A platform for research: civil engineering, architecture and urbanism
end of initial driving : EOID Resrike Pile construction method using EOID and Restrike dynamic load test
The present invention relates to a pile constructing method using an end of initial driving and a restrike. The pile constructing method using the end of initial driving and the restrike of the present invention comprises the following steps of: (a) inputting pile information and ground information at a construction site; (b) predicting a main surface friction of a pile by comparing the pile information, the ground information at the construction site, and information generated through regression analysis of an existing restrike testing result; (c) setting a target load of a pile bearing capacity based on the pile information, the ground information at the construction site, and the main surface friction of the pile; (d) predicting a tip stress (CSB) of the pile to implement the target load through a dynamic load test; and (e) determining a weight and a drop height of a hammer used in a driving process based on the tip stress of the pile.
본 발명은, (a) 말뚝 정보, 시공현장의 지반 정보를 입력하는 단계; (b) 말뚝 정보, 시공현장의 지반 정보와 기존 리스트라이크 시험결과의 회귀분석을 통해 생성되는 정보를 비교하여 상기 말뚝의 주면마찰력을 예측하는 단계; (c) 말뚝 정보, 시공현장의 지반 정보 및 상기 말뚝의 주면마찰력을 바탕으로 상기 말뚝 지지력의 목표하중을 설정하는 단계; (d) 동재하시험을 통해 상기 목표하중을 구현하기 위한 상기 말뚝의 선단응력(CSB)을 예측하는 단계; 및 (e) 상기 말뚝의 선단응력을 바탕으로 하여 항타공정에 사용되는 해머의 중량 및 낙하고를 결정하는 단계를 포함하는 것을 특징으로 한다.
end of initial driving : EOID Resrike Pile construction method using EOID and Restrike dynamic load test
The present invention relates to a pile constructing method using an end of initial driving and a restrike. The pile constructing method using the end of initial driving and the restrike of the present invention comprises the following steps of: (a) inputting pile information and ground information at a construction site; (b) predicting a main surface friction of a pile by comparing the pile information, the ground information at the construction site, and information generated through regression analysis of an existing restrike testing result; (c) setting a target load of a pile bearing capacity based on the pile information, the ground information at the construction site, and the main surface friction of the pile; (d) predicting a tip stress (CSB) of the pile to implement the target load through a dynamic load test; and (e) determining a weight and a drop height of a hammer used in a driving process based on the tip stress of the pile.
본 발명은, (a) 말뚝 정보, 시공현장의 지반 정보를 입력하는 단계; (b) 말뚝 정보, 시공현장의 지반 정보와 기존 리스트라이크 시험결과의 회귀분석을 통해 생성되는 정보를 비교하여 상기 말뚝의 주면마찰력을 예측하는 단계; (c) 말뚝 정보, 시공현장의 지반 정보 및 상기 말뚝의 주면마찰력을 바탕으로 상기 말뚝 지지력의 목표하중을 설정하는 단계; (d) 동재하시험을 통해 상기 목표하중을 구현하기 위한 상기 말뚝의 선단응력(CSB)을 예측하는 단계; 및 (e) 상기 말뚝의 선단응력을 바탕으로 하여 항타공정에 사용되는 해머의 중량 및 낙하고를 결정하는 단계를 포함하는 것을 특징으로 한다.
end of initial driving : EOID Resrike Pile construction method using EOID and Restrike dynamic load test
초기동재하시험(end of initial driving : EOID) 및 재동재하시험(Resrike)을 이용하는 말뚝 시공방법
HAN BYUNG KWON (author)
2023-10-06
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2024
Pile Evaluation by Dynamic Testing During Restrike
British Library Conference Proceedings | 1993
|British Library Online Contents | 2012
|EVALUATION OF PILE SET-UP USING ICAP DYNAMIC RESTRIKE SOFTWARE ANALYSIS IN THE STATE OF ALABAMA
British Library Conference Proceedings | 2015
|