Construction Method of Earth Retaining Wall Using Earth Anchor Appling Overlap Zone of Wale
In accordance with the present invention, an anchor type temporary retaining wall construction method employing a wale overlapping area, includes the following steps of: (a) installing a plurality of H-piles apart from each other on the ground, and installing a retaining wall structure between the H-piles adjacent to each other; (b) installing a plurality of wales, which are provided with a predetermined unit length determined by a design in which a steel wire arrangement unit having a steel wire through hole formed therein and a connection unit connected to both sides of the steel wire arrangement unit in a horizontal direction are consecutively connected, in an arrangement direction of the H-piles by tilting the wales at a preset angle maintained to the ground; and (c) anchoring one end of a steel wire in a terrain subject to earth retaining, and anchoring the other end of the steel wire on the steel wire arrangement unit in a tensed state by leading the other end of the steel wire through the steel wire through hole. In the step (b), adjacent wales of the plurality of wales are made to be arranged at different heights to form an overlapping area in which the connection units located on the outermost side of each of the wales are overlapped with each other by a predetermined length.
본 발명에 따른 띠장 중복영역을 적용한 앵커식 흙막이 가시설 시공방법은, 지반에 복수 개의 엄지말뚝을 이격 설치하고, 서로 인접한 상기 엄지말뚝 사이에 흙막이 구조물을 설치하는 (a)단계, 내측에 강선통과홀이 형성된 강선배치유닛과, 상기 강선배치유닛의 양측에 수평 방향으로 연결되는 연결유닛이 연속적으로 연결되어 설계에 의해 결정된 소정의 단위 길이를 가지도록 구비되는 복수 개의 띠장을, 지면에 대해 기 설정된 각도를 유지하도록 기울여 상기 엄지말뚝의 배치 방향을 따라 설치하는 (b)단계 및 흙막이 대상 지형에 강선의 타단부를 정착시키고, 상기 강선의 일단부가 상기 강선통과홀을 통과하도록 하여 긴장시킨 상태로 상기 강선배치유닛에 정착시키는 (c)단계를 포함하며, 상기 (b)단계는, 상기 복수 개의 띠장 중 서로 인접한 띠장이 서로 다른 높이에 배치되도록 하여, 각각의 띠장에서 가장 바깥쪽에 위치된 상기 연결유닛 간이 서로 소정 길이만큼 겹치는 중복영역을 형성하도록 설치한다.
Construction Method of Earth Retaining Wall Using Earth Anchor Appling Overlap Zone of Wale
In accordance with the present invention, an anchor type temporary retaining wall construction method employing a wale overlapping area, includes the following steps of: (a) installing a plurality of H-piles apart from each other on the ground, and installing a retaining wall structure between the H-piles adjacent to each other; (b) installing a plurality of wales, which are provided with a predetermined unit length determined by a design in which a steel wire arrangement unit having a steel wire through hole formed therein and a connection unit connected to both sides of the steel wire arrangement unit in a horizontal direction are consecutively connected, in an arrangement direction of the H-piles by tilting the wales at a preset angle maintained to the ground; and (c) anchoring one end of a steel wire in a terrain subject to earth retaining, and anchoring the other end of the steel wire on the steel wire arrangement unit in a tensed state by leading the other end of the steel wire through the steel wire through hole. In the step (b), adjacent wales of the plurality of wales are made to be arranged at different heights to form an overlapping area in which the connection units located on the outermost side of each of the wales are overlapped with each other by a predetermined length.
본 발명에 따른 띠장 중복영역을 적용한 앵커식 흙막이 가시설 시공방법은, 지반에 복수 개의 엄지말뚝을 이격 설치하고, 서로 인접한 상기 엄지말뚝 사이에 흙막이 구조물을 설치하는 (a)단계, 내측에 강선통과홀이 형성된 강선배치유닛과, 상기 강선배치유닛의 양측에 수평 방향으로 연결되는 연결유닛이 연속적으로 연결되어 설계에 의해 결정된 소정의 단위 길이를 가지도록 구비되는 복수 개의 띠장을, 지면에 대해 기 설정된 각도를 유지하도록 기울여 상기 엄지말뚝의 배치 방향을 따라 설치하는 (b)단계 및 흙막이 대상 지형에 강선의 타단부를 정착시키고, 상기 강선의 일단부가 상기 강선통과홀을 통과하도록 하여 긴장시킨 상태로 상기 강선배치유닛에 정착시키는 (c)단계를 포함하며, 상기 (b)단계는, 상기 복수 개의 띠장 중 서로 인접한 띠장이 서로 다른 높이에 배치되도록 하여, 각각의 띠장에서 가장 바깥쪽에 위치된 상기 연결유닛 간이 서로 소정 길이만큼 겹치는 중복영역을 형성하도록 설치한다.
Construction Method of Earth Retaining Wall Using Earth Anchor Appling Overlap Zone of Wale
띠장 중복영역을 적용한 앵커식 흙막이 가시설 시공방법