METHOD FOR WIND TURBINE OPERATION
FIELD: power industry.SUBSTANCE: wind power plant having a foundation (210) configured to be mounted on the ground (10) or to the ground (10) having a ground level and a tower (102) that is located on the foundation (210). The foundation (210) has a foundation plate (211) and a foundation base (212) on the foundation plate (211) located above the ground level. The foundation plate (211) is located below the ground level. A connecting element (213, 214) for the pulling cables is provided on the base member (212), having a plurality of apertures (213a, 214a) for receiving the pulling cables (230). The pulling cables (230) are tensioned from the underside (213b, 214b) of the connecting element (213, 214) by means of the head (240) of the pulling cables. The foundation plate (211) and the base plinth (212) are cast in one piece from the concrete poured in place. The distance between the upper side of the foundation plate and the underside of the connecting element for the pulling cables is of a size providing enough space for the workers to pull the pulling cables.EFFECT: improvement of the foundation of the wind power plant.6 cl, 8 dwg
Изобретение относится к ветроэнергетической установке и способу возведения ветроэнергетической установки. Ветроэнергетическая установка, имеющая фундамент (210), выполненный с возможностью установки на грунт (10) или в грунт (10), имеющий уровень грунта, и башню (102), которая размещена на фундаменте (210), при этом фундамент (210) имеет фундаментную плиту (211) и фундаментный цоколь (212) на фундаментной плите (211), расположенный выше уровня грунта, при этом фундаментная плита (211) распложена ниже уровня грунта, при этом на фундаментном цоколе (212) предусмотрен соединительный элемент (213, 214) для стягивающих тросов, имеющий множество отверстий (213a, 214a) для размещения стягивающих тросов (230), при этом стягивающие тросы (230) натянуты с нижней стороны (213b, 214b) соединительного элемента (213, 214) посредством головки (240) стягивающих тросов, при этом фундаментная плита (211) и фундаментный цоколь (212) отлиты цельно из залитого на месте бетона, при этом расстояние между верхней стороной фундаментной плиты и нижней стороной соединительного элемента для стягивающих тросов имеет величину, обеспечивающую рабочим достаточно места для натяжения стягивающих тросов. Изобретение направлено на улучшение фундамента ветроэнергетической установки 2 н. и 4 з.п. ф-лы, 8 ил.
METHOD FOR WIND TURBINE OPERATION
FIELD: power industry.SUBSTANCE: wind power plant having a foundation (210) configured to be mounted on the ground (10) or to the ground (10) having a ground level and a tower (102) that is located on the foundation (210). The foundation (210) has a foundation plate (211) and a foundation base (212) on the foundation plate (211) located above the ground level. The foundation plate (211) is located below the ground level. A connecting element (213, 214) for the pulling cables is provided on the base member (212), having a plurality of apertures (213a, 214a) for receiving the pulling cables (230). The pulling cables (230) are tensioned from the underside (213b, 214b) of the connecting element (213, 214) by means of the head (240) of the pulling cables. The foundation plate (211) and the base plinth (212) are cast in one piece from the concrete poured in place. The distance between the upper side of the foundation plate and the underside of the connecting element for the pulling cables is of a size providing enough space for the workers to pull the pulling cables.EFFECT: improvement of the foundation of the wind power plant.6 cl, 8 dwg
Изобретение относится к ветроэнергетической установке и способу возведения ветроэнергетической установки. Ветроэнергетическая установка, имеющая фундамент (210), выполненный с возможностью установки на грунт (10) или в грунт (10), имеющий уровень грунта, и башню (102), которая размещена на фундаменте (210), при этом фундамент (210) имеет фундаментную плиту (211) и фундаментный цоколь (212) на фундаментной плите (211), расположенный выше уровня грунта, при этом фундаментная плита (211) распложена ниже уровня грунта, при этом на фундаментном цоколе (212) предусмотрен соединительный элемент (213, 214) для стягивающих тросов, имеющий множество отверстий (213a, 214a) для размещения стягивающих тросов (230), при этом стягивающие тросы (230) натянуты с нижней стороны (213b, 214b) соединительного элемента (213, 214) посредством головки (240) стягивающих тросов, при этом фундаментная плита (211) и фундаментный цоколь (212) отлиты цельно из залитого на месте бетона, при этом расстояние между верхней стороной фундаментной плиты и нижней стороной соединительного элемента для стягивающих тросов имеет величину, обеспечивающую рабочим достаточно места для натяжения стягивающих тросов. Изобретение направлено на улучшение фундамента ветроэнергетической установки 2 н. и 4 з.п. ф-лы, 8 ил.
METHOD FOR WIND TURBINE OPERATION
ФУНДАМЕНТ ВЕТРОЭНЕРГЕТИЧЕСКОЙ УСТАНОВКИ
KOORDES TOMAS (author) / POLLMAN FRANK (author) / GRESS ALEKSANDER (author)
2018-01-09
Patent
Electronic Resource
Russian
WIND TURBINE TOWER AND WIND TURBINE AND METHOD FOR ASSEMBLING WIND TURBINE TOWER
European Patent Office | 2018