METHOD OF AUGER PILE CONSTRUCTION
FIELD: construction.SUBSTANCE: invention can be used for manufacturing auger piles with shoring of existing foundations. The method for constructing an auger pile comprises drilling a well, filling it with a concrete mixture and putting the soil of the well walls under pressure. After the well is filled with the concrete mixture, a conductor pipe is installed from above, made with an elastic shell around the circumference to seal the annulus of the well; the compressed air or water is fed into the shell at a pressure of up to 0.5 MPa by means of an autonomous packer until the shell size increases, exceeding the annulus by 20-30%. The soil of the well walls is put under pressure by feeding the concrete mixture under an excess pressure of 0.2-0.3 MPa for 5-10 minutes through the conductor pipe, and then immersing it in the concrete mixture of the reinforcement cage.EFFECT: increased bearing capacity of the pile by effective compaction of the well walls, reduced consumption of the concrete mixture due to elimination of leakage during the pressing process, increased labour productivity.1 dwg
Изобретение относится к строительству и может быть использовано для изготовления буронабивных свай при усилении существующих фундаментов. Способ сооружения буронабивной сваи включает бурение скважины, заполнение ее бетонной смесью и опрессовку грунта стенок скважины. После заполнения бетонной смесью скважины сверху устанавливают трубу-кондуктор, выполненную с эластичной оболочкой по окружности для герметизации затрубного пространства скважины, подают в оболочку сжатый воздух или воду под давлением до 0,5 МПа посредством автономного пакера до увеличения размера оболочки, превышающего затрубное пространство на 20-30%. Производят опрессовку грунта стенок скважины путем подачи бетонной смеси под избыточным давлением 0,2-0,3 МПа в течение 5-10 мин через трубу-кондуктор, с последующим погружением в бетонную смесь арматурного каркаса. Технический результат состоит в повышении несущей способности сваи путем эффективного уплотнения стенок грунта скважины, снижении расхода бетонной смеси за счет исключения утечки в процессе опресовки, повышении производительности труда. 1 ил.
METHOD OF AUGER PILE CONSTRUCTION
FIELD: construction.SUBSTANCE: invention can be used for manufacturing auger piles with shoring of existing foundations. The method for constructing an auger pile comprises drilling a well, filling it with a concrete mixture and putting the soil of the well walls under pressure. After the well is filled with the concrete mixture, a conductor pipe is installed from above, made with an elastic shell around the circumference to seal the annulus of the well; the compressed air or water is fed into the shell at a pressure of up to 0.5 MPa by means of an autonomous packer until the shell size increases, exceeding the annulus by 20-30%. The soil of the well walls is put under pressure by feeding the concrete mixture under an excess pressure of 0.2-0.3 MPa for 5-10 minutes through the conductor pipe, and then immersing it in the concrete mixture of the reinforcement cage.EFFECT: increased bearing capacity of the pile by effective compaction of the well walls, reduced consumption of the concrete mixture due to elimination of leakage during the pressing process, increased labour productivity.1 dwg
Изобретение относится к строительству и может быть использовано для изготовления буронабивных свай при усилении существующих фундаментов. Способ сооружения буронабивной сваи включает бурение скважины, заполнение ее бетонной смесью и опрессовку грунта стенок скважины. После заполнения бетонной смесью скважины сверху устанавливают трубу-кондуктор, выполненную с эластичной оболочкой по окружности для герметизации затрубного пространства скважины, подают в оболочку сжатый воздух или воду под давлением до 0,5 МПа посредством автономного пакера до увеличения размера оболочки, превышающего затрубное пространство на 20-30%. Производят опрессовку грунта стенок скважины путем подачи бетонной смеси под избыточным давлением 0,2-0,3 МПа в течение 5-10 мин через трубу-кондуктор, с последующим погружением в бетонную смесь арматурного каркаса. Технический результат состоит в повышении несущей способности сваи путем эффективного уплотнения стенок грунта скважины, снижении расхода бетонной смеси за счет исключения утечки в процессе опресовки, повышении производительности труда. 1 ил.
METHOD OF AUGER PILE CONSTRUCTION
СПОСОБ СООРУЖЕНИЯ БУРОНАБИВНОЙ СВАИ
SHULYATEV OLEG ALEKSANDROVICH (author) / POSPEKHOV VALENTIN SERGEEVICH (author) / POPSUENKO IVAN KONSTANTINOVICH (author) / EVLASHKIN OLEG STANISLAVOVICH (author) / MYSHINSKIJ VIKTOR EVGENEVICH (author) / GAPONENKO DMITRIJ VALENTINOVICH (author) / CHIBISOV EGOR ALEKSEEVICH (author) / BALMAEV ALEKSANDR VLADIMIROVICH (author)
2017-11-03
Patent
Electronic Resource
Russian
IPC:
E02D
FOUNDATIONS
,
Gründungen
PILE CONSTRUCTION METHOD USING HELIX AUGER AND PILE GROUTING