A platform for research: civil engineering, architecture and urbanism
WATER SUPPLY SYSTEM OPTIMIZATION METHOD
FIELD: engines and pumps.SUBSTANCE: invention relates to water supply systems field. Method consists in fact, that water pressure at pump outlet is measured, comparing measured pressure with preset value and minimizing of measured pressure deviation from preset value by acting on pump electric motor speed. Pump (1) used is set (2) of parallel installed pumps, wherein: a) creating water supply system hydraulic model, including pump (1), system of pipelines (3), supplying water to pump inlet, and system of pipelines (4) connected to pump (1) outlet and supplying water into distribution network (5), performing water supply system hydraulic simulation, determining required water pressurevalue at pump outlet under condition of required headproviding at allconsumers (6),, and determining water supply system maintenance costsover life cycle, adopted for 10 years, whereand– are investment and operating activity costs, b) in distribution networkseparating zones (7–10) with required headat inlet ofzone,, where, c) reducing required water head value at pump outlet tounder condition to ensure required heatof zone=2 consumers and determining water supply system maintenance costsover life cycle, whereand– are investment and operating activity costs,– costs of individual booster pumping plant/plants maintenance over life cycle, providing increase of heads at zone=1 consumers fromto, d) repeating step c), reducing required value of water heads at pump outlet tounder conditions of ensuring required pressureat zoneconsumers, and determining water supply system maintenance costsover life cycle, whereand– are investment and operating activity costs,– costs of individual booster pumping plant/plants maintenance over life cycle, providing increase of heads at zoneconsumers fromto, and zonefromto, where=, e) determining required value of water headat pump outlet under condition of providing headat zoneinlet and determining lossesfor water supply system maintenance over life cycle, whereand– are investment and operating activity costs,– costs of individual booster pumping plant/plants maintenance over life cycle, providing increase of heads at zoneconsumers fromto, f) forming pluralityof costsvalues pairs of water supply system maintenance over life cycle and corresponding to them arguments, required values of water headsat pump outlet, where, define function, which in pointstakes values, as close as possible to valuesor equal to these values, and water head at pump outlet specified value is determined by determining head, at which function oftakes minimum values at.EFFECT: enabling maintenance costs reduction.1 cl, 3 dwg
Изобретение относится к области систем водоснабжения. Способ состоит в том, что измеряют напор воды на выходе насоса, сравнивают измеренный напор с заданным значением и минимизируют отклонение измеряемого напора от заданного значения путем воздействия на частоту вращения электродвигателя насоса. В качестве насоса (1) применяют группу (2) параллельно установленных насосов, при этом: а) создают гидравлическую модель системы водоснабжения, включающую насос (1), систему трубопроводов (3), подводящих воду к входу насоса, и систему трубопроводов (4), присоединенных к выходу насоса (1) и подающих воду в распределительную сеть (5), проводят гидравлическое моделирование системы водоснабжения, определяют требуемое значение напораводы на выходе насоса при условии обеспечения требуемого напорау всехпотребителей (6),, и определяют затратына эксплуатационное содержание системы водоснабжения за жизненный цикл, принимаемый за 10 лет, гдеи- затраты на инвестиционную и операционную деятельность, б) выделяют в распределительной сетизон (7-10) с требуемым напоромна входе взону,, где, в) снижают требуемое значение напора воды на выходе насоса доиз условия обеспечения требуемого напорапотребителей зоны=2 и определяют затратына эксплуатационное содержание системы водоснабжения за жизненный цикл, гдеи- затраты на инвестиционную и операционную деятельность,- затраты на эксплуатационное содержание индивидуальной повысительной насосной станции/станций за жизненный цикл, обеспечивающей повышение напоров потребителей зоны=1 сдо, г) повторяют этап в), снижая требуемое значение напоров воды на выходе насоса доиз условий обеспечения требуемых напоровпотребителей
WATER SUPPLY SYSTEM OPTIMIZATION METHOD
FIELD: engines and pumps.SUBSTANCE: invention relates to water supply systems field. Method consists in fact, that water pressure at pump outlet is measured, comparing measured pressure with preset value and minimizing of measured pressure deviation from preset value by acting on pump electric motor speed. Pump (1) used is set (2) of parallel installed pumps, wherein: a) creating water supply system hydraulic model, including pump (1), system of pipelines (3), supplying water to pump inlet, and system of pipelines (4) connected to pump (1) outlet and supplying water into distribution network (5), performing water supply system hydraulic simulation, determining required water pressurevalue at pump outlet under condition of required headproviding at allconsumers (6),, and determining water supply system maintenance costsover life cycle, adopted for 10 years, whereand– are investment and operating activity costs, b) in distribution networkseparating zones (7–10) with required headat inlet ofzone,, where, c) reducing required water head value at pump outlet tounder condition to ensure required heatof zone=2 consumers and determining water supply system maintenance costsover life cycle, whereand– are investment and operating activity costs,– costs of individual booster pumping plant/plants maintenance over life cycle, providing increase of heads at zone=1 consumers fromto, d) repeating step c), reducing required value of water heads at pump outlet tounder conditions of ensuring required pressureat zoneconsumers, and determining water supply system maintenance costsover life cycle, whereand– are investment and operating activity costs,– costs of individual booster pumping plant/plants maintenance over life cycle, providing increase of heads at zoneconsumers fromto, and zonefromto, where=, e) determining required value of water headat pump outlet under condition of providing headat zoneinlet and determining lossesfor water supply system maintenance over life cycle, whereand– are investment and operating activity costs,– costs of individual booster pumping plant/plants maintenance over life cycle, providing increase of heads at zoneconsumers fromto, f) forming pluralityof costsvalues pairs of water supply system maintenance over life cycle and corresponding to them arguments, required values of water headsat pump outlet, where, define function, which in pointstakes values, as close as possible to valuesor equal to these values, and water head at pump outlet specified value is determined by determining head, at which function oftakes minimum values at.EFFECT: enabling maintenance costs reduction.1 cl, 3 dwg
Изобретение относится к области систем водоснабжения. Способ состоит в том, что измеряют напор воды на выходе насоса, сравнивают измеренный напор с заданным значением и минимизируют отклонение измеряемого напора от заданного значения путем воздействия на частоту вращения электродвигателя насоса. В качестве насоса (1) применяют группу (2) параллельно установленных насосов, при этом: а) создают гидравлическую модель системы водоснабжения, включающую насос (1), систему трубопроводов (3), подводящих воду к входу насоса, и систему трубопроводов (4), присоединенных к выходу насоса (1) и подающих воду в распределительную сеть (5), проводят гидравлическое моделирование системы водоснабжения, определяют требуемое значение напораводы на выходе насоса при условии обеспечения требуемого напорау всехпотребителей (6),, и определяют затратына эксплуатационное содержание системы водоснабжения за жизненный цикл, принимаемый за 10 лет, гдеи- затраты на инвестиционную и операционную деятельность, б) выделяют в распределительной сетизон (7-10) с требуемым напоромна входе взону,, где, в) снижают требуемое значение напора воды на выходе насоса доиз условия обеспечения требуемого напорапотребителей зоны=2 и определяют затратына эксплуатационное содержание системы водоснабжения за жизненный цикл, гдеи- затраты на инвестиционную и операционную деятельность,- затраты на эксплуатационное содержание индивидуальной повысительной насосной станции/станций за жизненный цикл, обеспечивающей повышение напоров потребителей зоны=1 сдо, г) повторяют этап в), снижая требуемое значение напоров воды на выходе насоса доиз условий обеспечения требуемых напоровпотребителей
WATER SUPPLY SYSTEM OPTIMIZATION METHOD
СПОСОБ ОПТИМИЗАЦИИ СИСТЕМЫ ВОДОСНАБЖЕНИЯ
IGNATCHIK VIKTOR SERGEEVICH (author) / IGNATCHIK SVETLANA YUREVNA (author) / IVANOVSKIJ VLADIMIR SERGEEVICH (author) / PUTILIN PAVEL ALEKSANDROVICH (author) / SARKISOV SERGEJ VLADIMIROVICH (author) / KUZNETSOVA NATALIYA VIKTOROVNA (author) / OBVINTSEV VLADIMIR ALEKSEEVICH (author)
2017-01-11
Patent
Electronic Resource
Russian
IPC:
E03B
Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser
,
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
Water supply system optimization method and adjustment method for community water supply system
European Patent Office | 2021
|Optimization of Water Supply System Operation
Online Contents | 1996
|Optimization of Water Supply System Operation
British Library Online Contents | 1996
|