A platform for research: civil engineering, architecture and urbanism
To enhance and reinforce the bearing capacity of the ground, a method of inserting a ground reinforcement spiral bolt and a pile and injecting mortar is known. That is, in the case of rock ground containing rock layers or large gravel layers, an excavator is used to excavate the rock ground, and the ground reinforcement pile is inserted into the excavated hole, and then, mortar is poured. In the case of not hard ground of sandy or clayey soil but soft ground such as embankment ground containing gravel or with insufficient compaction, simple ground reinforcement piles alone may not provide sufficient support. In this instance, to stably fix posts of a post structure, a ground reinforcement pile with a dual or triple spiral structure (spiral bolts) provided as a bolt, a ground anchor, and a twisted flat steel can be utilized to stably fix the post structure to the ground.
지반의 지지력을 보강하여 강화하기 위하여, 지반보강용 스파이럴볼트, 파일을 삽입 후 추가로 몰타르를 주입하는 방식이 공지되어 있다. 즉, 암반층이나 큰 자갈층이 포함된 지반 등과 같은 암반지반의 경우 굴착기를 이용하여 암반 지반을 굴착하고, 굴착공에 지반보강용 파일을 삽입한 후 몰타르를 타설하게 된다. 여기서, 사토질이나 점토질의 경질지반이 아닌 자갈이 포함되거나 다짐이 불충분한 성토 지반 등과 같은 연약지반인 경우 단순한 지반보강용 파일만으로는 지지력이 부족할 수 있게 된다. 이때, 포스트구조물의 지주를 안정적으로 고정하기 위하여 볼트와 지중앵커, 트위스트 형성된 평철로 제공되는 이중, 삼중 나선구조의 지반보강용 파일(Spiral Bolt)을 이용하여 지반에 포스트구조물을 안정적으로 고정할 수 있다.
To enhance and reinforce the bearing capacity of the ground, a method of inserting a ground reinforcement spiral bolt and a pile and injecting mortar is known. That is, in the case of rock ground containing rock layers or large gravel layers, an excavator is used to excavate the rock ground, and the ground reinforcement pile is inserted into the excavated hole, and then, mortar is poured. In the case of not hard ground of sandy or clayey soil but soft ground such as embankment ground containing gravel or with insufficient compaction, simple ground reinforcement piles alone may not provide sufficient support. In this instance, to stably fix posts of a post structure, a ground reinforcement pile with a dual or triple spiral structure (spiral bolts) provided as a bolt, a ground anchor, and a twisted flat steel can be utilized to stably fix the post structure to the ground.
지반의 지지력을 보강하여 강화하기 위하여, 지반보강용 스파이럴볼트, 파일을 삽입 후 추가로 몰타르를 주입하는 방식이 공지되어 있다. 즉, 암반층이나 큰 자갈층이 포함된 지반 등과 같은 암반지반의 경우 굴착기를 이용하여 암반 지반을 굴착하고, 굴착공에 지반보강용 파일을 삽입한 후 몰타르를 타설하게 된다. 여기서, 사토질이나 점토질의 경질지반이 아닌 자갈이 포함되거나 다짐이 불충분한 성토 지반 등과 같은 연약지반인 경우 단순한 지반보강용 파일만으로는 지지력이 부족할 수 있게 된다. 이때, 포스트구조물의 지주를 안정적으로 고정하기 위하여 볼트와 지중앵커, 트위스트 형성된 평철로 제공되는 이중, 삼중 나선구조의 지반보강용 파일(Spiral Bolt)을 이용하여 지반에 포스트구조물을 안정적으로 고정할 수 있다.