METHOD OF THE PILE FOUNDATION ARRANGEMENT IN THE PERMAFROST SOIL
FIELD: construction.SUBSTANCE: invention relates to the field of construction, namely to foundations erected in permafrost soils for use as a support in the soil-cement massif foundation for various easily erected structures, bridges and pipelines, gas pipelines, temporary household facilities, low-rise residential buildings. Method of the pile foundation in permafrost constructing is implemented by drilling a well according to the jet technology with the simultaneous soil thawing and filling the well with a ground-cement mixture with formation of the cement-ground column after its curing. Drilling of the well is carried out to a depth below the soil thawing boundary, and after the well filling with the ground-cement mixture the reinforcing tubular element with the attached to the end elastic shell corresponding to the pile diameter are immersed into the well to the soil thawing boundary. Mixture of components of polyol and isocyanate, taken in the ratio 1:1.2–1.7, is poured into the elastic shell through the tubular element, with an expansion coefficient of 4–12 and holding at a temperature of 8–35 °C for at least two days with the formation on the pile heel of a heat insulation layer from the high-strength polyurethane foam.EFFECT: technical result consists in simplification of the pile foundation installation method in permafrost soil due to the possibility of using jet technology while reducing the soil subsidence, provision of the heat-insulating layer in the ground-cement pile body.4 cl, 2 ex, 8 dwg
Изобретение относится к области строительства, а именно к фундаментам, возводимым в многолетнемерзлом грунте для использования в качестве опоры в основании грунтоцементного массива для различных легковозводимых сооружений, мостов и трубопроводов, газопроводов, временных бытовых сооружений, малоэтажных жилых домов. Способ устройства свайного фундамента в многолетнемерзлом грунте осуществляют путем бурения скважины по струйной технологии с одновременным оттаиванием грунта и заполнения скважины грунтоцементной смесью с образованием после ее затвердевания грунтоцементной колонны. Бурение скважины осуществляют на глубину ниже границы оттаивания грунта, а после заполнения скважины грунтоцементной смесью в скважину до границы оттаивания грунта погружают армирующий трубчатый элемент с закрепленной на конце эластичной оболочкой размером, соответствующим диаметру сваи. В эластичную оболочку через трубчатый элемент заливают смесь компонентов полиольного и изоционата, взятых в соотношении 1:1,2-1,7, с коэффициентом расширения 4-12 и выдерживают при температуре 8-35°С в течение не менее двух суток с образованием на пяте сваи теплоизоляционного слоя из высокопрочного пенополиуретана. Технический результат состоит в упрощении способа устройства свайного фундамента в многолетнемерзлом грунте за счет возможности использования струйной технологии при снижении просадки грунта, обеспечении теплоизолирующего слоя в теле грунтоцементной сваи. 3 з.п. ф-лы, 2 пр., 8 ил.
METHOD OF THE PILE FOUNDATION ARRANGEMENT IN THE PERMAFROST SOIL
FIELD: construction.SUBSTANCE: invention relates to the field of construction, namely to foundations erected in permafrost soils for use as a support in the soil-cement massif foundation for various easily erected structures, bridges and pipelines, gas pipelines, temporary household facilities, low-rise residential buildings. Method of the pile foundation in permafrost constructing is implemented by drilling a well according to the jet technology with the simultaneous soil thawing and filling the well with a ground-cement mixture with formation of the cement-ground column after its curing. Drilling of the well is carried out to a depth below the soil thawing boundary, and after the well filling with the ground-cement mixture the reinforcing tubular element with the attached to the end elastic shell corresponding to the pile diameter are immersed into the well to the soil thawing boundary. Mixture of components of polyol and isocyanate, taken in the ratio 1:1.2–1.7, is poured into the elastic shell through the tubular element, with an expansion coefficient of 4–12 and holding at a temperature of 8–35 °C for at least two days with the formation on the pile heel of a heat insulation layer from the high-strength polyurethane foam.EFFECT: technical result consists in simplification of the pile foundation installation method in permafrost soil due to the possibility of using jet technology while reducing the soil subsidence, provision of the heat-insulating layer in the ground-cement pile body.4 cl, 2 ex, 8 dwg
Изобретение относится к области строительства, а именно к фундаментам, возводимым в многолетнемерзлом грунте для использования в качестве опоры в основании грунтоцементного массива для различных легковозводимых сооружений, мостов и трубопроводов, газопроводов, временных бытовых сооружений, малоэтажных жилых домов. Способ устройства свайного фундамента в многолетнемерзлом грунте осуществляют путем бурения скважины по струйной технологии с одновременным оттаиванием грунта и заполнения скважины грунтоцементной смесью с образованием после ее затвердевания грунтоцементной колонны. Бурение скважины осуществляют на глубину ниже границы оттаивания грунта, а после заполнения скважины грунтоцементной смесью в скважину до границы оттаивания грунта погружают армирующий трубчатый элемент с закрепленной на конце эластичной оболочкой размером, соответствующим диаметру сваи. В эластичную оболочку через трубчатый элемент заливают смесь компонентов полиольного и изоционата, взятых в соотношении 1:1,2-1,7, с коэффициентом расширения 4-12 и выдерживают при температуре 8-35°С в течение не менее двух суток с образованием на пяте сваи теплоизоляционного слоя из высокопрочного пенополиуретана. Технический результат состоит в упрощении способа устройства свайного фундамента в многолетнемерзлом грунте за счет возможности использования струйной технологии при снижении просадки грунта, обеспечении теплоизолирующего слоя в теле грунтоцементной сваи. 3 з.п. ф-лы, 2 пр., 8 ил.
METHOD OF THE PILE FOUNDATION ARRANGEMENT IN THE PERMAFROST SOIL
Способ устройства свайного фундамента в многолетнемерзлом грунте
MODENOV SERGEJ VLADIMIROVICH (author) / SHISHKIN VLADIMIR YAKOVLEVICH (author) / ALEKSEEV ANDREJ GRIGOREVICH (author) / TUMANOV ALEKSANDR ALEKSEEVICH (author) / MIKHALDYKIN EVGENIJ SERGEEVICH (author) / BALASHOV DMITRIJ VIKTOROVICH (author)
2018-05-07
Patent
Electronic Resource
Russian
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2024
|COMBINED METHOD OF ARRANGEMENT OF PILE FOUNDATIONS IN PERMAFROST SOILS
European Patent Office | 2020
|Power equipment foundation pile foundation optimization arrangement method