Thumb pile with displacement control unit and self-supporting temporary retainer construction method using the same
In accordance with a purpose of the present invention, provided are an H-pile provided with a displacement control unit and a self-standing temporary retaining wall construction method using the same, wherein as a displacement control unit capable of converting a horizontal tensile force into a vertical tensile force is installed on an H-pile made of an H beam at an excavation depth requiring a bracing structure by excavation phase, a PC steel pipe is inserted into a sheath pipe of the displacement control unit, and then, the PC steel pipe is tensed, such that a consumption support force can be secured at the excavation depth requiring the bracing structure. To achieve the purpose, the H-pile provided with a displacement control unit, comprises a displacement control unit installed and fixed to a predetermined position of an H-pile made of an H-beam having a predetermined length. Moreover, to achieve the purpose, in accordance with the present invention, the self-standing temporary retaining wall construction method using the H-pile provided with a displacement control unit, includes the following steps of: (S1) manufacturing an H-pile provided with a displacement control unit; (S2) forming a drill hole by drilling a hole of a predetermined diameter and depth on the ground in which the H-pile provided with the displacement control unit is to be embedded; (S3) driving and embedding the H-pile provided with the displacement control unit, into the drill hole; (S4) filling the H-pile provided with the displacement control unit, which has been embedded in the drill hole, with sand; and (S5) tensing a PC steel pipe horizontally or downward in a sheath pipe of the displacement control unit of the H-pile provided with the displacement control unit.
본 발명은 굴착단계별 버팀구조가 필요한 굴착깊이에서 H빔으로 이루어진 엄지말뚝에 수평인장력을 수직인장력으로 전환할 수 있는 변위제어부를 설치하여, 상기 변위제어부의 시스관에 PC강재를 삽입후, 상기 PC강재를 인장함으로써, 버팀이 필요한 굴착깊이에서 소요 지지력의 확보가 가능하도록 변위제어부가 구비된 엄지말뚝 및 이를 이용한 자립식 가설 흙막이 시공방법을 제공하는데 그 목적이 있다. 상기한 목적을 달성하기 위한 본 발명에 따른 변위제어부가 구비된 엄지말뚝은 일정한 길이를 갖는 H빔으로 이루어진 엄지말뚝의 소정의 위치에 고정 설치되는 변위제어부로 구성됨을 특징으로 한다. 또한, 상기한 목적을 달성하기 위한 본 발명에 따른 변위제어부가 구비된 엄지말뚝을 이용한 자립식 가설 흙막이 시공방법은 변위제어부가 구비된 엄지말뚝을 제작하는 단계(S 1); 상기 변위제어부가 구비된 엄지말뚝을 근입할 지반을 소정의 직경 및 깊이로 천공하여 천공홀을 형성하는 단계(S 2); 상기 천공홀에 변위제어부가 구비된 엄지말뚝을 항타 근입하는 단계(S 3); 상기 천공홀에 항타 근입된 변위제어부가 구비된 엄지말뚝에 모래를 충전하는 단계(S 4); 상기 변위제어부가 구비된 엄지말뚝의 변위제어부의 시스관에서 PC강재를 수평 또는 하향으로 인장하는 단계(S 5)로 이루어짐을 특징으로 한다.
Thumb pile with displacement control unit and self-supporting temporary retainer construction method using the same
In accordance with a purpose of the present invention, provided are an H-pile provided with a displacement control unit and a self-standing temporary retaining wall construction method using the same, wherein as a displacement control unit capable of converting a horizontal tensile force into a vertical tensile force is installed on an H-pile made of an H beam at an excavation depth requiring a bracing structure by excavation phase, a PC steel pipe is inserted into a sheath pipe of the displacement control unit, and then, the PC steel pipe is tensed, such that a consumption support force can be secured at the excavation depth requiring the bracing structure. To achieve the purpose, the H-pile provided with a displacement control unit, comprises a displacement control unit installed and fixed to a predetermined position of an H-pile made of an H-beam having a predetermined length. Moreover, to achieve the purpose, in accordance with the present invention, the self-standing temporary retaining wall construction method using the H-pile provided with a displacement control unit, includes the following steps of: (S1) manufacturing an H-pile provided with a displacement control unit; (S2) forming a drill hole by drilling a hole of a predetermined diameter and depth on the ground in which the H-pile provided with the displacement control unit is to be embedded; (S3) driving and embedding the H-pile provided with the displacement control unit, into the drill hole; (S4) filling the H-pile provided with the displacement control unit, which has been embedded in the drill hole, with sand; and (S5) tensing a PC steel pipe horizontally or downward in a sheath pipe of the displacement control unit of the H-pile provided with the displacement control unit.
본 발명은 굴착단계별 버팀구조가 필요한 굴착깊이에서 H빔으로 이루어진 엄지말뚝에 수평인장력을 수직인장력으로 전환할 수 있는 변위제어부를 설치하여, 상기 변위제어부의 시스관에 PC강재를 삽입후, 상기 PC강재를 인장함으로써, 버팀이 필요한 굴착깊이에서 소요 지지력의 확보가 가능하도록 변위제어부가 구비된 엄지말뚝 및 이를 이용한 자립식 가설 흙막이 시공방법을 제공하는데 그 목적이 있다. 상기한 목적을 달성하기 위한 본 발명에 따른 변위제어부가 구비된 엄지말뚝은 일정한 길이를 갖는 H빔으로 이루어진 엄지말뚝의 소정의 위치에 고정 설치되는 변위제어부로 구성됨을 특징으로 한다. 또한, 상기한 목적을 달성하기 위한 본 발명에 따른 변위제어부가 구비된 엄지말뚝을 이용한 자립식 가설 흙막이 시공방법은 변위제어부가 구비된 엄지말뚝을 제작하는 단계(S 1); 상기 변위제어부가 구비된 엄지말뚝을 근입할 지반을 소정의 직경 및 깊이로 천공하여 천공홀을 형성하는 단계(S 2); 상기 천공홀에 변위제어부가 구비된 엄지말뚝을 항타 근입하는 단계(S 3); 상기 천공홀에 항타 근입된 변위제어부가 구비된 엄지말뚝에 모래를 충전하는 단계(S 4); 상기 변위제어부가 구비된 엄지말뚝의 변위제어부의 시스관에서 PC강재를 수평 또는 하향으로 인장하는 단계(S 5)로 이루어짐을 특징으로 한다.
Thumb pile with displacement control unit and self-supporting temporary retainer construction method using the same
변위제어부가 구비된 엄지말뚝 및 이를 이용한 자립식 가설 흙막이 시공방법
OH YONG HWAN (author) / BAEK WOO YEUL (author)
2023-03-07
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|European Patent Office | 2018
|3 Three-way thumb pile reinforcement type self-supporting soil barrier construction method
European Patent Office | 2021
|European Patent Office | 2023