METAL PILE FOUNDATION FOR PUMPING UNIT BOREHOLE RIG
FIELD: construction.SUBSTANCE: invention relates to pile foundations and can be used to transfer the load from the ground pump installed on the foundation of the pumping unit of a well pumping unit. Metal pile foundation for the pumping unit of a borehole rig includes piles made in the form of vertically arranged pipes and with a screw at the end, connecting the beams in the form of a channel for installing the base of the pumping unit. Number of connecting beams is two, and the length of each beam is chosen equal to the outer diameter of the pile pipe plus the distance between the two extreme pile pipes located in the same row of these pipes. Each beam is installed on the pipes of a separate row of piles, where the plane of symmetry of the rows of pipes of the piles passes along the axis of the well, and the distance from two pipe tubes located near the well, up to two pipe piles, remote from the well, are selected with the possibility of installing on this foundation the foundations of several types of pumping units. Both beams are mounted on plates welded to the upper ends of the pile pipes and connected to these plates by welding. Base of the pumping unit is attached to the beams with the help of plates or pipes having holes at the ends, and U-shaped bent studs that grip the channel of the base of the pumping unit and beams from above. Threaded ends of each stud pass through the holes in the plate or pipe and contain nuts to tighten the channels of the base of the pumping unit and the beam to each other. Two pile pipes located near the well and two pile pipes remote from the well are welded in two intersecting corner profiles, which are welded to each other using a plate.EFFECT: technical result consists in ensuring the unification of the metal pile foundation for the pumping unit of the borehole unit, allowing it to be used for different types of pumping units, reducing the material intensity of the foundation.1 cl, 5 dwg
Изобретение относится к свайным фундаментам и может быть использовано для передачи нагрузки от установленной на фундаменте станка-качалки скважинной насосной установки грунту. Металлический свайный фундамент для станка-качалки скважинной установки включает сваи, выполненные в виде вертикально расположенных труб и со шнеком на конце, соединяющие балки в виде швеллера для установки основания станка-качалки. Количество соединяющих балок равно двум, при этом длина каждой балки выбрана равной наружному диаметру трубы сваи плюс расстояние между двумя крайними трубами свай, расположенными в одном ряду этих труб. Каждая балка установлена на трубы отдельного ряда свай, где плоскость симметрии рядов труб свай проходит по оси скважины, причем расстояние от двух труб сваи, расположенных вблизи скважины, до двух труб сваи, удаленных от скважины, выбрано с возможностью установки на данный фундамент оснований нескольких типов станков-качалок. Обе балки установлены на пластины, приваренные к верхним торцам труб свай, и соединены с этими пластинами сваркой. Основание станка-качалки крепится к балкам с помощью пластин или труб, имеющих отверстия на концах, и П-образно согнутых шпилек, которые сверху обхватывают швеллера основания станка-качалки и балок. Резьбовые концы каждой шпильки проходят через отверстия пластины или трубы и содержат гайки для стягивания швеллеров основания станка-качалки и балки друг к другу. На две трубы сваи, расположенные вблизи скважины, и на две трубы сваи, удаленные от скважины, приварены по два пересекающихся уголковых профиля, которые приварены друг к другу с помощью пластины. Технический результат состоит в обеспечении унификации металлического свайного фундамента для станка-качалки скважинной установки, позволяющего использовать его для разных типов станков-качалок, снижении материалоемкости фундамента. 5 ил.
METAL PILE FOUNDATION FOR PUMPING UNIT BOREHOLE RIG
FIELD: construction.SUBSTANCE: invention relates to pile foundations and can be used to transfer the load from the ground pump installed on the foundation of the pumping unit of a well pumping unit. Metal pile foundation for the pumping unit of a borehole rig includes piles made in the form of vertically arranged pipes and with a screw at the end, connecting the beams in the form of a channel for installing the base of the pumping unit. Number of connecting beams is two, and the length of each beam is chosen equal to the outer diameter of the pile pipe plus the distance between the two extreme pile pipes located in the same row of these pipes. Each beam is installed on the pipes of a separate row of piles, where the plane of symmetry of the rows of pipes of the piles passes along the axis of the well, and the distance from two pipe tubes located near the well, up to two pipe piles, remote from the well, are selected with the possibility of installing on this foundation the foundations of several types of pumping units. Both beams are mounted on plates welded to the upper ends of the pile pipes and connected to these plates by welding. Base of the pumping unit is attached to the beams with the help of plates or pipes having holes at the ends, and U-shaped bent studs that grip the channel of the base of the pumping unit and beams from above. Threaded ends of each stud pass through the holes in the plate or pipe and contain nuts to tighten the channels of the base of the pumping unit and the beam to each other. Two pile pipes located near the well and two pile pipes remote from the well are welded in two intersecting corner profiles, which are welded to each other using a plate.EFFECT: technical result consists in ensuring the unification of the metal pile foundation for the pumping unit of the borehole unit, allowing it to be used for different types of pumping units, reducing the material intensity of the foundation.1 cl, 5 dwg
Изобретение относится к свайным фундаментам и может быть использовано для передачи нагрузки от установленной на фундаменте станка-качалки скважинной насосной установки грунту. Металлический свайный фундамент для станка-качалки скважинной установки включает сваи, выполненные в виде вертикально расположенных труб и со шнеком на конце, соединяющие балки в виде швеллера для установки основания станка-качалки. Количество соединяющих балок равно двум, при этом длина каждой балки выбрана равной наружному диаметру трубы сваи плюс расстояние между двумя крайними трубами свай, расположенными в одном ряду этих труб. Каждая балка установлена на трубы отдельного ряда свай, где плоскость симметрии рядов труб свай проходит по оси скважины, причем расстояние от двух труб сваи, расположенных вблизи скважины, до двух труб сваи, удаленных от скважины, выбрано с возможностью установки на данный фундамент оснований нескольких типов станков-качалок. Обе балки установлены на пластины, приваренные к верхним торцам труб свай, и соединены с этими пластинами сваркой. Основание станка-качалки крепится к балкам с помощью пластин или труб, имеющих отверстия на концах, и П-образно согнутых шпилек, которые сверху обхватывают швеллера основания станка-качалки и балок. Резьбовые концы каждой шпильки проходят через отверстия пластины или трубы и содержат гайки для стягивания швеллеров основания станка-качалки и балки друг к другу. На две трубы сваи, расположенные вблизи скважины, и на две трубы сваи, удаленные от скважины, приварены по два пересекающихся уголковых профиля, которые приварены друг к другу с помощью пластины. Технический результат состоит в обеспечении унификации металлического свайного фундамента для станка-качалки скважинной установки, позволяющего использовать его для разных типов станков-качалок, снижении материалоемкости фундамента. 5 ил.
METAL PILE FOUNDATION FOR PUMPING UNIT BOREHOLE RIG
МЕТАЛЛИЧЕСКИЙ СВАЙНЫЙ ФУНДАМЕНТ ДЛЯ СТАНКА-КАЧАЛКИ СКВАЖИННОЙ УСТАНОВКИ
MARDANSHIN ILDAR ILGIZOVICH (author) / VAFIN ILDUS ZAKEEVICH (author)
2019-01-31
Patent
Electronic Resource
Russian
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of end bearing pile foundation for borehole backfilling