A platform for research: civil engineering, architecture and urbanism
QUICK-ERECT SHIELD FOR COASTAL DAM IN EVENT OF RIVER FLOOD
FIELD: construction.SUBSTANCE: invention relates to flood prevention techniques. Quick-erecting shield for the coastal dam in case of flood contains a coastal dam with the possibility of closing the main river bed. Coastal dam consists of three parts: two identical parts are located along the banks of the river, along its main channel, and the third part, the main part, rigidly connects these two parts perpendicular to the main river bed. Main part of the coastal dam consists of two oppositely located permanent shields, made in a rectangular shape and rigidly connected to the parts of the dam located along the banks of the river, and in the opening formed by the permanent shields, there is a central rectangular quick-erect shield, movably connected by means of guides, e.g. tongue and groove type, with permanent shields and to be fixed to them by means of a locking mechanism made, for example, in the form of spring-loaded movable pins, whose housing is fixed to the permanent shields, and there are holes for fixing the movable pins on the quick-erect shield. Mechanism for fixing the quick-erect shield is made with an automatic drive, which is controlled from the control unit, located in the control compartment, located in the coastal dam. On the permanent shields, to control the installation of the quick-erect shield, video cameras are fixed. Quick-erect shield is installed before the beginning of the river flood with the help of lifting devices or a helicopter in such a way that the "H" height for the passage of low-tonnage vessels remains until the beginning of the flood. Installation of the quick-erect panel is controlled from the command post located in the control compartment, and a video terminal that is connected by mobile communication with the control compartment and duplicates signals from the video cameras is installed on the helicopter for adjusting the installation of the central shield. On the quick-erect shield, in its middle part, the pressure sensor of the water pressure is fixed, the output of which is connected along the lines of communication with the strain gauge, located in the control unit, located in the control compartment and on the permanent shields there are throttle valves installed with mechanisms for regulating their bores, which are controlled from the flood control unit, while the control unit located in the control compartment is equipped with a warning system which operates at the initial stage of an emergency situation and is triggered by the maximum value of the signal coming from the load cell fixed to the quick-erect shield, in its middle part; in this case, the operator on duty, staying in the control compartment, activates a mechanism for regulating the bores of throttling valves installed on permanent shields, the maximum value of their bores, which leads to a decrease in the water pressure on the central quick-erect shield.EFFECT: increased efficiency of measures to prevent the consequences of flooding.1 cl, 1 dwg
Изобретение относится к технике предотвращения наводнений. Быстровозводимый щит для береговой дамбы при наводнении содержит береговую дамбу с возможностью перекрытия основного русла реки. Береговая дамба состоит из трех частей: две идентичные части расположены по берегам реки, вдоль ее основного русла, а третья, основная часть, жестко соединяет эти две части перпендикулярно основному руслу реки. Основная часть береговой дамбы состоит из двух оппозитно расположенных постоянных щитов, выполненных прямоугольной формы и жестко соединенных с частями дамбы, расположенными по берегам реки, а в проеме, образованном постоянными щитами, расположен центральный прямоугольный быстровозводимый щит, подвижно соединенный посредством направляющих, например, типа «паз-шип», с постоянными щитами и фиксируемый на них с помощью механизма фиксации, выполненного, например, в виде подпружиненных подвижных штырей, корпус которых закреплен на постоянных щитах, а на быстровозводимом щите выполнены отверстия для фиксации подвижных штырей. Механизм фиксации быстровозводимого щита выполнен с автоматическим приводом, управление которым осуществляется с блока управления, находящегося в кабине управления, размещенной в береговой дамбе. На постоянных щитах, для управления установкой быстровозводимого щита, закреплены видеокамеры. Быстровозводимый щит устанавливается перед началом паводка в реке с помощью подъемных устройств или вертолета таким образом, чтобы сохранялся проем высотой «Н» для прохода малотоннажных судов до начала паводка. Управление установкой быстровозводимого щита осуществляется с командного пункта, размещенного в кабине управления, а на вертолете установлен видеотерминал, связанный мобильной связью с кабиной управления и дублирующий сигналы с видеокамер, для корректировки установкой центрального щита. На быстровозводимом щите, в его средней части, закреплен тензодатчик давления воды, выход с которого связан по линиям связи с тензоусилителем, находящимся в блоке управления, размещенном в кабине управления, а на постоянных щитах установлены дроссельные заслонки с механизмами регулирования их проходных сечений, управление которыми осуществляется с блока управления наводнением, при этом блок управления, размещенный в кабине управления, снабжен системой оповещения начальной фазы возникновения чрезвычайной ситуации, которая срабатывает от предельной величины сигнала, поступающего с тензодатчика, закрепленного на быстровозводимом щите, в его средней части; в этом случае, дежурный оператор, находящийся в кабине управления, включает механизм регулирования проходных сечений дроссельных заслонок, установленных на постоянных щитах, на максимальную величину их проходных сечений, что приводит к снижению давления воды на центральный быстровозводимый щит. Технический результат - повышение эффективности мероприятий по предотвращению последствий наводнения. 1 ил.
QUICK-ERECT SHIELD FOR COASTAL DAM IN EVENT OF RIVER FLOOD
FIELD: construction.SUBSTANCE: invention relates to flood prevention techniques. Quick-erecting shield for the coastal dam in case of flood contains a coastal dam with the possibility of closing the main river bed. Coastal dam consists of three parts: two identical parts are located along the banks of the river, along its main channel, and the third part, the main part, rigidly connects these two parts perpendicular to the main river bed. Main part of the coastal dam consists of two oppositely located permanent shields, made in a rectangular shape and rigidly connected to the parts of the dam located along the banks of the river, and in the opening formed by the permanent shields, there is a central rectangular quick-erect shield, movably connected by means of guides, e.g. tongue and groove type, with permanent shields and to be fixed to them by means of a locking mechanism made, for example, in the form of spring-loaded movable pins, whose housing is fixed to the permanent shields, and there are holes for fixing the movable pins on the quick-erect shield. Mechanism for fixing the quick-erect shield is made with an automatic drive, which is controlled from the control unit, located in the control compartment, located in the coastal dam. On the permanent shields, to control the installation of the quick-erect shield, video cameras are fixed. Quick-erect shield is installed before the beginning of the river flood with the help of lifting devices or a helicopter in such a way that the "H" height for the passage of low-tonnage vessels remains until the beginning of the flood. Installation of the quick-erect panel is controlled from the command post located in the control compartment, and a video terminal that is connected by mobile communication with the control compartment and duplicates signals from the video cameras is installed on the helicopter for adjusting the installation of the central shield. On the quick-erect shield, in its middle part, the pressure sensor of the water pressure is fixed, the output of which is connected along the lines of communication with the strain gauge, located in the control unit, located in the control compartment and on the permanent shields there are throttle valves installed with mechanisms for regulating their bores, which are controlled from the flood control unit, while the control unit located in the control compartment is equipped with a warning system which operates at the initial stage of an emergency situation and is triggered by the maximum value of the signal coming from the load cell fixed to the quick-erect shield, in its middle part; in this case, the operator on duty, staying in the control compartment, activates a mechanism for regulating the bores of throttling valves installed on permanent shields, the maximum value of their bores, which leads to a decrease in the water pressure on the central quick-erect shield.EFFECT: increased efficiency of measures to prevent the consequences of flooding.1 cl, 1 dwg
Изобретение относится к технике предотвращения наводнений. Быстровозводимый щит для береговой дамбы при наводнении содержит береговую дамбу с возможностью перекрытия основного русла реки. Береговая дамба состоит из трех частей: две идентичные части расположены по берегам реки, вдоль ее основного русла, а третья, основная часть, жестко соединяет эти две части перпендикулярно основному руслу реки. Основная часть береговой дамбы состоит из двух оппозитно расположенных постоянных щитов, выполненных прямоугольной формы и жестко соединенных с частями дамбы, расположенными по берегам реки, а в проеме, образованном постоянными щитами, расположен центральный прямоугольный быстровозводимый щит, подвижно соединенный посредством направляющих, например, типа «паз-шип», с постоянными щитами и фиксируемый на них с помощью механизма фиксации, выполненного, например, в виде подпружиненных подвижных штырей, корпус которых закреплен на постоянных щитах, а на быстровозводимом щите выполнены отверстия для фиксации подвижных штырей. Механизм фиксации быстровозводимого щита выполнен с автоматическим приводом, управление которым осуществляется с блока управления, находящегося в кабине управления, размещенной в береговой дамбе. На постоянных щитах, для управления установкой быстровозводимого щита, закреплены видеокамеры. Быстровозводимый щит устанавливается перед началом паводка в реке с помощью подъемных устройств или вертолета таким образом, чтобы сохранялся проем высотой «Н» для прохода малотоннажных судов до начала паводка. Управление установкой быстровозводимого щита осуществляется с командного пункта, размещенного в кабине управления, а на вертолете установлен видеотерминал, связанный мобильной связью с кабиной управления и дублирующий сигналы с видеокамер, для корректировки установкой центрального щита. На быстровозводимом щите, в его средней части, закреплен тензодатчик давления воды, выход с которого связан по линиям связи с тензоусилителем, находящимся в блоке управления, размещенном в кабине управления, а на постоянных щитах установлены дроссельные заслонки с механизмами регулирования их проходных сечений, управление которыми осуществляется с блока управления наводнением, при этом блок управления, размещенный в кабине управления, снабжен системой оповещения начальной фазы возникновения чрезвычайной ситуации, которая срабатывает от предельной величины сигнала, поступающего с тензодатчика, закрепленного на быстровозводимом щите, в его средней части; в этом случае, дежурный оператор, находящийся в кабине управления, включает механизм регулирования проходных сечений дроссельных заслонок, установленных на постоянных щитах, на максимальную величину их проходных сечений, что приводит к снижению давления воды на центральный быстровозводимый щит. Технический результат - повышение эффективности мероприятий по предотвращению последствий наводнения. 1 ил.
QUICK-ERECT SHIELD FOR COASTAL DAM IN EVENT OF RIVER FLOOD
БЫСТРОВОЗВОДИМЫЙ ЩИТ ДЛЯ БЕРЕГОВОЙ ДАМБЫ ПРИ НАВОДНЕНИИ
KOCHETOV OLEG SAVELEVICH (author)
2018-05-03
Patent
Electronic Resource
Russian
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
QUICK-ERECT SHIELD FOR COASTAL DAM IN EVENT OF RIVER FLOOD
European Patent Office | 2018
|QUICK-ERECT SHIELD FOR COASTAL DAM IN EVENT OF RIVER FLOOD
European Patent Office | 2018
|Low cost, easy to erect flood barriers
British Library Online Contents | 2009