein, and then, inserting a wedge, and sealing the pipe with a sealing member; a ninth step of mixing synthetic resin, and then injecting the mixture into the inside and outside of the rail; and a tenth step of placing a protector on the upper surface of the precast panel to cover the top of the rail and the roadbed grooves, and then, fastening a fixing member to fix the protector. Therefore, the present invention is capable of enabling stable curing while preventing damage to an embedded rail.
레일매립형궤도의 건널목 구간 시공 및 유지보수방법이 개시된다. 실시예에 따르면, 레일매립형궤도의 건널목 구간 시공방법에 있어서, 측량을 하고, 기존선로를 철거한 후 도상자갈을 제거하고 노반을 깎고 다지는 1단계; 궤도가 매립되도록 함몰 형성된 도상 홈이 상면 양측에 각기 형성된 프리캐스트 패널을 운반한 후 노반에 설치하는 2단계; 측면 거푸집을 설치하고, 콘크리트를 타설한 후 양생시켜 도상안정층을 형성하는 3단계; 3단계의 양생이 완료된 후 거푸집을 해체하는 4단계; 레일을 상기 도상 홈에 삽입한 후 용접을 실시하고 레일표면의 이물질을 제거하는 5단계; 프리캐스트 패널의 상면 및 도상 홈에 공기 분사 또는 공기 흡입에 의해 청소하는 6단계; 도상 홈의 바닥면에 접착제를 도포한 후 탄성레일패드를 접착시킨 다음 레일 표면과 도상 홈 내부에 표면처리 프라이머를 도포하는 7단계; 높이조절용 심플레이트와 레일 경좌 조절용 심플레이트를 설치하고, 스페이서를 끼운 파이프를 설치한 후 웨지를 삽입하고 씰부재로 밀폐시키는 8단계; 합성수지를 배합한 후 레일의 내,외측에 주입하는 9단계;를 포함하고, 레일 및 도상 홈의 상부를 덮도록 보호대를 프리캐스트 패널의 상면에 안착시킨 후 고정부재를 체결하여 고정시키는 10단계;를 포함한다.
Construction and maintenance method for the crossing section of the rail buried track
Disclosed is a method for constructing and maintaining a crossing section of a rail-embedded track. In accordance with an embodiment, the method for constructing and maintaining a crossing section of a rail-embedded track, includes: a first step of performing a survey, and removing an existing track, and then, removing ballast, and cutting and compacting a roadbed; a second step of transporting a precast panel, in which roadbed grooves dented to allow a track to be embedded therein are formed on both sides of an upper surface respectively, and then, installing the precast panel on the roadbed; a third step of installing a side mold, placing concrete, and then, curing the concrete to form a roadbed stabilization layer; a fourth step of dismantling the mold after the completion of the curing in the third step; a fifth step of inserting a rail into the roadbed grooves, and then, performing welding, and removing foreign substances from the surface of the rail; a sixth step of cleaning the upper surface of the precast panel and the roadbed grooves through air spraying or air suction; a seventh step of applying an adhesive to the bottom surface of the roadbed grooves, and then, bonding an elastic rail pad, and then, applying a surface treatment primer to the surface of the rail and the inside of the grooves; an eighth step of installing a shim plate for height adjustment and a shim plate for rail inclination adjustment, installing a pipe with a spacer inserted therein, and then, inserting a wedge, and sealing the pipe with a sealing member; a ninth step of mixing synthetic resin, and then injecting the mixture into the inside and outside of the rail; and a tenth step of placing a protector on the upper surface of the precast panel to cover the top of the rail and the roadbed grooves, and then, fastening a fixing member to fix the protector. Therefore, the present invention is capable of enabling stable curing while preventing damage to an embedded rail.
레일매립형궤도의 건널목 구간 시공 및 유지보수방법이 개시된다. 실시예에 따르면, 레일매립형궤도의 건널목 구간 시공방법에 있어서, 측량을 하고, 기존선로를 철거한 후 도상자갈을 제거하고 노반을 깎고 다지는 1단계; 궤도가 매립되도록 함몰 형성된 도상 홈이 상면 양측에 각기 형성된 프리캐스트 패널을 운반한 후 노반에 설치하는 2단계; 측면 거푸집을 설치하고, 콘크리트를 타설한 후 양생시켜 도상안정층을 형성하는 3단계; 3단계의 양생이 완료된 후 거푸집을 해체하는 4단계; 레일을 상기 도상 홈에 삽입한 후 용접을 실시하고 레일표면의 이물질을 제거하는 5단계; 프리캐스트 패널의 상면 및 도상 홈에 공기 분사 또는 공기 흡입에 의해 청소하는 6단계; 도상 홈의 바닥면에 접착제를 도포한 후 탄성레일패드를 접착시킨 다음 레일 표면과 도상 홈 내부에 표면처리 프라이머를 도포하는 7단계; 높이조절용 심플레이트와 레일 경좌 조절용 심플레이트를 설치하고, 스페이서를 끼운 파이프를 설치한 후 웨지를 삽입하고 씰부재로 밀폐시키는 8단계; 합성수지를 배합한 후 레일의 내,외측에 주입하는 9단계;를 포함하고, 레일 및 도상 홈의 상부를 덮도록 보호대를 프리캐스트 패널의 상면에 안착시킨 후 고정부재를 체결하여 고정시키는 10단계;를 포함한다.
Construction and maintenance method for the crossing section of the rail buried track
프리캐스트 패널을 활용한 레일매립형궤도의 건널목 구간 시공 및 유지보수방법
MUN JUNG BOK (author)
2022-08-05
Patent
Electronic Resource
Korean
Rapid construction method for level crossing road section track
European Patent Office | 2020
|