BRIDGE RECONSTRUCTION METHOD USING TRANSVERSE RELOCATION OF EXISTING REINFORCED-CONCRETE SOLID SUPERSTRUCTURE
FIELD: construction.SUBSTANCE: first, a collar beam is extended on one of the sides of the existing supports of the existing superstructure; after that, some part of the existing superstructure is cut (along the whole superstructure); then, the existing superstructure is lifted and rollers are installed under its lower flange; after that, jacks are installed and the existing superstructure is relocated across the existing supports of the bridge in the direction of the extended collar beam; then, rollers are removed and traffic flow is arranged on the relocated existing superstructure; after that, new supports are installed, which do not coincide in a plan view with the existing supports; after that, a new superstructure is installed on new supports; then, the existing superstructure and the existing supports are removed and the new bride superstructure is provided with road pavement.EFFECT: improved method.6 dwg
Способ реконструкции пролетного строения с использованием поперечной передвижки существующего железобетонного монолитного пролетного строения заключается в следующем: предварительно уширяют ригель с одной из сторон существующих опор существующего пролетного строения, после этого отрезают часть существующего пролетного строения (вдоль всего пролетного строения), затем поднимают существующее пролетное строение и под его нижний пояс устанавливают катки, после чего устанавливают домкраты и домкратами передвигают существующее пролетное строение поперек существующих опор моста в направлении уширенного ригеля, затем снимают катки и организовывают движение транспорта на передвинутом существующем пролетном строении, после чего устанавливают новые опоры, которые в плане не совпадают с существующими опорами, после этого устанавливают новое пролетное строение на новые опоры, затем демонтируют существующее пролетное строение и существующие опоры и обустраивают дорожное полотно нового пролетного строения моста. 6 ил.
BRIDGE RECONSTRUCTION METHOD USING TRANSVERSE RELOCATION OF EXISTING REINFORCED-CONCRETE SOLID SUPERSTRUCTURE
FIELD: construction.SUBSTANCE: first, a collar beam is extended on one of the sides of the existing supports of the existing superstructure; after that, some part of the existing superstructure is cut (along the whole superstructure); then, the existing superstructure is lifted and rollers are installed under its lower flange; after that, jacks are installed and the existing superstructure is relocated across the existing supports of the bridge in the direction of the extended collar beam; then, rollers are removed and traffic flow is arranged on the relocated existing superstructure; after that, new supports are installed, which do not coincide in a plan view with the existing supports; after that, a new superstructure is installed on new supports; then, the existing superstructure and the existing supports are removed and the new bride superstructure is provided with road pavement.EFFECT: improved method.6 dwg
Способ реконструкции пролетного строения с использованием поперечной передвижки существующего железобетонного монолитного пролетного строения заключается в следующем: предварительно уширяют ригель с одной из сторон существующих опор существующего пролетного строения, после этого отрезают часть существующего пролетного строения (вдоль всего пролетного строения), затем поднимают существующее пролетное строение и под его нижний пояс устанавливают катки, после чего устанавливают домкраты и домкратами передвигают существующее пролетное строение поперек существующих опор моста в направлении уширенного ригеля, затем снимают катки и организовывают движение транспорта на передвинутом существующем пролетном строении, после чего устанавливают новые опоры, которые в плане не совпадают с существующими опорами, после этого устанавливают новое пролетное строение на новые опоры, затем демонтируют существующее пролетное строение и существующие опоры и обустраивают дорожное полотно нового пролетного строения моста. 6 ил.
BRIDGE RECONSTRUCTION METHOD USING TRANSVERSE RELOCATION OF EXISTING REINFORCED-CONCRETE SOLID SUPERSTRUCTURE
СПОСОБ РЕКОНСТРУКЦИИ МОСТА С ИСПОЛЬЗОВАНИЕМ ПОПЕРЕЧНОЙ ПЕРЕДВИЖКИ СУЩЕСТВУЮЩЕГО ЖЕЛЕЗОБЕТОННОГО МОНОЛИТНОГО ПРОЛЕТНОГО СТРОЕНИЯ
SAKHAROVA INNA DMITRIEVNA (author) / KAZARJAN VIL GEL M JUR EVICH (author)
2015-07-20
Patent
Electronic Resource
Russian
IPC:
E01D
BRIDGES
,
Brücken
METHOD FOR TRANSVERSE RELOCATION OF BRIDGE SUPERSTRUCTURE FOR EXTENDED COLLAR BEAM
European Patent Office | 2015
|