Grouting messer shield method using messer shield pannel and square tube plate
The present invention relates to a grouting construction method using a propulsion panel and a square deck plate, to which a construction method using a propulsion panel press-fitting device is applied. The grouting construction method comprises: a preparation step of providing propulsion panels, a press-fitting device, and deck plates each having a nozzle connection pipe installed in a grouting nozzle hole at at least one location of each pipe; a step of installing a propulsion base that fits within the edges of a desired vertical space; an entry step of introducing the propulsion panels into the ground in order in the propulsion base and excavating soil inside an entry section; a first installation step of installing a first support member in the excavated area; a second entry step of additionally introducing the propulsion panels into the ground in order and excavating the soil inside the entry section; a second installation step of installing a second support member in the excavated area; a deck plate installation step of inserting each pipe deck plate into a support material at right angles in an entry direction of the propulsion panels; a repeating step of repeatedly inserting each pipe deck plate into the support material; a first grouting step of supplying a grouting liquid to a deck plate nozzle connection pipe at an upper location; a second grouting step of checking whether the grouting liquid supplied to the deck plate nozzle connection pipe at the upper location moves to a deck plate nozzle connection pipe at an adjacent lower location and is discharged, blocking the deck plate nozzle connection pipe at the upper location, and supplying the grouting liquid to a nozzle connection pipe at or near the discharged location; and a repeated grouting step of performing the first and second grouting steps up to each pipe deck plate at the bottom. Therefore, the ground can be reinforced.
본원발명은 추진 패널 압입 장치를 이용한 공법을 적용하는 추진패널과 압입장치와, 각파이프 적어도 한 곳에 그라우팅노즐홀에 설치된 노즐연결관을 설치한 복공판을 구비하는 준비단계; 원하는 수직 공간의 테두리에 맞는 추진 기지 설치 단계; 상기 추진 기지에서 추진패널을 차례로 지중으로 진입 및 진입구간의 내부 토양을 굴착하는 진입단계; 굴착된 영역에 제 1 지지 부재를 설치하는 제 1설치단계; 이어 추가로 추진패널을 차례로 지중으로 진입 및 진입구간의 내부 토양을 굴착하는 제2진입단계; 상기 굴착된 영역에 제 2 지지 부재를 설치하는 제 2설치단계; 상기 추진패널의 진입 방향에 직각으로 각파이프 복공판을 지지지보재에 끼워넣는 복공판설치단계; 이를 반복하여 각파이프 복공판을 지지지보재에 끼워넣는 반복단계; 상부위치의 복공판 노즐연결관에 그라우팅액을 공급하는 제1그라우팅단계; 상부위치의 복공판 노즐연결관에 공급된 그라우팅액이 인접하부의 복공판 노즐연결관으로 이동하여 배출되는지 확인하여막고 배출되는 위치 또는 부근의 노즐연결관으로 그라우팅액을 공급하는 제 2그라우팅단계; 및 상기 제 1 및 제 2 그라우팅단계를 하단의 각파이프복공판까지 수행하는 반복그라우팅단계를 포함하여 수행하는 추진패널과 사각관 복공판을 이용한 그라우팅 공법이다.
Grouting messer shield method using messer shield pannel and square tube plate
The present invention relates to a grouting construction method using a propulsion panel and a square deck plate, to which a construction method using a propulsion panel press-fitting device is applied. The grouting construction method comprises: a preparation step of providing propulsion panels, a press-fitting device, and deck plates each having a nozzle connection pipe installed in a grouting nozzle hole at at least one location of each pipe; a step of installing a propulsion base that fits within the edges of a desired vertical space; an entry step of introducing the propulsion panels into the ground in order in the propulsion base and excavating soil inside an entry section; a first installation step of installing a first support member in the excavated area; a second entry step of additionally introducing the propulsion panels into the ground in order and excavating the soil inside the entry section; a second installation step of installing a second support member in the excavated area; a deck plate installation step of inserting each pipe deck plate into a support material at right angles in an entry direction of the propulsion panels; a repeating step of repeatedly inserting each pipe deck plate into the support material; a first grouting step of supplying a grouting liquid to a deck plate nozzle connection pipe at an upper location; a second grouting step of checking whether the grouting liquid supplied to the deck plate nozzle connection pipe at the upper location moves to a deck plate nozzle connection pipe at an adjacent lower location and is discharged, blocking the deck plate nozzle connection pipe at the upper location, and supplying the grouting liquid to a nozzle connection pipe at or near the discharged location; and a repeated grouting step of performing the first and second grouting steps up to each pipe deck plate at the bottom. Therefore, the ground can be reinforced.
본원발명은 추진 패널 압입 장치를 이용한 공법을 적용하는 추진패널과 압입장치와, 각파이프 적어도 한 곳에 그라우팅노즐홀에 설치된 노즐연결관을 설치한 복공판을 구비하는 준비단계; 원하는 수직 공간의 테두리에 맞는 추진 기지 설치 단계; 상기 추진 기지에서 추진패널을 차례로 지중으로 진입 및 진입구간의 내부 토양을 굴착하는 진입단계; 굴착된 영역에 제 1 지지 부재를 설치하는 제 1설치단계; 이어 추가로 추진패널을 차례로 지중으로 진입 및 진입구간의 내부 토양을 굴착하는 제2진입단계; 상기 굴착된 영역에 제 2 지지 부재를 설치하는 제 2설치단계; 상기 추진패널의 진입 방향에 직각으로 각파이프 복공판을 지지지보재에 끼워넣는 복공판설치단계; 이를 반복하여 각파이프 복공판을 지지지보재에 끼워넣는 반복단계; 상부위치의 복공판 노즐연결관에 그라우팅액을 공급하는 제1그라우팅단계; 상부위치의 복공판 노즐연결관에 공급된 그라우팅액이 인접하부의 복공판 노즐연결관으로 이동하여 배출되는지 확인하여막고 배출되는 위치 또는 부근의 노즐연결관으로 그라우팅액을 공급하는 제 2그라우팅단계; 및 상기 제 1 및 제 2 그라우팅단계를 하단의 각파이프복공판까지 수행하는 반복그라우팅단계를 포함하여 수행하는 추진패널과 사각관 복공판을 이용한 그라우팅 공법이다.
Grouting messer shield method using messer shield pannel and square tube plate
추진패널과 사각관 복공판을 이용한 그라우팅 공법
KIM SUN JIN (author)
2022-11-15
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Grouting messer shield method using messer shield pannel and square tube plate
European Patent Office | 2023
INITIAL DIGGING MESSER SHIELD PANNEL FOR UNDERGROUND TUNNEL
European Patent Office | 2016
|European Patent Office | 2018
|